保證電纜橋架質(zhì)量的措施有哪些?
1、施工前組織施工人員進(jìn)行技術(shù)交底工作,并做好交底會(huì)簽,將責(zé)任落實(shí)到每一個(gè)操作工人。
1. Organize the construction personnel to carry out technical submission work before construction, and do a good job of submission meeting signature, and implement the responsibility to every operator.
2、材料進(jìn)入施工現(xiàn)場,必須按產(chǎn)品標(biāo)準(zhǔn)及規(guī)定程序進(jìn)行檢查驗(yàn)收,并做好記錄及材料報(bào)驗(yàn)工作,嚴(yán)禁不合格產(chǎn)品用于工程中。
2. When materials enter the construction site, they must be inspected and accepted according to the product standards and prescribed procedures, and record and material inspection should be done well. It is strictly forbidden to use unqualified products in engineering.
3、熟悉設(shè)計(jì)圖紙,理解并掌握設(shè)計(jì)意圖,發(fā)現(xiàn)問題及時(shí)聯(lián)系建設(shè)、監(jiān)理、設(shè)計(jì)單位,做好圖紙會(huì)審工作。
3. Familiar with design drawings, understand and master design intentions, contact construction, supervision and design units when problems are found, and do a good job of drawing auditing.
4、橋架的運(yùn)輸和堆放應(yīng)附合有關(guān)規(guī)定,注意防潮防污。
4. Transportation and stacking of bridge frames should be accompanied by relevant regulations, and attention should be paid to moisture-proof and pollution-proof.
5、使用高凳時(shí),注意不要碰壞建筑物的墻面及門窗。
5. When using high benches, be careful not to touch the walls and doors and windows of buildings.
6、嚴(yán)格按標(biāo)準(zhǔn)、規(guī)范、規(guī)程及設(shè)計(jì)圖紙組織施工,施工中應(yīng)與水暖、土建密切配合,施工質(zhì)量必須符合現(xiàn)行標(biāo)準(zhǔn)及規(guī)范規(guī)定。


6. Construction should be organized in strict accordance with standards, norms, regulations and design drawings. Construction should be closely coordinated with plumbing and civil engineering specialties. Construction quality must conform to current standards and norms.
7、施工過程中及時(shí)做好中間檢查工作,發(fā)現(xiàn)問題及時(shí)解決,施工完后,做好自檢工作,自檢通過后再通知監(jiān)理單位工程師進(jìn)行隱蔽前驗(yàn)收工作。
7. In the process of construction, do a good job of intermediate inspection, find problems and solve them in time. After completion of construction, do a good job of self-inspection, and inform the professional engineers of supervision units to check and accept the work before concealment.
8、技術(shù)資料應(yīng)隨工程進(jìn)度及時(shí)報(bào)驗(yàn)、整理,按系統(tǒng)分類、歸檔,各種原始檢測記錄應(yīng)真實(shí)、準(zhǔn)確、齊全。
8. Technical data should be submitted and collated in time with the progress of the project, classified and filed according to the system, and all kinds of original testing records should be true, accurate and complete.
9、對于易發(fā)生受污生部位(如機(jī)房、電氣豎井等)的橋架,應(yīng)注意檢查,發(fā)現(xiàn)后及時(shí)處理,補(bǔ)刷防銹漆。
9. For bridges that are liable to contamination (such as machine rooms, electrical shafts, etc.), attention should be paid to inspection, timely treatment after discovery, and repairing rust-proof paint.
本文精彩內(nèi)容由電纜橋架整理提供!希望通過小編的介紹對大家有所幫助,我們的官網(wǎng)是:http://www.chenchen1688.com多謝大家的閱讀觀看!
The wonderful content of this article is provided by the cable bridge arrangement! Hope to help you through the introduction of Xiaobian, our official website is: http://www.chenchen1688.com Thank you for reading and watching!
上一篇:電纜橋架的施工質(zhì)量控制要點(diǎn)!
下一篇:電纜橋架施工無小事!
下一篇:電纜橋架施工無小事!
相關(guān)文章 / Recommended news
- 鍍鋅橋架是一種用于承載和保護(hù)電纜的結(jié)構(gòu)
- 濟(jì)南電纜橋架選購指南:熱鍍鋅與熱浸鋅一字之差,應(yīng)用場景與天壤之別
- 山東工程人必看!橋架安裝驗(yàn)收7大硬標(biāo)準(zhǔn),少一項(xiàng)都要返工,附詳細(xì)數(shù)據(jù)
- 濟(jì)南廠房福音!大跨距橋架破解3大痛點(diǎn),加強(qiáng)筋加,安裝省一半錢
- 山東工程人警惕!橋架敷線踩這坑必返工,監(jiān)理當(dāng)場叫停,國標(biāo)早有明確規(guī)定
- 濟(jì)南人避坑!橋架≠線槽,90%工程人都搞混,一字之差差千里
- 避坑指南!山東電纜橋架規(guī)格別瞎選,偏大浪費(fèi)偏小隱患大,國標(biāo)早就定好了
- 濟(jì)南人必看!鋁合金電纜橋架選對厚度,耐用又省心,90%的人選錯(cuò)踩坑
- 山東人必看!電纜橋架不是“鐵架子”,藏著建筑用電的密碼,90%的人都不懂
- 800kg/m抗壓!濟(jì)南電纜橋架,破解3大工程痛點(diǎn),工期省30%
陽極氧化鋁合金橋架
托盤式電纜橋架
梯式電纜橋架
梯式不銹鋼電纜橋架
深灰色金屬防火電纜橋架