濟(jì)南電纜橋架安裝施工要求及規(guī)范

  電纜橋架在我國(guó)的應(yīng)用只有十多年,在歐美發(fā)達(dá)也不過是幾十年。在一個(gè)機(jī)房項(xiàng)目中,比起造價(jià)昂貴、高科技的硬件和軟件,橋架顯的很不起眼,也很少為人關(guān)注,但它卻也是整個(gè)布線工程中不可缺少的部分。那么在施工中電纜橋架安裝施工要求及規(guī)范怎么樣?

  The application of cable trays in China has only been more than ten years, and in developed countries in Europe and America, it is only a few decades. In a computer room project, compared to expensive and high-tech hardware and software, cable trays may appear inconspicuous and receive little attention, but they are still an indispensable part of the entire cabling project. So what are the requirements and standards for the installation of cable trays during construction?base64_image

  1 一般規(guī)定  1.1本章適用于電壓為10KV及以下新建擴(kuò)建的一般工業(yè)與民用建筑電纜、橋架安裝和橋架內(nèi)電纜敷設(shè)

  1 General Provisions 1.1 This chapter applies to the installation of cables, cable trays, and cable laying inside cable trays for newly constructed and expanded general industrial and civil buildings with a voltage of 10KV or below

  1.2電纜橋架安裝和橋架內(nèi)電纜敷設(shè),應(yīng)按已批準(zhǔn)的設(shè)計(jì)文件施工。

  1.2 The installation of cable trays and the laying of cables inside the trays shall be carried out in accordance with the approved design documents.

  1.3由支、吊、托架支撐的托盤(槽)或梯架直線段、彎通非直線段組合而成,敷設(shè)電纜具有連續(xù)性的剛性結(jié)構(gòu)系統(tǒng),為電纜橋架。見圖1.3

  1.3 A rigid structural system consisting of trays (troughs) or ladder straight sections and curved non straight sections supported by supports, hangers, and brackets, with continuous cable laying, is called a cable tray. Refer to Figure 1.3

  1.4 金屬電纜橋架及其支架和引入或引出的金屬電纜導(dǎo)管必須接地(PE)或接零(PEN)可靠,且必須符合下列規(guī)定:

  1.4 Metal cable trays and their supports, as well as metal cable conduits introduced or led out, must be reliably grounded (PE) or grounded (PEN), and must comply with the following regulations:

  1.4.1金屬電纜橋架及支架全長(zhǎng)應(yīng)不少于2處與接地(PE)或接零(PEN)干線相連接;

  1.4.1 The total length of metal cable trays and supports should be connected to the grounding (PE) or neutral (PEN) main line at no less than 2 points;

  1.4.2非鍍鋅電纜橋架間連接板的兩端跨接線銅芯接地線,接地線小允許截面積不小于4mm2;

  1.4.2 Copper core grounding wire for the two ends of the connecting plate between non galvanized cable trays, with a minimum allowable cross-sectional area of not less than 4mm2 for the grounding wire;

  1.4.3鍍鋅電纜橋架間連接板的兩端不跨接接地線,但連接板兩端不少于2個(gè)有防松螺帽或防松墊圈的連接固定螺栓。

  1.4.3 The two ends of the connecting plate between galvanized cable trays shall not be connected to the grounding wire, but there shall be no less than 2 connection fixing bolts with anti loosening nuts or anti loosening washers at both ends of the connecting plate.

  1.4.5電纜敷設(shè)嚴(yán)禁有絞擰、鎧裝壓扁、護(hù)層斷裂和表面嚴(yán)重劃傷等缺陷。

  1.4.5 Cable laying must strictly prohibit defects such as twisting, flattening of armor, breakage of protective layer, and severe surface scratches.

  1.4.6電纜橋架處如有防火要求的場(chǎng)所,應(yīng)采取防火隔離措施。

  If there are fire prevention requirements at the cable tray location, fire isolation measures should be taken.

  2 施工準(zhǔn)備

  2. Construction preparation

  2.1 技術(shù)準(zhǔn)備:

  2.1 Technical Preparation:

  2.1.1按照已批準(zhǔn)的施工組織設(shè)計(jì)(施工方案)進(jìn)行技術(shù)、交底。

  2.1.1 Conduct technical and safety briefings in accordance with the approved construction organization design (construction plan).

  2.1.2 施工執(zhí)行工藝標(biāo)準(zhǔn)、圖集、規(guī)范齊全。

  2.1.2 The construction execution process standards, drawings, and specifications are complete.

  2.1.3電纜橋架敷設(shè)前,應(yīng)檢查橋架敷設(shè)有無與其他設(shè)備、管線交叉或重疊無法施工的地方,施工前應(yīng)與各工種、監(jiān)理或建設(shè)單位及設(shè)計(jì)單位協(xié)商好,并作好記錄,以保證施工順利進(jìn)行。

  Before laying cable trays, it is necessary to check whether there are any areas where the tray crosses or overlaps with other equipment or pipelines that cannot be constructed. Prior to construction, it is necessary to consult with various trades, supervisors, construction units, and design units, and make records to ensure smooth construction.

  2.1.4根據(jù)施工圖或施工所用電纜應(yīng)作好電纜牽引力的計(jì)算。

  2.1.4 According to the construction drawings or the cables used for construction, the calculation of cable traction force should be carried out.

  1.電纜橋架規(guī)格及型號(hào)必須符合設(shè)計(jì)要求,附件齊全;橋架與配件、附件和緊固件各種型鋼均應(yīng)采用鍍鋅標(biāo)準(zhǔn)件。

  1. The specifications and models of cable trays must meet the design requirements, and all accessories must be complete; All types of steel for cable trays, accessories, attachments, and fasteners should use galvanized standard parts.

  2.各種規(guī)格電纜橋架的直線段、彎通、橋架附件及支、吊架立柱及型鋼等有產(chǎn)品合格證,橋架內(nèi)外應(yīng)光滑平整,無棱刺,不應(yīng)有扭曲翹邊等變形現(xiàn)象。

  2. The straight sections, bends, accessories, supports, hangers, columns, and steel sections of various specifications of cable trays should have product certification. The inside and outside of the tray should be smooth and flat, without edges or burrs, and there should be no distortion or warping.

  3.橋架訂貨或制作應(yīng)按設(shè)計(jì)要求進(jìn)行,不應(yīng)有誤,應(yīng)反復(fù)校核以免造成浪費(fèi)。

  3. The ordering or production of cable trays should be carried out according to the design requirements, without errors, and should be repeatedly checked to avoid waste.

  4.橋架安裝選擇需屏蔽電氣干擾的電纜回路,有腐蝕的場(chǎng)所、易燃粉塵場(chǎng)所,應(yīng)選用無蓋無孔封閉型托盤,當(dāng)需要因地制宜的場(chǎng)所,宜選用組裝式托盤或有孔托盤及梯架;在容易積灰和其它需遮蓋的環(huán)境或戶外場(chǎng)所,宜帶有蓋板。低壓電力電纜與控制電纜共用同一托盤或梯架時(shí),應(yīng)選用中間有隔板的托盤或梯架;在托盤、梯架分支、引上、引下處應(yīng)設(shè)適當(dāng)?shù)膹澩?;因受空間條件限制不便裝設(shè)彎通或有特殊要求時(shí),可選用軟連接板,鉸接板;伸縮縫應(yīng)設(shè)置伸縮板;連接兩段不同寬度或高度的托盤、梯架可配置變寬或變高板。但在施工中,支、吊架和橋架的選擇應(yīng)依設(shè)計(jì)或工程布置條件選擇。

  4. When installing cable trays, cable circuits that need to be shielded from electrical interference should be selected. In places with corrosion and flammable dust, uncovered and non perforated enclosed trays should be used. When suitable for local conditions, assembled trays or perforated trays and ladders should be selected; In environments or outdoor places that are prone to dust accumulation and require cover, it is advisable to have a cover plate. When low-voltage power cables and control cables share the same tray or ladder, a tray or ladder with a partition in the middle should be selected; Appropriate bends should be installed at the branching, leading up, and leading down points of pallets and ladders; When it is not convenient to install bends due to space constraints or there are special requirements, soft connecting plates and hinged plates can be used; Expansion joints should be equipped with expansion plates; Connecting two trays or ladders of different widths or heights can be configured with variable width or height boards. However, during construction, the selection of supports, hangers, and cable trays should be based on the design or engineering layout conditions.

  5.托盤、梯架的寬和高度,應(yīng)按下列要求選擇:

  5. The width and height of pallets and ladders should be selected according to the following requirements:

  (1)電纜在橋架內(nèi)的填充率,電力電纜不應(yīng)大于40%;控制電纜不應(yīng)大于50%。并應(yīng)留有一定的備用空位,以便今后為增添電纜用;

  (1) The filling rate of cables in cable trays should not exceed 40% for power cables; The control cable should not exceed 50%. And there should be some spare space left for future cable additions;

  (2)所選托盤、橋架規(guī)格的承載能力應(yīng)滿足規(guī)定。其工作均布荷載不應(yīng)大于所選托盤、梯架荷載等級(jí)的額定均布荷載;

  (2) The bearing capacity of the selected tray and bridge specifications should meet the requirements. The uniformly distributed load of its work should not exceed the rated uniformly distributed load of the selected pallet and ladder load level;

  (3)工作均布荷載下的相對(duì)撓度不宜大于1/200。

  (3) The relative deflection under uniformly distributed load should not exceed 1/200.

  托盤、梯架直線段,可按單件標(biāo)準(zhǔn)長(zhǎng)度選擇。單件標(biāo)準(zhǔn)長(zhǎng)度一般規(guī)定為2、3、4、6m。托盤、梯架的寬度與高度常用規(guī)格尺寸系列如表2.4-1

  Tray and ladder straight sections can be selected according to the standard length of a single piece. The standard length of a single piece is generally specified as 2, 3, 4, and 6 meters. The commonly used specifications and dimension series for the width and height of pallets and ladders are shown in Table 2.4-1

  注:符號(hào)△表示常用規(guī)格。

  Note: The symbol △ represents commonly used specifications.

  各類彎通及附件規(guī)格,應(yīng)適合工程布置條件,并與托盤、梯架配套。

  All types of bends and accessory specifications should be suitable for the engineering layout conditions and matched with pallets and ladders.

