久久久勾缠精品夜色|99勾缠成人高清在线观看|一级做a爰片欧美一区|熟妇人素无码中文字幕|久久久勾缠精品欧美激情|欧美日韩一区精品在线|勾缠精品美女自在线观看免费|欧美另类极品videosbest视|日韩v欧美V另类蜜桃|麻豆久久五月综合勾缠

網(wǎng)站公告-NOTICE

新聞資訊

當(dāng)前位置:首頁 / 新聞資訊

山東工程人警惕!橋架敷線踩這坑必返工,監(jiān)理當(dāng)場叫停,國標(biāo)早有明確規(guī)定

  山東工程人警惕!橋架敷線踩這坑必返工,監(jiān)理當(dāng)場叫停,國標(biāo)早有明確規(guī)定

  Shandong engineers are vigilant! The cable tray laying must be reworked if this pit is stepped on, and the supervisor stopped it on the spot. The national standard has long had clear regulations

  在山東做建筑、電氣工程的朋友,大概率見過這樣的場景:電纜橋架敷設(shè)完工后,監(jiān)理到場驗(yàn)收,一眼就發(fā)現(xiàn)問題,當(dāng)場要求停工返工——配電箱、主電纜和消防信號(hào)線纜,一股腦全鋪在同一個(gè)橋架里,沒有做任何隔離處理。別覺得這是“小事”,這種違規(guī)操作不僅通不過驗(yàn)收,還會(huì)留下嚴(yán)重的用電隱患,后期返工既費(fèi)錢又誤工。今天就用大白話+實(shí)打?qū)嵉臄?shù)據(jù),結(jié)合國標(biāo)要求,給山東工程人、采購方嘮透山東電纜橋架敷設(shè)的核心禁忌,看完再也不踩這種低級(jí)坑。

  Friends who work in construction and electrical engineering in Shandong have probably seen such a scene: after the cable tray is laid, the supervisor arrives for inspection and immediately discovers the problem, requiring work to be stopped and reworked - the distribution box, main cable, and fire signal cable are all laid in the same tray without any isolation treatment. Don't think of this as a 'small matter'. This kind of illegal operation not only fails the acceptance inspection, but also leaves serious electrical safety hazards. Rework in the later stage is both costly and time-consuming. Today, using plain language and concrete data, combined with national standard requirements, we will explain to Shandong engineers and purchasers the core taboos of cable tray laying in Shandong. After reading, we will never step on such low-level pitfalls again.

  先給大家說個(gè)真實(shí)案例,也是山東本地工程常犯的錯(cuò):濟(jì)南某寫字樓電氣施工中,施工隊(duì)圖省事,將主電力電纜(380V)、配電箱連接線和消防信號(hào)線纜,共同敷設(shè)在同一個(gè)無隔離的槽式橋架內(nèi),總長度約80米,驗(yàn)收時(shí)被監(jiān)理當(dāng)場叫停,要求全部返工。返工不僅要重新拆除、分揀電纜,還要增設(shè)隔離措施或分橋架敷設(shè),額外花費(fèi)2.3萬元,工期延誤5天,得不償失。據(jù)山東建筑行業(yè)統(tǒng)計(jì),每年因電纜橋架敷設(shè)違規(guī)導(dǎo)致的返工率達(dá)29%,其中不同電壓、不同用途電纜混敷的情況占比62%,是常見也容易被忽視的違規(guī)點(diǎn)。

  First of all, let me give you a real case, which is also a common mistake in local engineering in Shandong: during the electrical construction of an office building in Jinan, the construction team tried to save time by laying the main power cable (380V), distribution box connection line, and fire signal cable together in the same non isolated trough bridge, with a total length of about 80 meters. However, during the acceptance inspection, they were stopped by the supervisor on the spot and required to rework all of them. Rework not only requires dismantling and sorting cables again, but also adding isolation measures or laying cable trays, which costs an additional 23000 yuan and delays the construction period by 5 days, which is not worth the loss. According to statistics from the construction industry in Shandong, the annual rework rate caused by violations of cable tray laying is 29%. Among them, the situation of mixing cables of different voltages and purposes accounts for 62%, which is the most common and easily overlooked violation point.

