久久久勾缠精品夜色|99勾缠成人高清在线观看|一级做a爰片欧美一区|熟妇人素无码中文字幕|久久久勾缠精品欧美激情|欧美日韩一区精品在线|勾缠精品美女自在线观看免费|欧美另类极品videosbest视|日韩v欧美V另类蜜桃|麻豆久久五月综合勾缠

網(wǎng)站公告-NOTICE

新聞資訊

當前位置:首頁 / 新聞資訊

電力電纜排管質量缺陷與防治詳解

山東電纜橋架廠家給大家整理了電力電纜排管質量缺陷與防治方法,希望那個對大家有所幫助!
Shandong Cable Bridge Frame Manufacturer has sorted out the quality defects and prevention methods of power cable piping, hoping that it will be helpful to you all! 
1.問題:基槽開挖內部積水
1. Problem: Water accumulation in foundation trench excavation
隱患:基坑積水浸泡后,地基土質變軟,承載力降低其,引起管渠基礎下沉,造成管渠結構折裂損壞
Hidden danger: After the foundation pit is immersed in water, the foundation soil becomes soft and the bearing capacity decreases, which causes the subsidence of the foundation of the pipeline and canal, and causes the fracture and damage of the structure of the pipeline and canal.
原因分析:1)自然降水或其它落水流進基槽,造成積水;
Reason analysis: 1) Natural precipitation or other falling water flows into the foundation trough, causing water accumulation;
2)地下水、滯水,未采取排降、降水措施
2) Groundwater, stagnant water, no drainage and precipitation measures
預防措施:1)雨季施工,須將基槽周邊開挖排水溝,防止落水流入槽內;
Preventive measures: 1) In rainy season construction, drainage ditches should be excavated around the foundation trench to prevent water falling into the trench;
2)排水溝應接通原排水管網(wǎng),開槽宜在枯水期施工;
2) Drainage ditches should be connected to the original drainage network, and grooving should be constructed in dry season.
3)在地下水位以下或有淺層滯水地段挖槽,應采用排水溝、集水井、井點排降水措施;
3) Drainage ditches, catchment wells and well-point drainage measures should be adopted to dig ditches below the groundwater level or in shallow water-holding areas.
4)按照設計要求做好放坡施工
4) Sloping construction according to design requirements
山東電纜橋架
2.問題:排管不整齊,回填不規(guī)范
2. Problem: Unorderly drainage and irregular backfilling
隱患:管道擠壓變形,降低使用壽命
Hidden danger: pipe extrusion deformation, reduce service life
原因分析:1)未按照設計、規(guī)范施工;
Reason analysis: 1) Failure to comply with design and specification of construction;
2)回填土用雜物回填
2) Sundries Backfilling for Backfilling
3)質量管理不到位,工程驗收不細致。
3) The quality management is not in place and the project acceptance is not meticulous.
預防措施:1)嚴格按照作業(yè)指導書、規(guī)范施工
Preventive measures: 1) Construction in strict accordance with operation instructions and specifications
2)按規(guī)范整齊安裝排管,并進行固定;
2) Install and fix the pipes neatly according to the specifications;
3)回填前應坑內積水、雜物等,回填土應每300mm夯實一次,后必須培出高于地面300mm的防沉層
3) Water and debris in the pit should be removed before backfilling. The backfill should be compacted every 300 mm. Finally, the Anti-subsidence layer 300 mm above the ground must be cultivated.
好了,今天的內容就先給大家介紹到這里了,收藏山東電纜橋架廠家官網(wǎng):http://www.chenchen1688.com,可以了解更多詳細信息!
Okay, today's content will be introduced to you first, collect the official website of Shandong Cable Bridge Manufacturer: http://www.chenchen1688.com, you can learn more details!
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
久久免费看毛片| 日本亚洲一区| 飘零影院电视剧免费观看| 久久精品视频免费| 国产精品久久久久久吹潮| √资源天堂中文在线视频| 成人无码高清视频| 成人三级经典| 国产精品黄色片| 精品无码一区二区三区老师| 丁香婷婷六月| 超碰人人妻| 国产综合久久| 欧美特级黄片| 免费看又黄又无码的网站| 精品欧美日韩| 国产精品 - 色哟哟| 嗯啊好爽视频| 74影院| 国产又长又大又粗| 日本韩国无码| 欧美日韩精品在线观看视频| AV片一区二区| 精品无码人妻一区| 91欧美激情一区二区三区成人| 国产激情av| 久久最新| 日本五十路在线| 亚洲人妻熟妇| 亚洲一区二区三区四区在线观看| 国产精品人人人人| 国产精品视频一区二区三区不卡| 亚洲精品国产成人AV在线| 一本色道久久综合亚洲精品酒店| 日本高清无码| 免费久久久| 午夜福利视频在线观看免费| 天天插天天射天天日| 精品乱码久久久久久| 麻豆小电影| 中文无码日韩欧美久久|