  支、吊架規(guī)格選擇,應(yīng)按托盤、梯架規(guī)格層數(shù)、跨距等條件配置,并應(yīng)滿足荷載的要求。

  The selection of support and hanger specifications should be based on the number of layers, span, and other conditions of the pallet and ladder, and should meet the requirements of the load.

  鋼制橋架的表面處理方式,應(yīng)按工程環(huán)境條件、重要性、耐久性和技術(shù)經(jīng)濟(jì)性等因素進(jìn)行選擇。一般情況宜按表2.4-2選擇適用工程環(huán)境條件的防腐處理方式。當(dāng)采用表中“T”類防腐方式為鍍鋅鎳合金、高純化等其它防腐處理的橋架,應(yīng)按規(guī)定試驗(yàn)驗(yàn)證,并應(yīng)具有明確的技術(shù)質(zhì)量指標(biāo)及檢測(cè)方式。

  The surface treatment method for steel cable trays should be selected based on factors such as engineering environmental conditions, importance, durability, and technical economy. Generally, it is advisable to choose the anti-corrosion treatment method that is suitable for the engineering environmental conditions according to Table 2.4-2. When using the "T" anti-corrosion method in the table, such as galvanized nickel alloy, high-purity or other anti-corrosion treatments, the bridge should be tested and verified according to regulations, and should have clear technical quality indicators and testing methods.

  注:符號(hào)“○”表示防腐類別。

  Note: The symbol "○" indicates the recommended anti-corrosion category.

  6.橋架的外觀檢查

  6. Appearance inspection of bridge frame

  橋架產(chǎn)品包裝箱內(nèi)應(yīng)有裝箱清單、產(chǎn)品合格證及出廠檢驗(yàn)報(bào)告。托盤、梯架板材厚度應(yīng)滿足表2.6的規(guī)定。表面防腐層材料應(yīng)符合現(xiàn)行有關(guān)標(biāo)準(zhǔn)的規(guī)定。

  The packaging box for bridge products should include a packing list, product certification, and factory inspection report. The thickness of pallets and ladder boards should meet the requirements of Table 2.6. The surface anti-corrosion coating material should comply with the relevant national standards currently in effect.

  熱浸鍍鋅的托盤、橋架鍍層表面應(yīng)均勻,無毛刺、過燒、掛灰、傷痕、局部未鍍鋅(直徑2mm以上)等缺陷,不得有影響安裝的鋅瘤。螺紋的鍍層應(yīng)光滑,螺栓連接件應(yīng)能擰入。

  The surface of hot-dip galvanized trays and cable trays should be uniform, without defects such as burrs, overburning, hanging dust, scars, and partial non galvanizing (diameter of 2mm or more), and there should be no zinc nodules that affect installation. The coating of the thread should be smooth, and the bolt connection should be able to be screwed in.

  電鍍鋅的鋅層表面應(yīng)光滑均勻,致密。不得有起皮、氣泡、花斑、局部未鍍、劃傷等缺陷。

  The surface of the zinc layer of electroplated zinc should be smooth, uniform, and dense. There shall be no defects such as peeling, bubbles, flower spots, partial uncoated areas, scratches, etc.

  噴涂應(yīng)平整、光滑、均勻、不起皮、無氣泡水泡。

  The spraying should be smooth, even, without peeling or bubbles.

  橋架焊縫表面均勻,不得有漏焊、裂紋、夾渣、燒穿、弧坑等缺陷。

  The surface of the bridge welding seam should be uniform and free of defects such as missed welding, cracks, slag inclusion, burn through, arc craters, etc.

  橋架螺栓孔徑,在螺桿直徑不大于M16時(shí),可比螺桿直徑大2mm。

  The hole diameter of the bridge bolt can be 2mm larger than the screw diameter when the screw diameter is not greater than M16.

  螺栓連接孔的孔距允許偏差:同一組內(nèi)相鄰兩孔間距±0.7mm,同一組內(nèi)任意兩孔間距±1mm;相鄰兩組的端孔間距±1.2mm。

  The allowable deviation for the distance between bolt connection holes is: the distance between adjacent holes in the same group is ± 0.7mm, the distance between any two holes in the same group is ± 1mm, and the distance between end holes in adjacent groups is ± 1.2mm.

  7.膨脹螺栓:應(yīng)根據(jù)允許拉力和剪力進(jìn)行選擇;可按計(jì)劃驗(yàn)收,絲扣應(yīng)完好無損。

  7. Expansion bolts: should be selected based on allowable tensile and shear forces; The inspection can be carried out according to the plan, and the thread should be intact and undamaged.

  8.電纜應(yīng)有合格證和“CCC”認(rèn)證標(biāo)志,并應(yīng)有“CCC”認(rèn)證復(fù)印件;每盤電纜上應(yīng)標(biāo)明規(guī)格、型號(hào)、電壓等級(jí)、長(zhǎng)度及出廠日期電纜相應(yīng)完好無損。

  8. The cable should have a certificate of conformity and the "CCC" certification mark, and should have a copy of the "CCC" certification; Each cable reel should indicate the specifications, model, voltage level, length, and date of manufacture, and the cable should be intact and undamaged accordingly.

  9.電纜外觀完好無損,鎧裝無銹蝕、無機(jī)械操作,無皺折和扭曲現(xiàn)象。油浸電纜應(yīng)密封良好,無漏油及滲油現(xiàn)象。橡套及塑料電纜外皮及絕緣層無老化及裂紋。電纜端頭密封良好。

  9. The appearance of the cable is intact and undamaged, the armor is not corroded, there is no mechanical operation, and there is no wrinkling or twisting phenomenon. Oil immersed cables should be well sealed without oil leakage or seepage. The rubber sleeve and plastic cable sheath and insulation layer have no aging or cracks. The cable end is well sealed.

  10.其它附屬材料;電纜標(biāo)示牌、油漆、汽油、封鉛、硬脂酸白布帶、橡皮包布、黑包布、塑料絕緣帶等均應(yīng)符合要求

  10. Other ancillary materials; Cable signs, paint, gasoline, lead sealing, stearic acid white cloth tape, rubber wrap, black wrap, plastic insulation tape, etc. should all meet the requirements

  3 施工工藝

  3 Construction Techniques

  3.1 電纜橋架安裝施工工藝

  3.1 Construction process for cable tray installation

  3.1.1電纜橋架安裝工藝流程:

  3.1.1 Cable tray installation process:

  定位放線→預(yù)埋鐵件或膨脹螺栓→支、吊、托架安裝→橋架安裝→保護(hù)接地安裝

  Positioning and laying out → Pre embedded iron parts or expansion bolts → Installation of supports, hangers, and brackets → Installation of cable trays → Installation of protective grounding

  3.1.2根據(jù)施工圖確定始端到終端位置,沿圖紙標(biāo)定走向,找好水平、垂直、彎通,用粉線袋或畫線沿橋架走向在墻壁、頂棚、地面、梁、板、柱等處彈線或畫線,并均勻檔距畫出支、吊、托架位置。

  3.1.2 Determine the starting and ending positions according to the construction drawing, mark the direction along the drawing, find the horizontal, vertical, and curved lines, use a powder line bag or draw lines along the bridge direction to snap or draw lines on walls, ceilings, floors, beams, slabs, columns, etc., and draw the positions of supports, hangers, and brackets evenly spaced.

  3.1.3預(yù)埋鐵件或膨脹螺栓

  3.1.3 Pre embedded iron parts or expansion bolts

  (1) 預(yù)埋鐵件的自制加工不應(yīng)小于120mm×80mm×6mm,做法如本標(biāo)準(zhǔn)6.3.7.2圖6.3.7.2。其錨固圓鋼的直徑不小于10mm。

  (1) The self-made processing of embedded iron parts should not be less than 120mm × 80mm × 6mm, as shown in Figure 6.3.7.2 of this standard. The diameter of the anchored round steel shall not be less than 10mm.

  (2) 緊密配合土建結(jié)構(gòu)的施工,將預(yù)埋鐵件平面緊貼模板,將錨固圓鋼用綁扎或焊接的方法固定在結(jié)構(gòu)內(nèi)的鋼筋上;待混凝土模板拆除后,預(yù)埋鐵件平面外露,將支架、吊架或托架焊接在上面進(jìn)行固定。

  (2) Closely cooperate with the construction of civil engineering structures, tightly adhere the embedded iron parts to the formwork, and fix the anchoring round steel to the steel bars inside the structure by binding or welding; After the concrete formwork is removed, the embedded iron parts should be exposed on the surface, and the brackets, hangers or brackets should be welded on top for fixation.

  (3) 根據(jù)支架承受的荷重,選擇相應(yīng)的膨脹螺栓及鉆頭;埋好螺栓后,可用螺母配上相應(yīng)的墊圈將支架或吊架直接固定在金屬膨脹螺栓上,可參見本標(biāo)準(zhǔn)6.3.7.7圖表。

  (3) Select the corresponding expansion bolts and drill bits based on the load borne by the bracket; After burying the bolts, the bracket or hanger can be directly fixed to the metal expansion bolt with nuts and corresponding washers, as shown in Figure 6.3.7.7 of this standard.