  很多施工隊(duì)之所以犯這種錯(cuò),要么是圖省事、趕工期,要么是對(duì)規(guī)范不了解,覺得“只要能放下電纜,敷在一起沒關(guān)系”??蓪?shí)際上,這種操作嚴(yán)重違反國標(biāo),還藏著極大的隱患。劃紅線:根據(jù)國標(biāo)GB 51348-2019《民用建筑電氣設(shè)計(jì)標(biāo)準(zhǔn)》第8.5.13條明確規(guī)定,不同電壓、不同用途的電纜應(yīng)分開鋪設(shè),不應(yīng)敷設(shè)在同一個(gè)橋架內(nèi),這是電纜橋架敷設(shè)的“鐵規(guī)矩”,山東所有建筑、工業(yè)工程都必須嚴(yán)格遵守。

  Many construction teams make this mistake either to save time and meet deadlines, or because they are not familiar with the specifications and think that 'as long as the cables can be laid down and laid together, it's okay'. However, in reality, this operation seriously violates national standards and poses significant safety hazards. Key red line marking: According to Article 8.5.13 of the national standard GB 51348-2019 "Electrical Design Standards for Civil Buildings", cables of different voltages and purposes should be laid separately and should not be laid in the same cable tray. This is the "iron rule" for cable tray laying, and all buildings and industrial projects in Shandong must strictly comply with it.

  可能有山東工程人會(huì)問,為啥不能敷在一起?核心原因有兩個(gè),既關(guān)乎,也關(guān)乎設(shè)備正常運(yùn)行。個(gè)原因,避免信號(hào)干擾,尤其是消防、弱電信號(hào)。主電纜是高壓電力電纜,運(yùn)行時(shí)會(huì)產(chǎn)生強(qiáng)電磁干擾,而消防信號(hào)線纜、弱電線纜(比如監(jiān)控、通訊線纜)靈敏度極高,一旦被干擾,就會(huì)出現(xiàn)信號(hào)中斷、誤報(bào)等問題。比如山東某工廠曾因消防信號(hào)線纜與主電纜混敷,發(fā)生火災(zāi)時(shí)消防報(bào)警系統(tǒng)失靈,延誤了救援時(shí)機(jī),造成額外損失,這類案例在山東每年都會(huì)發(fā)生10余起。

  Some Shandong engineers may ask, why can't they be applied together? There are two core reasons, which are related to both safety and the normal operation of the equipment. The first reason is to avoid signal interference, especially for fire and weak current signals. The main cable is a high-voltage power cable that generates strong electromagnetic interference during operation, while fire signal cables and weak current cables (such as monitoring and communication cables) have extremely high sensitivity. Once interfered, problems such as signal interruption and false alarms may occur. For example, a factory in Shandong once experienced a fire when the fire alarm system malfunctioned due to the mixing of fire signal cables and main cables, delaying the rescue opportunity and causing additional losses. Such cases occur more than 10 times a year in Shandong.

  第二個(gè)原因,防范事故,降低隱患風(fēng)險(xiǎn)。不同電壓的電纜混敷,一旦其中一根電纜絕緣層破損,就會(huì)發(fā)生短路、漏電,甚引發(fā)火災(zāi);而消防信號(hào)線纜屬于應(yīng)急保障線路,若與主電纜混敷,一旦主電纜出現(xiàn)故障,消防線纜也會(huì)被牽連損壞,火災(zāi)時(shí)無法正常傳輸信號(hào),后果不堪設(shè)想。據(jù)統(tǒng)計(jì),山東因電纜混敷導(dǎo)致的電氣火災(zāi),占電纜相關(guān)火災(zāi)的37%,其中80%都是因?yàn)槲窗磭鴺?biāo)要求分開敷設(shè)、未做隔離造成的。

  The second reason is to prevent safety accidents and reduce hidden risks. Mixing cables of different voltages, once one of the insulation layers of the cable is damaged, short circuits, leakage, and even fires can occur; And the fire signal cable belongs to the emergency support line. If it is mixed with the main cable, once the main cable fails, the fire signal cable will also be damaged and cannot transmit signals normally during a fire, and the consequences will be unimaginable. According to statistics, electrical fires caused by mixed cable laying in Shandong account for 37% of cable related fires, of which 80% are caused by failure to separate and isolate cables according to national standards.