  4.支、吊架安裝

  4. Installation of supports and hangers

  (1) 支架與吊架所用鋼材應(yīng)平直,無顯著扭曲。下料后長(zhǎng)短偏差應(yīng)在3mm范圍內(nèi),切口處應(yīng)無卷邊、毛刺;

  (1) The steel used for brackets and hangers should be straight and free from significant distortion. The length deviation after cutting should be within 3mm, and there should be no curled edges or burrs at the incision;

  (2) 鋼支架與吊架應(yīng)焊接牢固,無顯著變形,焊接前厚度超過4mm的支架、鐵件應(yīng)打坡口,焊縫均勻平整,焊縫長(zhǎng)度應(yīng)符合要求,不得出現(xiàn)裂紋、咬邊、氣孔、凹陷、漏焊等缺陷;

  (2) Steel brackets and hangers should be welded firmly without significant deformation. Brackets and iron parts with a thickness exceeding 4mm before welding should be chamfered, and the weld seam should be uniform and smooth. The weld seam length should meet the requirements and should not have defects such as cracks, undercutting, porosity, indentation, or missed welding;

  (3)支架與吊架應(yīng)安裝牢固,保證橫平豎直,在有坡度的建筑物上安裝支架與吊架應(yīng)與建筑物的坡度、角度一致;

  (3) The brackets and hangers should be installed firmly, ensuring horizontal and vertical alignment. When installing brackets and hangers on buildings with slopes, they should be consistent with the slope and angle of the building;

  支架與吊架的規(guī)格一般不應(yīng)小于扁鋼30mm×3mm;角鋼25mm×25mm×3mm;

  The specifications of brackets and hangers should generally not be less than 30mm × 3mm for flat steel and 25mm × 25mm × 3mm for angle steel;

 ?。?)嚴(yán)禁用電氣焊切割鋼結(jié)構(gòu)或輕鋼龍骨任何部位;

  (5) It is strictly prohibited to use electrical welding to cut any part of steel structures or light steel joists;

 ?。?)吊具應(yīng)采用定型產(chǎn)品,并應(yīng)有各自獨(dú)立的吊裝卡具或支撐系統(tǒng)。

  (6) Universal lifting devices should use standardized products and have their own independent lifting fixtures or support systems.

 ?。?)固定支點(diǎn)間距一般不應(yīng)大于1.5~2m。在進(jìn)出接線盒、箱、柜、轉(zhuǎn)角、轉(zhuǎn)彎和變形縫兩端及丁字接頭的三端500mm以內(nèi)應(yīng)設(shè)固定支持點(diǎn)。

  (7) The distance between fixed support points should generally not exceed 1.5-2m. Fixed support points should be set within 500mm at both ends of the entrance and exit junction boxes, boxes, cabinets, corners, bends, and deformation joints, as well as at the three ends of the T-shaped joint.

  (8)嚴(yán)禁用木磚固定支架與吊架。

  (8) It is strictly prohibited to use wooden bricks to fix brackets and hangers.

  5.橋架安裝

  5. Bridge installation

  (1) 電纜橋架水平敷設(shè)時(shí),支撐跨距一般為1.5~3m,電纜橋架垂直敷設(shè)時(shí)固定點(diǎn)間距不宜大于2m。橋架彎通彎曲半徑不大于300mm時(shí),應(yīng)在距彎曲段與直線段結(jié)合處300~600mm的直線段側(cè)設(shè)置一個(gè)支、吊架。當(dāng)彎曲半徑大于300mm時(shí),還應(yīng)在彎通中部增設(shè)一個(gè)支、吊架。支、吊架和橋架安裝必須考慮電纜敷設(shè)彎曲半徑滿足規(guī)范小彎曲半徑。見表3.1.5。

  (1) When laying cable trays horizontally, the support span is generally 1.5-3m. When laying cable trays vertically, the spacing between fixed points should not exceed 2m. When the bending radius of the tray is not greater than 300mm, a support or hanger should be set on the side of the straight section 300-600mm away from the junction of the curved section and the straight section. When the bending radius is greater than 300mm, a support or hanger should be added in the middle of the bend. The installation of supports, hangers, and cable trays must consider that the bending radius of cable laying meets the minimum bending radius specified in the specifications. See Table 3.1.5.

  注為電纜外徑。

  Note the outer diameter of the cable.

  (2)門型角鋼支架的安裝:梯型橋架沿墻垂直敷設(shè),可使用門型角鋼支架,支架的固定應(yīng)盡可能配合土建施工預(yù)埋。如圖3.1.5(2-1),也可在土建施工中預(yù)埋開角螺栓,用開角螺栓固定支架如圖3.1.5(2-1),也可以采用膨脹螺栓固定。

  (2) Installation of door type angle steel bracket: The ladder type bridge is vertically laid along the wall, and door type angle steel bracket can be used. The fixation of the bracket should be embedded as much as possible in conjunction with civil construction. As shown in Figure 3.1.5 (2-1), angle bolts can also be pre embedded in civil construction to fix the bracket as shown in Figure 3.1.5 (2-1), or expansion bolts can be used for fixation.

  (3)梯型角鋼支架的安裝:橋架沿墻、柱水平安裝時(shí),托壁需安裝在異型鋼立柱上,而立柱要安裝在梯型角鋼支架上,使柱和墻上的橋架固定支架(或托臂)在同一條直線上。制作見圖和表3.1.5(3)底架與門型架焊接時(shí),焊角高度5mm。

  (3) Installation of ladder type angle steel bracket: When the bridge is installed horizontally along the wall or column, the support wall needs to be installed on the special-shaped steel column, and the column needs to be installed on the ladder type angle steel bracket, so that the fixed bracket (or support arm) of the column and the bridge on the wall are in the same straight line. When welding the chassis and door frame as shown in Figure 3.1.5 (3), the welding angle height should be 5mm.

  (4)電纜橋架立柱側(cè)壁式安裝:立柱是直接支承托臂的部件,分工字鋼槽鋼、角鋼、異型鋼立柱;立柱可以在墻上、柱上安裝、也可懸吊在梁板上安裝。做法在混凝土可預(yù)埋鐵件;砌體可砌筑預(yù)制砌塊;也可以采用膨脹螺栓但必須在混凝土強(qiáng)度C20或磚強(qiáng)度在MU10以上的磚砌體上,作法可參照3.1.5(4a、b、c、d、e、f)。

  (4) Side wall installation of cable tray columns: The columns are components that directly support the support arms, and are divided into steel channel steel, angle steel, and special-shaped steel columns; Columns can be installed on walls, columns, or suspended from beams and slabs. The method involves embedding iron components in concrete; Prefabricated masonry blocks can be used for masonry construction; Expansion bolts can also be used, but they must be used on brick masonry with concrete strength C20 or brick strength above MU10. The method can refer to section 3.1.5 (4a, b, c, d, e, f).

  (5)電纜橋架應(yīng)敷設(shè)在易燃易爆氣體管和熱力管道的下方,當(dāng)設(shè)計(jì)無要求時(shí),與管道的小凈距,符合3.1.5(5)的規(guī)定。

  (5) Cable trays should be laid below flammable and explosive gas pipelines and thermal pipelines. When there are no design requirements, the minimum clear distance from the pipeline should comply with the provisions of 3.1.5 (5).

  6 托臂安裝:

  Installation of Arm 6:

  托臂是直接支承托盤、梯架單獨(dú)固定的剛性部件,托臂有螺栓固定可預(yù)埋螺栓,也可采用膨脹螺栓,也可卡接,如圖3.1.6(1)、(2)、(3)、(4)、(5)。

  The support arm is a rigid component that directly supports the tray and ladder frame and is fixed separately. The support arm can be fixed with bolts that can be embedded, expansion bolts, or clamped, as shown in Figure 3.1.6 (1), (2), (3), (4), and (5).

  3.2 橋架安裝

  3.2 Bridge installation

  1.直線段鋼制電纜橋架長(zhǎng)度超過30m,鋁合金或玻璃鋼制電纜橋架長(zhǎng)度超過15m應(yīng)設(shè)有伸縮節(jié),跨越伸縮縫處設(shè)置補(bǔ)償裝置,可用帶伸縮節(jié)的橋架。

  1. If the length of a straight steel cable tray exceeds 30m, or if the length of an aluminum alloy or fiberglass cable tray exceeds 15m, expansion joints should be installed. Compensation devices should be installed at the expansion joint crossing points, and cable trays with expansion joints can be used.

  2.橋架與支架間螺栓、橋架連接板螺栓緊固無遺漏,螺母位于橋架外側(cè),當(dāng)鋁合金橋架與鋼支架固定時(shí),有相互間絕緣防電化措施腐蝕措施,一般可墊石棉墊。

  2. The bolts between the bridge and the bracket, as well as the bolts of the bridge connecting plate, are tightened without omission, and the nuts are located on the outside of the bridge. When the aluminum alloy bridge and the steel bracket are fixed, there are mutual insulation and corrosion prevention measures, and asbestos pads can generally be used.

  3.敷設(shè)在豎井內(nèi)和穿越不同防火區(qū)的橋架,應(yīng)按設(shè)計(jì)要求位置,有防火隔離措施,電纜橋架在電氣豎井內(nèi)敷設(shè)可采用角鋼固定,見圖3.1.8。

  3. Cable trays laid in vertical shafts and crossing different fire zones should be located according to design requirements and have fire isolation measures. Cable trays laid in electrical vertical shafts can be fixed with angle steel, as shown in Figure 3.1.8.

  4.電纜橋架在穿過防火墻及防火樓板時(shí),應(yīng)采取防火隔離措施,防止火災(zāi)沿線路延燃;防火隔離墻、板,應(yīng)配合土建施工預(yù)留洞口,在洞口處預(yù)埋好護(hù)邊角鋼,施工時(shí)根據(jù)電纜敷設(shè)的層數(shù)和根數(shù)用L50×50×5角鋼作固定框,同時(shí)將固定柜焊在護(hù)邊角鋼上;也可以先作好框在土建施工中砌體或澆灌混凝土?xí)r安裝在墻、板中。

  4. When cable trays pass through firewalls and fire-resistant floor slabs, fire-resistant isolation measures should be taken to prevent fires from spreading along the line; Fire isolation walls and panels should be equipped with reserved openings for civil construction, and edge protection angle steel should be pre embedded at the openings. During construction, L50 × 50 × 5 angle steel should be used as a fixed frame according to the number of layers and cables laid, and the fixed cabinet should be welded to the edge protection angle steel; Alternatively, the frame can be installed in the wall or slab during masonry or concrete pouring in civil construction.

  3.3 橋架的接地,當(dāng)設(shè)計(jì)允許利用橋架系統(tǒng)構(gòu)成接地干線回路時(shí),應(yīng)符合下列要求:

  3.3 When the design allows the use of the bridge system to form a grounding main circuit, the grounding of the bridge should meet the following requirements:

  1. 金屬電纜橋架及其支架引入或引出的金屬電纜導(dǎo)管必須接地(PE)或接零(PEN)可靠,且必須符合下列規(guī)范:

  1. Metal cable trays and their brackets must have reliable grounding (PE) or neutral (PEN) for the metal cable conduits introduced or led out, and must comply with the following specifications:

  (1) 金屬電纜橋架及其支架全長(zhǎng),與接地(PE)或接零(PEN)干線相連接不小于2處,使整個(gè)橋架為一個(gè)電氣通路。

  (1) The entire length of the metal cable tray and its support shall be connected to the grounding (PE) or neutral (PEN) main line at no less than 2 points, making the entire tray an electrical pathway.

  (2) 非鍍鋅電纜橋架間連接的兩端跨接銅芯接地線,接地線小允許截面積不小于4mm2。

  (2) The two ends of the non galvanized cable tray are connected with copper core grounding wires, and the minimum allowable cross-sectional area of the grounding wire is not less than 4mm2.

  (3) 鍍鋅電纜橋架間連接板的兩端可不跨接接地線,但連接板兩端不少于2個(gè)有防松螺帽或防松墊圈的連接固定螺栓。

  (3) The two ends of the connecting plate between galvanized cable trays may not be connected to the grounding wire, but there shall be no less than 2 fixing bolts with anti loosening nuts or anti loosening washers at both ends of the connecting plate.

  2. 盤、梯架端部之間連接電阻不應(yīng)大于0.00033Ω并應(yīng)用等電位聯(lián)結(jié)測(cè)試儀(導(dǎo)通儀)或微Ω表測(cè)試,測(cè)試應(yīng)在連接點(diǎn)的兩側(cè)進(jìn)行,對(duì)整個(gè)橋架全長(zhǎng)的兩端連接電阻不應(yīng)大于0.5Ω或由設(shè)計(jì)決定,否則應(yīng)增加接地點(diǎn),以滿足要求。接地孔應(yīng)涂層,與涂層接觸的螺栓有一側(cè)的平墊應(yīng)使用帶爪的專用接地墊圈。

  2. The connection resistance between the ends of the tray and ladder should not exceed 0.00033 Ω and should be tested using an equipotential bonding tester (continuity meter) or a micro Ω meter. The test should be conducted on both sides of the connection point, and the connection resistance at both ends of the entire length of the bridge should not exceed 0.5 Ω or be determined by the design. Otherwise, a grounding point should be added to meet the requirements. The grounding hole should eliminate the coating, and the flat pad on one side of the bolt in contact with the coating should use a special grounding washer with claws.

  3. 伸縮縫或軟連接處需采用編織銅線連接。沿橋架全長(zhǎng)另敷設(shè)接地干線時(shí),每段(包括非直線段)托盤、梯架應(yīng)小有一點(diǎn)與接地干線可靠連接;在接地部位的連接處應(yīng)裝置彈簧墊圈,以免松動(dòng)。

  3. Expansion joints or soft connections should be connected using braided copper wires. When laying a grounding main line along the entire length of the bridge, each section (including non-linear sections) of the tray and ladder should be reliably connected to the grounding main line at a small point; A spring washer should be installed at the connection point of the grounding part to prevent loosening.

  電纜橋架作為布線工程的一個(gè)配套項(xiàng)目,目前尚無專門的規(guī)范指導(dǎo),個(gè)生產(chǎn)廠家的規(guī)格程式缺乏通用性,因此,設(shè)計(jì)選型過程應(yīng)根據(jù)弱電各個(gè)系統(tǒng)纜顯得類型、數(shù)量,合理選定適用的橋架。(1)確定方向: 根據(jù)建筑平面布置圖,結(jié)合空調(diào)管線和電氣管線等設(shè)置情況、方便維修,以及電纜路由的疏密來確定電纜橋架的路由。在室內(nèi),盡可能沿建筑物的墻、柱、梁及樓板架設(shè),如許利用綜合管廊架設(shè)時(shí),則應(yīng)在管道一側(cè)或上方平行架設(shè),并考慮引下線和分支線盡量避免交叉,如無其它管架借用,則需自設(shè)立(支)柱。

  As a supporting project of wiring engineering, there is currently no specialized specification guidance for cable trays, and the specifications and programs of individual manufacturers lack universality. Therefore, the design and selection process should be based on the type and quantity of cables in various weak current systems, and the appropriate cable tray should be selected reasonably. (1) Determine direction: Determine the optimal route for cable trays based on the building layout plan, combined with the installation of air conditioning and electrical pipelines, convenient maintenance, and the density of cable routing. Indoors, try to install along the walls, columns, beams, and floor slabs of the building as much as possible. When using a comprehensive pipe gallery for installation, parallel installation should be carried out on one side or above the pipeline, and consideration should be given to avoiding crossing of down conductors and branch lines as much as possible. If there are no other pipe racks to borrow, self installing (supporting) columns is required.

  (2)荷載計(jì)算:計(jì)算電纜橋架主干線縱斷面上單位長(zhǎng)度的電纜重量。

  (2) Load calculation: Calculate the weight of cables per unit length on the longitudinal section of the main cable tray.

  (3)確定橋架的寬度:根據(jù)布放電纜條數(shù)、電纜直徑及電纜的間距來確定電纜橋架的型號(hào)、規(guī)格, 托臂的長(zhǎng)度,支柱的長(zhǎng)度、間距,橋架的寬度和層數(shù)。

  (3) Determine the width of the cable tray: Determine the model and specifications of the cable tray, the length of the support arm, the length and spacing of the pillars, the width and number of layers of the cable tray based on the number of cables laid, the diameter of the cables, and the spacing between the cables.

  (4)確定安裝方式:根據(jù)場(chǎng)所的設(shè)置條件確定橋架的固定方式,選擇懸吊式、直立式、側(cè)壁式或是混合式,連接件和緊固件一般是配套供應(yīng)的,此外,根據(jù)橋架結(jié)構(gòu)選折相應(yīng)的蓋板。

  (4) Determine installation method: Determine the fixing method of the bridge according to the setting conditions of the site, choose suspended, upright, side wall or hybrid, and the connectors and fasteners are generally supplied together. In addition, select the corresponding cover plate according to the structure of the bridge.

  (5)繪出電纜橋架平、剖面圖,局部部位還應(yīng)繪出空間圖,開列材料表。

  (5) Draw a plan and section diagram of the cable tray, and also draw a spatial diagram of some parts, and list the material list.

  2、如與電力電纜橋架合用時(shí),應(yīng)將電力電纜和弱電電纜各直一側(cè),中間采用隔板分隔。

  2. When used in conjunction with power cable trays, the power cables and weak current cables should be placed on one side each, and separated by a partition in the middle.

  3、弱電電纜與其它低電壓電纜合用橋架時(shí),應(yīng)嚴(yán)格執(zhí)行選擇具有外屏蔽層的弱電系統(tǒng)的弱電電纜,避免相互間的干擾。

  3. When weak current cables are used in cable trays with other low voltage cables, it is necessary to strictly select weak current cables with external shielding layers to avoid interference between them.

  4、電纜橋架安裝要求

  4. Installation requirements for cable trays

  (1)槽式大跨距電纜橋架由室外進(jìn)入建筑物內(nèi)時(shí),橋架向外的坡度不得小于1/100。(2)電纜橋架與用電設(shè)備交越時(shí),其間的凈距不小于0.5m。

  (1) When the trough type large-span cable tray enters the building from the outside, the outward slope of the tray shall not be less than 1/100. (2) When the cable tray intersects with electrical equipment, the clear distance between them shall not be less than 0.5m.

  (3)兩組電纜橋架在同一高度平行敷設(shè)時(shí),其間凈距不小于0.6m。(4)在平行圖上繪出橋架的路由,要注明橋架起點(diǎn)、終點(diǎn)、拐彎點(diǎn)、分支點(diǎn)及升降點(diǎn)的坐標(biāo)或定位尺寸、標(biāo)高,如能繪制橋架敷設(shè)軸側(cè)圖,則對(duì)材料統(tǒng)計(jì)將更精確。

  (3) When two sets of cable trays are laid in parallel at the same height, the clear distance between them should not be less than 0.6m. (4) When drawing the routing of the tray on a parallel diagram, the coordinates or positioning dimensions and elevations of the starting point, ending point, turning point, branching point, and lifting point of the tray should be indicated. If a cable tray laying axis side diagram can be drawn, the material statistics will be more accurate.

  直線段:注明全長(zhǎng)、橋架層數(shù)、標(biāo)高、型號(hào)及規(guī)格。拐彎點(diǎn)和分支點(diǎn):注明所用轉(zhuǎn)彎接板的型號(hào)及規(guī)格。升降段:注明標(biāo)高變化,也可用局部大樣圖或剖面圖表示。

  Straight line segment: indicate the total length, number of bridge layers, elevation, model, and specifications. Turning and branching points: indicate the model and specifications of the turning joint used. Lifting section: indicate the elevation change, and it can also be represented by local detailed drawings or sectional drawings.

  (5)橋架支撐點(diǎn), 如立柱、托臂或非標(biāo)準(zhǔn)支、構(gòu)架的間距、安裝方式、型號(hào)規(guī)格、標(biāo)高,可同意在平面上列表說明,也可分段標(biāo)出用不同的剖面圖、單線圖或大樣圖表示。

  (5) The spacing, installation method, model specifications, and elevation of bridge support points, such as columns, brackets, or non-standard supports and structures, can be listed and explained on the plane, or segmented and marked with different sectional drawings, single line drawings, or detailed drawings.

  (6)電纜引下點(diǎn)位置及引下方式,一般而言,大批電纜引下可用垂直彎接板和垂直引上架,少量電纜引下可用導(dǎo)板或引管,注明引下方式即可。

  (6) Generally speaking, for a large number of cable leads, vertical bending plates and vertical lead frames can be used, while for a small number of cable leads, guide plates or guide pipes can be used, indicating the lead method.

  (7)電纜橋架宜高出地面2.2米以上,橋架頂部距頂棚或其它障礙物不應(yīng)小于0.3米,橋架寬度不宜小于0.1米,橋架內(nèi)橫斷面的填充率不應(yīng)超過50%。

  (7) The cable tray should be at least 2.2 meters above the ground, and the distance between the top of the tray and the ceiling or other obstacles should not be less than 0.3 meters. The width of the tray should not be less than 0.1 meters, and the filling rate of the cross-section inside the tray should not exceed 50%.