  這里給山東工程人明確,哪些電纜不能混敷在同一個(gè)橋架內(nèi),對(duì)照自查不踩坑:一是高壓電纜(1kV以上)與低壓電纜(1kV以下),比如工廠的主電力電纜和辦公室的照明電纜;二是電力電纜與消防專用線纜,比如主電纜和消防信號(hào)、應(yīng)急照明電纜,尤其要注意,即使加隔板,普通負(fù)荷與消防負(fù)荷的電纜也不建議同橋架敷設(shè),火災(zāi)時(shí)隔板無法完全保證消防線纜;三是電力電纜與弱電線纜,比如主電纜和網(wǎng)線、監(jiān)控線纜;四是向同一負(fù)荷供電的兩回路電源電纜,也需分開敷設(shè)。

  Here, it is clear to Shandong engineers which cables must not be mixed and laid in the same cable tray, and self inspection should be conducted to avoid pitfalls: firstly, high-voltage cables (above 1kV) and low-voltage cables (below 1kV), such as the main power cables in factories and lighting cables in offices; Secondly, power cables and fire protection cables, such as main cables, fire signal cables, and emergency lighting cables, should be paid special attention to. Even if partitions are added, it is not recommended to lay cables for ordinary loads and fire loads on the same bridge, as partitions cannot fully guarantee the safety of fire protection cables during a fire; The third is power cables and weak current cables, such as main cables, network cables, and monitoring cables; The fourth is that the two circuit power cables that supply power to the same load also need to be laid separately.

  結(jié)合山東工程常見場景,給大家說兩種正確的敷設(shè)方式,簡單好操作,還符合國標(biāo)要求。種,分橋架敷設(shè),這是穩(wěn)妥、常用的方式,占山東合規(guī)工程的78%。不同電壓、不同用途的電纜,分別敷設(shè)在獨(dú)立的橋架內(nèi),橋架之間的間距不小于0.5m,若有屏蔽蓋板,可縮小0.3m,既能徹底避免干擾,又能降低隱患,比如濟(jì)南高新區(qū)的工廠、遙墻國際機(jī)場的布線,大多采用這種方式。

  Based on common scenarios in Shandong engineering, let me explain two correct laying methods that are simple and easy to operate, and also comply with national standards. The first method is to lay cable trays separately, which is the most secure and commonly used approach, accounting for 78% of compliance projects in Shandong. Cables of different voltages and purposes are laid separately in independent cable trays, with a spacing of no less than 0.5m between trays. If there is a shielding cover plate, it can be reduced to 0.3m, which can completely avoid interference and reduce safety hazards. For example, this method is mostly used for wiring in factories in Jinan High tech Zone and remote international airports.

  第二種,同橋架但加專用隔離板,僅適用于受場地限制、無法分橋架敷設(shè)的場景,且嚴(yán)禁用于消防線纜與普通電力電纜的敷設(shè)。隔離板需采用防火、絕緣材質(zhì),厚度≥1.5mm,高度與橋架高度一致,能將橋架內(nèi)部徹底分隔成獨(dú)立空間,每一個(gè)空間僅敷設(shè)一種類型的電纜,同時(shí)電纜在橋架內(nèi)的填充率需符合要求,電力電纜不超過40%,控制電纜不超過50%,避免因電纜過密導(dǎo)致散熱不良。這種方式比分橋架敷設(shè)節(jié)省成本30%左右,但后期檢修難度稍大,需做好標(biāo)記,方便區(qū)分電纜類型。

  The second option is to use the same cable tray but with a dedicated isolation board, which is only suitable for scenarios where it is limited by the site and cannot be laid separately. It is strictly prohibited to use it for laying fire cables and ordinary power cables. The isolation board should be made of fire-resistant and insulating materials, with a thickness of ≥ 1.5mm and a height consistent with the height of the bridge. It should be able to completely separate the interior of the bridge into independent spaces, with only one type of cable laid in each space. At the same time, the filling rate of cables in the bridge should meet the requirements, with no more than 40% for power cables and no more than 50% for control cables, to avoid poor heat dissipation caused by overly dense cables. This method saves about 30% of the cost of laying cable trays, but it is slightly more difficult to maintain in the later stage and requires proper labeling to facilitate the differentiation of cable types.
梯式電纜橋架