  (8)電纜橋架內(nèi)纜線垂直敷設(shè)時(shí),在纜線的上端和每間隔1.5米處應(yīng)固定在橋架的支架上,水平敷設(shè)時(shí), 在纜線的首、尾、轉(zhuǎn)彎及每間隔3~5米處進(jìn)行固定。

  (8) When the cables are vertically laid in the cable tray, they should be fixed on the brackets of the tray at the upper end and every 1.5 meters. When laid horizontally, they should be fixed at the beginning, end, turn, and every 3-5 meters.

  (9)在吊頂內(nèi)設(shè)置時(shí),槽蓋開啟面應(yīng)保持80毫米的垂直凈空,線槽截面利用率不應(yīng)超過50%。

  (9) When installed in the ceiling, the opening surface of the trough cover should maintain a vertical clearance of 80 millimeters, and the utilization rate of the trough section should not exceed 50%.

  (10)布放在線槽的纜線可以不綁扎,槽內(nèi)纜線應(yīng)順直,槽內(nèi)纜線應(yīng)順直,盡量不交叉,纜線不應(yīng)溢出線槽,在纜線進(jìn)出線槽部位, 轉(zhuǎn)彎處應(yīng)綁扎固定。垂直線槽布放纜線應(yīng)每間隔1.5米固定在纜線支架上。

  (10) The cables laid in the cable trough can be left unbound. The cables inside the trough should be straight and straight, avoiding crossing as much as possible. The cables should not overflow from the trough. They should be tied and fixed at the entrance and exit of the trough, as well as at turns. The cables laid in the vertical cable tray should be fixed on the cable support every 1.5 meters.

  (11)在水平、垂直橋架和垂直線槽中敷設(shè)線時(shí),應(yīng)對(duì)纜線進(jìn)行綁扎。4對(duì)線電纜以24根為束,25對(duì)或以上主干線電纜、光纜及其它信號(hào)電纜應(yīng)根據(jù)纜線的類型、纜徑、纜線芯數(shù)分束綁扎。綁扎間距不宜大于1.5米,扣間距應(yīng)均勻,松緊適度。

  (11) When laying wires in horizontal and vertical cable trays and vertical trunking, the cables should be tied. 4-pair cables should be bundled with 24 cables, and 25 or more pairs of backbone cables, optical cables, and other signal cables should be bundled and tied according to the type, diameter, and number of cable cores. The binding spacing should not exceed 1.5 meters, the buckle spacing should be uniform, and the tightness should be moderate.

  (12)橋架水平敷設(shè)時(shí),支撐間距一般為1.5-3m,垂直敷設(shè)時(shí)固定在建筑物構(gòu)體上的間距宜小于2m。

  (12) When laying the bridge horizontally, the support spacing is generally 1.5-3m, and when laying vertically, the spacing fixed on the building structure should be less than 2m.

  電纜橋架型式及品種的選擇及鋪設(shè)規(guī)范

  Selection and laying specifications for cable tray types and varieties

  一、電纜橋架型式及品種的選擇

  1、 Selection of cable tray types and varieties

  1、需屏蔽電氣干擾的電纜網(wǎng)路或有防護(hù)外部(如:有腐蝕液休,易燃粉塵等環(huán)境)影響的要求時(shí),應(yīng)選用(FB)類槽式復(fù)合型防腐屏蔽電纜橋架(帶蓋)

  1. When it is required to shield cable networks from electrical interference or to protect against external influences (such as corrosive liquids, flammable dust, etc.), (FB) type slot type composite anti-corrosion shielding cable trays (with covers) should be selected

  2、強(qiáng)腐蝕性環(huán)境應(yīng)采用(F)類復(fù)合環(huán)氧樹脂防腐阻燃型電纜橋架。托臂、支架也要選用同樣材料,提高橋架及附件的使用壽命,電纜橋架。在容易積灰和其它需遮蓋的環(huán)境或戶外場(chǎng)所宜加蓋板。

  2. For highly corrosive environments, (F) type composite epoxy resin anti-corrosion and flame-retardant cable trays should be used. The same materials should be used for the support arm and bracket to improve the service life of the cable tray and accessories. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover.

  3、除上述情況外,可根據(jù)現(xiàn)場(chǎng)還環(huán)境及技術(shù)要求選用托盤式、槽式、梯級(jí)式、玻璃防腐阻燃電纜橋架或鋼質(zhì)普通型橋架。在容易積灰和其它需遮蓋的環(huán)境或戶外場(chǎng)所宜加蓋板。

  3. In addition to the above situations, tray type, trough type, step type, glass anti-corrosion and flame-retardant cable trays or steel ordinary cable trays can be selected according to the on-site environment and technical requirements. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover.

  4、在公共通道或戶外跨越道路段,底層梯級(jí)的底部宜加墊板或在該段使用托盤 。大跨距跨越公共通道時(shí),可根據(jù)用戶要求提高橋架的載荷能力或選用行架。

  4. When crossing public passages or outdoor road sections, it is advisable to add padding or use pallets at the bottom of the lower steps. When crossing public passages with large spans, the load capacity of the bridge frame can be increased or a scaffolding can be selected according to user requirements.

  5、大跨距(>3m)要選用復(fù)合型橋架(FB)。

  5. Composite cable trays (FB) should be selected for large spans (>3m).

  6、戶外要選用復(fù)合環(huán)氧樹指橋架(F)。

  6. Choose composite epoxy tree finger bridge (F) for outdoor use.

  二、電纜橋架規(guī)格選擇

  2、 Selection of cable tray specifications

  1、復(fù)合環(huán)氧樹脂電纜橋架的寬度和高度就按下表選擇,并應(yīng)符合電纜真充率不超過有關(guān)標(biāo)準(zhǔn)規(guī)范的規(guī)定值,動(dòng)力電纜可取40-50%,控制電纜可取50-70%,另外需予留10-25%的式程發(fā)展余量。

  1. The width and height of the composite epoxy resin cable tray should be selected according to the table below, and should comply with the specified values of the cable true filling rate not exceeding the relevant standard specifications. The power cable can be taken as 40-50%, the control cable can be taken as 50-70%, and an additional 10-25% formula development margin should be reserved.

  2、各種彎通及附件規(guī)格應(yīng)符合工程布置條件并與橋架相配套。

  2. The specifications of various bends and accessories should comply with the engineering layout conditions and be compatible with the bridge frame.

  3、支、吊架規(guī)格的選擇,應(yīng)按橋架規(guī)格、層數(shù)、跨距等條件配置。并應(yīng)滿足荷載的要求。

  3. The selection of support and hanger specifications should be configured according to the specifications, number of layers, span, and other conditions of the bridge frame. And it should meet the requirements of the load.

  4、橋架橫截面積的選擇見表橋架上電纜網(wǎng)絡(luò)中任一線路的自動(dòng)過電流保護(hù)的額定電流值或整定值(A) 橋架橫截面充許小值(mm2)0-60 12961-100 258101-200 452201-400 645401-600 968

  4. The selection of the cross-sectional area of the cable tray is shown in the table. The rated current value or setting value of the maximum automatic overcurrent protection for any line in the cable network on the cable tray (A). The minimum allowable cross-sectional area of the cable tray (mm2) is 0-60 12961-100 258101-200 452201-400 645401-600 968

  三、對(duì)于電纜橋架的支、吊架的配置

  3、 Configuration of supports and hangers for cable trays

  1、戶內(nèi)支、吊短跨距一般采取1.5-3m。戶外立柱中跨距一般采取6m。

  1. The short span of indoor supports and hangers is generally 1.5-3m. The mid span of outdoor columns is generally 6m.

  2、非直線段的支、吊架配置就遵循以下原則。當(dāng)橋架寬度<300mm時(shí),應(yīng)在距非直線段與直線結(jié)合處300-600m的直線段側(cè)設(shè)置一個(gè)支、吊架。當(dāng)橋架寬度>300mm時(shí),除符合下述條件外,在非直線段中部還應(yīng)增設(shè)一個(gè)支、吊架。

  2. The configuration of supports and hangers for non-linear sections follows the following principles. When the width of the bridge is less than 300mm, a support and hanger should be installed on the side of the straight section 300-600m away from the junction of the non-linear section and the straight section. When the width of the bridge is greater than 300mm, in addition to meeting the following conditions, a support or hanger should be added in the middle of the non-linear section.

  3、拉擠玻璃鋼電纜橋架多層設(shè)置時(shí)層間中心距為200,250,300,350mm。

  3. When setting up multiple layers of extruded fiberglass cable trays, the center distance between layers is 200250300350mm.

  4、橋架直線段每隔50m應(yīng)予留伸縮縫20-30mm(金屬橋架)。

  4. Expansion joints of 20-30mm (metal bridge) should be left every 50m in the straight section of the bridge.

  四、防火:要求橋架防火的區(qū)段,必須采用鋼制或不燃、阻燃材料。

  4、 Fire prevention: Steel or non combustible and flame-retardant materials must be used in the sections where bridge frames are required to be fire-resistant.

  五、拉擠玻璃鋼電纜橋架的接地

  5、 Grounding of extruded fiberglass cable tray

  1、橋架系統(tǒng)應(yīng)具有可靠的電氣連接并接地(只對(duì)金屬橋架)。

  1. The cable tray system should have reliable electrical connections and grounding (only for metal cable trays).

  2、當(dāng)允許利用橋架系統(tǒng)構(gòu)成接地干線回路時(shí)應(yīng)符合下列要求。橋架端部之間連接電阻應(yīng)不大于0.00033歐姆,接地孔應(yīng)絕緣涂層。在1KV及以下中性點(diǎn)直接接地系統(tǒng)中,受電設(shè)備的接地與系統(tǒng)中性線接地相連。裝有處動(dòng)切斷供電裝軒時(shí),橋架的級(jí)長(zhǎng)方向金屬橫截面積應(yīng)不小于規(guī)定值。

  2. When it is allowed to use a bridge system to form a grounding main circuit, the following requirements should be met. The connection resistance between the ends of the bridge should not exceed 0.00033 ohms, and the insulation coating should be removed from the grounding hole. In a neutral point direct grounding system of 1KV and below, the grounding of the receiving equipment is connected to the neutral line grounding of the system. When installing a power cut-off device, the cross-sectional area of the metal in the longitudinal direction of the bridge should not be less than the specified value.

  3、沿橋架全長(zhǎng)另敷設(shè)接地干線時(shí),每段(包括非直線段)橋架應(yīng)少有一點(diǎn)與接地干線可靠連接。

  3. When laying a grounding main line along the entire length of the bridge, each section (including non-linear sections) of the bridge should have at least one point reliably connected to the grounding main line.

  4、對(duì)于振動(dòng)場(chǎng)所,在接地部位的連接處應(yīng)裝置彈簧圈。

  4. For vibration sites, spring coils should be installed at the connection of the grounding point.

  六、橋架系統(tǒng)設(shè)計(jì)內(nèi)容:橋架系統(tǒng)工程設(shè)計(jì)應(yīng)與土建、工藝以及有關(guān)密切相配合以確定布置,其設(shè)計(jì)內(nèi)容可含有:

  6、 Bridge system design content: The bridge system engineering design should be closely coordinated with civil engineering, technology, and related disciplines to determine the optimal layout. Its design content may include:

  1、橋架系統(tǒng)的有關(guān)剖面圖。2、橋架系統(tǒng)的平面布置圖。3、橋架系統(tǒng)所需直線段、彎通、支、吊架規(guī)格和數(shù)量的明細(xì)表以及必要的說明。4、有特殊要求的非標(biāo)件技術(shù)說明或示意圖。

  1. Relevant sectional drawings of the bridge system. 2. Layout plan of the bridge system. 3. A detailed list of specifications and quantities of straight sections, bends, supports, and hangers required for the bridge system, along with necessary explanations. 4. Technical specifications or diagrams for non-standard parts with special requirements.

  七、安裝:電纜橋架的安半夜請(qǐng)參照建筑標(biāo)準(zhǔn)設(shè)計(jì)研究院所發(fā)行的JSJT-121全國(guó)通用建筑標(biāo)準(zhǔn)設(shè)計(jì)-電氣裝置標(biāo)準(zhǔn)圖集《電纜橋架安裝》。

  7、 Installation: For the installation of cable trays, please refer to the JSJT-121 National General Building Standard Design Electrical Equipment Standard Atlas "Cable Tray Installation" issued by the China Building Standards Design and Research Institute.

  八、設(shè)計(jì)要求

  8、 Design requirements

  1、橋架系統(tǒng)的路徑平面布置圖;

  1. Layout plan of the cable tray system path;

  2、橋架系統(tǒng)的有關(guān)斷面圖。

  2. The relevant cross-sectional diagram of the bridge system.

  3、橋架系統(tǒng)所用防腐材質(zhì)及所需直通、彎通、支(吊)架等的規(guī)格和數(shù)量明細(xì)表以及必要的說明,連接板及螺絲、防護(hù)帽按以上要求由生產(chǎn)廠家配齊。4、有特殊要求的非標(biāo)準(zhǔn)技術(shù)說明或示圖。

  3. The anti-corrosion materials used in the bridge system, as well as the specifications and quantities of the required straight through, bent through, support (suspension) frames, and necessary explanations, shall be detailed. The connecting plates, screws, and protective caps shall be provided by the manufacturer in accordance with the above requirements. 4. Non standard technical specifications or diagrams with special requirements.

  一、電纜橋架型式及品種的選擇

  1、 Selection of cable tray types and varieties

  1、需屏蔽電氣干擾的電纜網(wǎng)路或有防護(hù)外部(如:有腐蝕液休,易燃粉塵等環(huán)境)影響的要求時(shí),應(yīng)選用(FB)類槽式復(fù)合型防腐屏蔽電纜橋架(帶蓋)   2、強(qiáng)腐蝕性環(huán)境應(yīng)采用(F)類復(fù)合環(huán)氧樹脂防腐阻燃型電纜橋架。托臂、支架也要選用同樣材料,提高橋架及附件的使用壽命,電纜橋架。在容易積灰和其它需遮蓋的環(huán)境或戶外場(chǎng)所宜加蓋板。  3、除上述情況外,可根據(jù)現(xiàn)場(chǎng)還環(huán)境及技術(shù)要求選用托盤式、槽式、梯級(jí)式、玻璃防腐阻燃電纜橋架或鋼質(zhì)普通型橋架。在容易積灰和其它需遮蓋的環(huán)境或戶外場(chǎng)所宜加蓋板。  4、在公共通道或戶外跨越道路段,底層梯級(jí)的底部宜加墊板或在該段使用托盤 。大跨距跨越公共通道時(shí),可根據(jù)用戶要求提高橋架的載荷能力或選用行架?! ?、大跨距(>3m)要選用復(fù)合型橋架(FB)。

  1. When it is required to shield cable networks from electrical interference or to protect against external influences (such as corrosive liquids, flammable dust, etc.), (FB) type slot type composite anti-corrosion shielding cable trays (with covers) should be selected. 2. For highly corrosive environments, (F) type composite epoxy resin anti-corrosion and flame-retardant cable trays should be used. The same materials should be used for the support arm and bracket to improve the service life of the cable tray and accessories. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover. 3. In addition to the above situations, tray type, trough type, step type, glass anti-corrosion and flame-retardant cable trays or steel ordinary cable trays can be selected according to the on-site environment and technical requirements. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover. 4. When crossing public passages or outdoor road sections, it is advisable to add padding or use pallets at the bottom of the lower steps. When crossing public passages with large spans, the load capacity of the bridge frame can be increased or a scaffolding can be selected according to user requirements. 5. Composite cable trays (FB) should be selected for large spans (>3m).

  6、戶外要選用復(fù)合環(huán)氧樹指橋架(F)。

  6. Choose composite epoxy tree finger bridge (F) for outdoor use.

  二、規(guī)格選擇

  2、 Specification selection

  1、橋架的寬度和高度就按下表選擇,并應(yīng)符合電纜真充率不超過有關(guān)標(biāo)準(zhǔn)規(guī)范的規(guī)定值,動(dòng)力電纜可取40-50%,控制電纜可取50-70%,另外需予留10-25%的式程發(fā)展余量?! ?、各種彎通及附件規(guī)格應(yīng)符合工程布置條件并與橋架相配套?! ?、支、吊架規(guī)格的選擇,應(yīng)按橋架規(guī)格、層數(shù)、跨距等條件配置。并應(yīng)滿足荷載的要求?! ?、橋架橫截面積的選擇見表   橋架上電纜網(wǎng)絡(luò)中任一線路的自動(dòng)過電流保護(hù)的額定電流值或整定值(A) 橋架橫截面充許小值(mm2)   0-60 129   61-100 258   101-200 452   201-400 645   401-600 968

  1. The width and height of the cable tray should be selected according to the table below, and should comply with the specified values of the cable true filling rate not exceeding the relevant standard specifications. The power cable can be taken as 40-50%, the control cable can be taken as 50-70%, and an additional 10-25% of the formula development margin should be reserved. 2. The specifications of various bends and accessories should comply with the engineering layout conditions and be compatible with the bridge frame. 3. The selection of support and hanger specifications should be configured according to the specifications, number of layers, span, and other conditions of the bridge frame. And it should meet the requirements of the load. 4. The selection of the cross-sectional area of the cable tray is shown in the table. The rated current value or setting value of the maximum automatic overcurrent protection for any line in the cable network on the tray (A). The minimum allowable cross-sectional area of the tray (mm2) is 0-60 129 61-100 258 101-200 452 201-400 645 401-600 968

  三、支、吊架的配置

  3、 Configuration of supports and hangers

  1、戶內(nèi)支、吊短跨距一般采取1.5-3m。戶外立柱中跨距一般采取6m。

  1. The short span of indoor supports and hangers is generally 1.5-3m. The mid span of outdoor columns is generally 6m.

  2、非直線段的支、吊架配置就遵循以下原則。當(dāng)橋架寬度<300mm時(shí),應(yīng)在距非直線段與直線結(jié)合處300-600m的直線段側(cè)設(shè)置一個(gè)支、吊架。當(dāng)橋架寬度>300mm時(shí),除符合下述條件外,在非直線段中部還應(yīng)增設(shè)一個(gè)支、吊架。

  2. The configuration of supports and hangers for non-linear sections follows the following principles. When the width of the bridge is less than 300mm, a support and hanger should be installed on the side of the straight section 300-600m away from the junction of the non-linear section and the straight section. When the width of the bridge is greater than 300mm, in addition to meeting the following conditions, a support or hanger should be added in the middle of the non-linear section.

  3、橋架多層設(shè)置時(shí)層間中心距為200,250,300,350mm。

  3. When setting up multiple layers of cable trays, the center distance between layers is 200250300350mm.

  4、橋架直線段每隔50m應(yīng)予留伸縮縫20-30mm(金屬橋架)。

  4. Expansion joints of 20-30mm (metal bridge) should be left every 50m in the straight section of the bridge.

  四、防火

  4、 Fire prevention

  要求橋架防火的區(qū)段,必須采用鋼制或不燃、阻燃材料。我公司生產(chǎn)的BJⅢ系列電纜橋架均為防火橋架。

  The section requiring bridge fire prevention must be made of steel or non combustible and flame-retardant materials. The BJ III series cable trays produced by our company are all fire-resistant trays.

  五、接地

  5、 Grounding

  1、橋架系統(tǒng)應(yīng)具有可靠的電氣連接并接地(只對(duì)金屬橋架)。

  1. The cable tray system should have reliable electrical connections and grounding (only for metal cable trays).

  2、當(dāng)允許利用橋架系統(tǒng)構(gòu)成接地干線回路時(shí)應(yīng)符合下列要求。橋架端部之間連接電阻應(yīng)不大于0.00033歐姆,接地孔應(yīng)絕緣涂層。在1KV及以下中性點(diǎn)直接接地系統(tǒng)中,受電設(shè)備的接地與系統(tǒng)中性線接地相連。裝有處動(dòng)切斷供電裝軒時(shí),橋架的級(jí)長(zhǎng)方向金屬橫截面積應(yīng)不小于規(guī)定值。

  2. When it is allowed to use a bridge system to form a grounding main circuit, the following requirements should be met. The connection resistance between the ends of the bridge should not exceed 0.00033 ohms, and the insulation coating should be removed from the grounding hole. In a neutral point direct grounding system of 1KV and below, the grounding of the receiving equipment is connected to the neutral line grounding of the system. When installing a power cut-off device, the cross-sectional area of the metal in the longitudinal direction of the bridge should not be less than the specified value.