  補(bǔ)充一組山東本地實(shí)用數(shù)據(jù),幫大家重視這個(gè)問題:山東電纜橋架敷設(shè)違規(guī),不僅會(huì)被監(jiān)理要求返工,若違規(guī)驗(yàn)收通過后被抽查發(fā)現(xiàn),還會(huì)面臨5000-5萬元的罰款,情節(jié)嚴(yán)重的會(huì)被責(zé)令停工整改;返工成本平均每米35-80元,80米的布線返工,僅人工+材料成本就超2萬元,還會(huì)延誤工期,影響工程回款。另外,合規(guī)敷設(shè)的電纜橋架,后期電纜故障率可降低82%,檢修效率提升60%,長期來看更省心、更省錢。

  Add a set of local practical data in Shandong to help everyone pay attention to this issue: if the cable tray laying in Shandong violates regulations, not only will it be required to rework by the supervisor, but if it is found through spot checks after passing the inspection, it will also face a fine of 50-50000 yuan, and those with serious circumstances will be ordered to stop work for rectification; The average cost of rework is 35-80 yuan per meter. For 80 meters of wiring rework, the labor and material costs alone exceed 20000 yuan, which will also delay the construction period and affect project payment. In addition, compliant cable trays can reduce cable failure rates by 82% and increase maintenance efficiency by 60% in the later stage, making them more worry free and cost-effective in the long run.

  總結(jié)來說,山東電纜橋架敷設(shè),看似簡單,實(shí)則有嚴(yán)格的國標(biāo)要求,不同電壓、不同用途的電纜混敷,不是“小事”,而是會(huì)導(dǎo)致返工、罰款、隱患的“大坑”。不管是施工隊(duì)還是采購方,都別圖省事、省成本,忽視規(guī)范要求。遵循國標(biāo)GB 51348-2019第8.5.13條規(guī)定,要么分橋架敷設(shè),要么同橋架加合規(guī)隔離板(不含消防線纜場景),才能確保工程合規(guī)、用電。希望這篇科普能幫到山東的工程人們,避開返工坑、坑,讓工程順利推進(jìn),覺得有用的話,別忘了點(diǎn)贊轉(zhuǎn)發(fā),提醒身邊更多同行~

  In summary, the installation of cable trays in Shandong may seem simple, but in reality there are strict national standards. Mixing cables of different voltages and purposes is not a "small matter", but a "big hole" that can lead to rework, fines, and safety hazards. Whether it's the construction team or the procurement party, don't try to save time and costs, and ignore regulatory requirements. According to the provisions of Article 8.5.13 of the national standard GB 51348-2019, either separate cable trays should be laid or compliant isolation plates should be added to the cable trays (excluding fire cable scenarios) to ensure project compliance and electrical safety. I hope this science popularization can help engineers in Shandong avoid rework and safety pitfalls, and ensure the smooth progress of the project. If you find it useful, don't forget to like and share it, reminding more colleagues around you

上一篇:濟(jì)南人避坑!橋架≠線槽,90%工程人都搞混,一字之差差千里
下一篇:濟(jì)南電纜橋架選購指南:熱鍍鋅與熱浸鋅一字之差,應(yīng)用場景與天壤之別
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
亚洲精品字幕久久久久| 爆乳女教师一区二区三| 欧美伊人大综合| 先锋资源在线| 99r在线观看| 高清不卡视频| 丰满人妻少妇久久久久久久久久久久| 无码AV一区| 精品久久久中文字幕人妻| 国产婷婷色| 中文字幕欧美日韩精品| 亚洲色精品| 久久精品麻豆| 亚洲人欧洲人非洲人基因差别 | 欧美国产三级| 老熟女91| 久久大胆人体艺术| 91精品国产综合久久久久| 91精品国产综合久久久久久| 伊人久久久久久久久久| 麻豆精品无码国产| 人人澡视频| 在线不卡无码视频| 国产自产21区| 中文无码专区| 午夜免费av| 91超碰免费在线| 亚洲乱码一区二区三| 性高湖久久久久久久久aaaaa| 天天三级片| 精品国产AV一区二区| 91日韩精品| 日本午夜福利在线观看| 久久露脸国语精品国产91| 婷婷丁香五月婷婷| 91无码高清| 九一精品国产| 日本午夜一区二区| 91精品国产乱码久久久久| 一本高清无码视频| 国产99999|