  3、沿橋架全長(zhǎng)另敷設(shè)接地干線時(shí),每段(包括非直線段)橋架應(yīng)少有一點(diǎn)與接地干線可靠連接。

  3. When laying a grounding main line along the entire length of the bridge, each section (including non-linear sections) of the bridge should have at least one point reliably connected to the grounding main line.

  4、對(duì)于振動(dòng)場(chǎng)所,在接地部位的連接處應(yīng)裝置彈簧圈。

  4. For vibration sites, spring coils should be installed at the connection of the grounding point.

  六、橋架系統(tǒng)設(shè)計(jì)內(nèi)容

  6、 Design content of bridge system

  橋架系統(tǒng)工程設(shè)計(jì)應(yīng)與土建、工藝以及有關(guān)密切相配合以確定布置,其設(shè)計(jì)內(nèi)容可含有:

  The design of bridge system engineering should be closely coordinated with civil engineering, technology, and relevant disciplines to determine the optimal layout, and its design content may include:

  1、橋架系統(tǒng)的有關(guān)剖面圖。

  1. Relevant sectional drawings of the bridge system.

  2、橋架系統(tǒng)的平面布置圖。

  2. Layout plan of the bridge system.

  3、橋架系統(tǒng)所需直線段、彎通、支、吊架規(guī)格和數(shù)量的明細(xì)表以及必要的說明。

  3. A detailed list of specifications and quantities of straight sections, bends, supports, and hangers required for the bridge system, along with necessary explanations.

  4、有特殊要求的非標(biāo)件技術(shù)說明或示意圖。

  4. Technical specifications or diagrams for non-standard parts with special requirements.

  七、安裝

  7、 Installation

  電纜橋架的安半夜請(qǐng)參照建筑標(biāo)準(zhǔn)設(shè)計(jì)研究院所發(fā)行的JSJT-121全國(guó)通用建筑標(biāo)準(zhǔn)設(shè)計(jì)-電氣裝置標(biāo)準(zhǔn)圖集《電纜橋架安裝》04D701-3。

  For the installation of cable trays, please refer to the JSJT-121 National General Building Standard Design Electrical Equipment Standard Atlas "Cable Tray Installation" 04D701-3 issued by the China Building Standards Design and Research Institute.

  八、設(shè)計(jì)要求

  8、 Design requirements

  1、橋架系統(tǒng)的路徑平面布置圖;

  1. Layout plan of the cable tray system path;

  2、橋架系統(tǒng)的有關(guān)斷面圖。

  2. The relevant cross-sectional diagram of the bridge system.

  3、橋架系統(tǒng)所用防腐材質(zhì)及所需直通、彎通、支(吊)架等的規(guī)格和數(shù)量明細(xì)表以及必要的說明,連接板及螺絲、防護(hù)帽按以上要求由生產(chǎn)廠家配齊。

  3. The anti-corrosion materials used in the bridge system, as well as the specifications and quantities of the required straight through, bent through, support (suspension) frames, and necessary explanations, shall be detailed. The connecting plates, screws, and protective caps shall be provided by the manufacturer in accordance with the above requirements.

  4、有特殊要求的非標(biāo)準(zhǔn)技術(shù)說明或示圖。

  4. Non standard technical specifications or diagrams with special requirements.

  本文由  濟(jì)南電纜橋架  友情奉獻(xiàn).更多有關(guān)的知識(shí)請(qǐng)點(diǎn)擊  http://www.chenchen1688.com/  真誠的態(tài)度.為您提供為的服務(wù).更多有關(guān)的知識(shí)我們將會(huì)陸續(xù)向大家奉獻(xiàn).敬請(qǐng)期待.

  This article is a friendly contribution from Jinan Cable Bridge For more related knowledge, please click http://www.chenchen1688.com/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.

 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
四房播播开心五月| 国产免费99| 久久精品一区二区三区免费| 欧洲洲一区二区精华液| 亚洲首页| 色欲影视天天综合网| 国产亚洲无| 国产成人艳妇aa视频在线| 超碰av在线| 暖暖视频在线观看高清播放| 日本乱码中文在线观看| 亚洲AV综合色区国产精品天天| av大片免费| 日韩a区| 国产精品亚洲五月天丁香| 色欲久久精品AV无码| 最近中文字幕MV2018免费看 | 悠悠影院| 最新色站| 五月丁香伊人| 麻豆视传媒短视频在线观| 极品美鲍一线天| 日韩av无码一区| 人妻无码精品久久人妻成人| 天美传媒麻豆MDXXXX| 日韩综合色| 久久亚洲综合| 国精品午夜福利视频不卡麻豆 | 欧美三日本三级少妇三级99| 国产亚洲无码精品| 2019久久视频国产| 欧美日韩中文国产一区发布| 成人精品毛片| 精品无码av无码免费专区| 西西4444www无码国模吧| 69国产精品久久久久久人妻| 亚洲激情内射| 日韩av色色| 黄色小说在线看| 亚洲成人有码原创区| 国产97在线观看| 欧美一区二区三区视频在线观看| 日韩电影在线免费观看| 亚洲网站一区| 日韩在线观看视频网站| 欧美干B骚荡货| 精品不卡高清视频在线观看| 国产免费又黄又爽又色| 亚洲色道| 小说区激情另类春色| 激情综合丁香婷婷色五月| 亚洲无码网| 无码av在线网站| 亚洲欧美人妻| 999久久久成人A片精品免费看| 黄片免费播放站| 精品欧美一区二区三区久久久兽交| 黄色成人在线| 四房播播qvod| 大屌AV| 亚洲视频一二三| 国产激情综合五月久久| 最近中文字幕MV2018免费看 | 欧产伦精一区二区三区免费| 国产肏逼视频| 欧美激情亚洲| 午夜黄色在线观看| 中文字幕乱偷无码| 国产伦精品一区二区三区免.费| 五月天丁香久久| 久久久久999| 啪啪啪网站国产| 国产美女一区| 开心五月色婷婷综合开心网| 午夜精品一区二区三区在线| 无码在线一区二区三区| 青春禁区直播在线观看高清免费| 午夜影晥| XXX免费视频| 亚洲精品白浆| 麻豆影视文化传媒app官网进入| 成人午夜视频一区二区国语| 中文字幕无码午夜场| 免费午夜av| 波多野结衣大战黑人| 精品自拍视频| 日日日插插插| 婷婷五月激情视频| 最近2018年中文字幕免费下载| WWW亚洲精品久久久无码| 熟女专场88av| 色一情一伦一子一伦一区| 97在线视频免费人妻| 91精品国产综合久久久不打电影| 精品人妻一区二区三区换脸明星| 大地资源影视中文官网入口| 亚洲欧美在线精品| 天堂欧美| 向日葵视频无限看片破解| 熟女av影院| 亚洲第一二三四区| 欧美性生交XXXXX无码影院| 少妇无内裤下蹲露大唇视频 | 色偷偷噜噜噜亚洲男人| 毛成片1卡2卡3卡4卡| 高潮91PORN成人| 特级西西西4444大胆无码| 成年人深夜福利| 日韩AV久久| 蜜臀AV一区二区| 国产一区二区三区四区| 欧洲AV一区二区| 青草国产超碰人人添人人碱| 国产精人妻无码8090| 揄拍成人国产精品视频| 婷婷久久无码欧美人妻| Julia一区二区| 婷婷综合另类小说色区| yy6080理论女2018| 亚洲午夜av一二三区熟女| 国产免费一区二区在线A片| 99爱精品视频| 亚洲Av无码乱码在线观看| 亚洲精品国偷拍自产在线麻豆| 日本黄色播放| 久热中文字幕| 麻豆国产成人AV在线| 岳妇伦丰满日本在线播放| 最近的中文字幕2019国语| 欧美内射在线观看| 2019香蕉视频在线观看| 无码人妻精品一区二区三千菊电影| 亚洲天堂2020| 最好看的中文字幕国语2019| 国产精品美| 999久久久成人A片精品免费看 | 国产精品久久久久久久久久酒店| 欧美日韩不卡合集视频| 国产伦精品一区三区精东| 无码精品一区二区三区99不| 开心五月丁香花综合网| 亚洲乱色熟女一区二区三区| 久久草免费线看线看2| 午夜理伦网站| 亚洲 校园 欧美 国产 另类| 亚洲国产成人综合| 麻豆传煤网站入口直接进| 99久久99九九99九九九| 无码生活片| 不卡的动漫| 亚洲字幕成人中文在线观看| 91久久久久久| 九九久久综合| 国产精品一区二区黑人巨大 | 99青青青精品视频在线| 少妇性受XXXX黑人XYX性爽| 精品人妻一区二区三区换脸明星| 日本免费高清一区| 国产精品久久久久久久久免费| 免费AV黄片| 日本久久网| 麻豆视频在线观看免费网站| 国产v亚洲v天堂无码久久久91| 日韩欧美色色| 日韩精品电影| 一二三四社区在线中文视频| 久久久久久免费毛片| 精品成人网站| 天天日av| 日韩AV久久| 麻豆传煤APP网页入口大全下载 | 成人国产一区二区在线| 欧洲lv尺码大精品久久久| 激情精品| 国产第1页| 99在线视频播放| 国产精品一区二区黑人巨大| 国产人妻av| 青青草婷婷| 亚洲蜜桃av| 午夜视频久久| 国产亚洲精品久久久久久豆腐| 亚洲午夜电影| 国产福利久久久| 亚洲Av无码乱码在线观看| 97碰在线看片免费视频| 国产成人影片在线观看| 久久亚洲电影| 亚洲精品久久久久久一区二区| 男艹女网站| 午夜精品在线| 起碰视频| 日韩亚洲欧美一区二区| 小说区都市校园激情另类| 午夜伦理 第1页| 国产成人色| 狠狠精品干练久久久无码中文字幕| 99色国产| 最近中文字幕完整版2018免费| 狠狠久久亚洲欧美专区| 久久久精品久久久久久久久久久| av动态图| 最近中文字幕视频在线MV| 欧美国产一区二区三区激情无套 | 久久免费国产精品| 国产精品露脸视频| 久久人妻精品| 天堂av中文在线| 欧美日韩在线看| 国产精品久久久久久久久| 浪潮AV在线观看高清| 伊人久久综合视频| 99久久人妻精品无码二区| 日韩av免费| 酒色婷婷| 日韩精品三区| 亚洲综合憿情五月色丁香色婷婷| 香蕉网在线| 四虎免费在线| 中文字幕人妻偷人伦在线视频| 亚洲欧美激情精品一区二区| 中文字幕 自拍偷拍| 久久国语精品| 亚洲婷婷丁香五月| 亚洲天堂国产AV| 麻豆视传媒APP官方网站入口| 国产精品第| 欧美伊人网| 人人妻人人要| 黑人一区二区三区四区五区| 亚洲色tu| 国产AV人人夜夜澡人人爽麻豆| 尤物精品| 九九大香蕉视频| 香蕉久久国产AV一区二区| 亚洲一区二区三区加勒比| 大地资源网在线观看入口 | 熟女一区| 午夜资源站| av中文在线| 99美女高潮喷水白浆| 欧美日本中文字幕| 国产男女猛烈视频在线观看| 伊人成人在线| 色开心| 久久久久久无码精品人妻一区二区| 亚洲无吗精品AV九九久久| 飘花影院午夜片理论片| 久久99精品久久久久| 国产精品自在自线视频| 日韩一区二区免费电影| 色峰视频| 欧美成性| 凹凸视频在线| 亚洲字幕成人中文在线观看| 久久人妻精品国产一区二区| 国产婷婷成人久久av免费高清| 天堂草原电视剧图片在线观看| 日韩无码专区| 99精品视频一区二区三区| 五月婷婷在线视频| 又大又粗又黄| 麻豆蜜传媒| 欧美精品亚洲精品| 国产精品一区二区三区久久| 国产人妻一区二区免费AV| 日韩在线| 欧美专区一区| 中国美女AV| 国产麻豆福利AV在线观看| 色综合国产| 在线观看麻豆av| 大地资源二中文免费第二页| 天天色图| 欧美 日韩 国产 精品| 久久精品99国产精| 亚洲狠狠| 欧洲精品码一区二区三区| 99国产精品一区二区毛卡片色戒| 麻豆啊传媒app官网下载免费| 伊人宗合网| 91AV亚洲| 久草在视频免费福利| 欧美黄色一级| 日韩精品一区二区三区在线播放| 中文字幕永久| 亚洲精品偷拍影视在线观看| 麻豆精品传媒2021网站下载| 欧美啪啪一区| 精品人妻互换一区二区三区| 成年福利片在线观看| 欧美日韩国产一区二区三区 | 天堂视频免费在线观看| 大地资源二中文在线播放| 久久亚洲综合| 亚洲第一色站| 欧美老熟妇又粗又大| 国产乱码精品一区二区三区五月婷| 激情一区二区三区| 超碰中文字幕| 色一情一区二区| 99视频这里只有精品20| 国产日产欧产美韩系列影片| 免费人成在线观看| 欧美日韩三级视频| 亚洲中文欧美| 中文字幕成人av| 亚洲 欧美 国产 另类卡通| www.久久综合| 亚洲精品一区二区三区中文字幕| 老鸭窝久久| 国产卡一卡二卡3卡四卡精品| 午夜DV内射一区二区| 最新无码视频| 人妻久久久久| 天天操天天日天天干天天干天天干| 最近中文字幕在线MV10| 乱色精品无码一区二区国产盗| 一边摸一边做爽的视频17国产| 白丝喷白浆一区二区在线观看| 久热这里在线精品| 在线亚洲av| 久久国产麻豆| 国产不卡一二三| 97人妻成人免费视频| 欧美1区2区3区4区| 久久久人精午夜精国| 国产精品人妻无码| 无码一区二区电影| 男女无遮挡激情视频| 五月激情综合| 国产精品一区二区三区免费| 国产精品天天av精麻传媒 | 精品四虎国产在免费观看| 国产超碰AV人人做人人爽| 婷婷丁香五月亚洲| 日本色色图| 97在线资源| 99久久无码一区人妻A片麻豆| 日韩一区二区三区四区五区| 操逼射精视频| 日本熟女性视频| 妇女性内射冈站HDWWW000| 国产免费看JIZZ视频| 狠狠操一区二区| 国产一级精品无套老师| 欧美成人电影一区| 久久y| 大地资源高清在线观看| 国产伦精品一区二区三区免费下载| 亚洲抛九九九一三一二区| 亚洲午夜电影网| 欧洲AV片| 大香蕉com| 国产日产人妻精品精品| A天堂最新版在线中文| 国产AV一区二区三区最新精品| 国产一区二区精品丝袜| 中文字幕日本在线| 国产极品91| 青青依人| 超碰天天日| 国产SUV精品一区二区四区三区| 亚洲欧美人成无码苍井空| 丁香九月激情| 亚洲第一视频在线观看| 欧美国产激情| 无码少妇一区二区| 日韩偷拍自拍| 国产精品久久91| 亚洲乱码一区二区三| 精品人妻伦九区久久AAA片麻豆 | 九九热视频精品| 伊人久久精品| 国产乱乱| 欧美激情久久久久| 日韩视频免费看| 亚洲欧美日本国产| 国产黄色片在线| 中文字幕免费在线看线人| 美女被操爽了| 日本免费不卡| 中文成人在线| 亚洲欧美自拍偷拍| 久久sese| 你懂的国产在线| 黄瓜免费看nba蜜柚tv| 国产精品久久久久久人妻精品A片 国内精品自线在拍2020不卡 | 91人人爽人人爽人人爽| 大地资源二中文免费第二页| 老鸭窝LAOYAWO永久地址2019| 日本一区二区在线视频| 午夜av在线| 道日本一本草久| 欧美久久一区二区| 一级黄片在线| 国产熟女熟妇| 国产91啪啪| 免费中文字幕av| 人人妻人人澡人人| 婷婷精品久久| 日韩亚洲高清无码| 久久久久久无码国产| 亚洲中文字幕网| 亚洲天堂一二三区| 黑人与饥渴少妇在线| av你懂的| 高清不卡视频| 欧美 日韩 国产 成人| a天堂中文在线| 国产精品久久久久久久久齐齐| 麻豆传煤网站入口直接进| 婷婷丁香五月激情综合在线| 国产91精品看黄网站在线观看| www.亚洲激情| 午夜福利757| 午夜福利体验区| 人妻在线无码视频| 免费看无码| 永久免费av无码网站韩国毛片| 亚洲av久久| 精品国产亚洲AV妓女| 人妻多毛丰满熟妇av无码| 开心四房播播网| 涂了春药被一群人伦爽99势| 久久91精品国产91久| 免费欧美| 日韩精品无码A片一二三区| 中文字幕免费高清电视剧平台| 99九九精品国产高清自在线| 蜜臀在线观看视频| 黄色AV网址在线| 四虎成人午夜影视亚洲精品| 亚州天堂无码| 好深好湿好硬顶到了好爽| 国产精品图片| 免费观看黄色小说| www.婷婷五月天| 亚洲成人a v| 亚洲高清色| 911精品无码毛片| 精品国产人妻| 午夜免费福利电影| 中文日韩字幕| 三上悠亚中文字幕在线| 日韩欧美中文一区| 99黄色网| 人妻少妇一区二区三区| 天天夜夜操| 久久精品毛片| 在线亚洲午夜片AV大片| 日韩一区二区三区久久| 好男人视频在线观看影院| 欧美精品久久久| 日韩欧美精品中文字幕| 浪货撅高贱屁股求主人调教视频| 日本乱子人伦在线视频| 人妻无码AV一区二区三区| 伊人yinren6综合网色狠狠| 亚洲图片一区二区三区| 高清无码成人| Tusy极品欧美一区二区| 欧美日韩精品一区二区三区在线观看| 天堂欧美城网站| 天堂视频免费在线观看| 大香蕉影音| 韩日精品一区| 99视频国产精品免费观看A| 日韩无码一区二区三| 不卡中文AV| 日产久久视频| 免费看又黄又无码的网站| 国产小黄片在线| 麻豆影视文化传媒app最新版| 四平青年在线观看| 成全电影大全免费观看完整视频| 亚洲国产精选| 国产欧美一区二区三区蜜臀软件| 最近最新中文字幕高清免费| 成人毛片在线播放免费| 四虎成人精品在永久在线无码观看| 久久久久久久久久久久电影| 精品国产无码一区| 久久精品福利| 日本一区午夜爱爱| 韩国女主播av| 大鸡鸡| 人妻斩在线| 久久免费福利| 91九色首页| 天天干天天| 懂色av粉嫩av蜜臀av| 亚洲爽爽爽| 另类小说亚洲| 大地资源二中文在线观看| 亚洲不卡中文字幕| 欧美一二区视频| 性无码一区二区三区| 国产精品国产精品国产专区不粉h| 国产精品毛片一区二区三区| 久久久久无码精品国产699| 午夜亚洲影院在线观看| 最近最好看的2018中文字幕国语| 成全视频在线观看免费高清下载| 日韩精品三级| 久久久久www| 欧美狠狠| 久操视频在线观看| 成全视频高清在线观看| 三级片久久久久| 国产精品自拍99| 久久久av电影| 成人国产| 久久这里只精品热在线18| 国产调教在线| 国产精品久久久久久久久久酒店| 亚洲AV人人爽人人夜| 99精品欧美一区二区三区| 亚洲卡一卡二乱码新区仙踪下载| 亚洲人成图片网站| 日韩免费一区二区三区| 干欧美| 国产精品热| 国产在线精品一区二区三区| 四虎成人精品永久免费AV| 2018久久视频在线视频观看免费视频| 999亚洲国产精华液| 麻豆AV一区二区三区| 妓女综合网| 精品人妻互换一区二区三区| 五月婷婷激情在线| 国产福利久久| 国产精品性爱| 国产亚洲视频在线播放香蕉| 蜜桃视频成人A片免费观看| 国产精品一区二区毛片屁股| 又大又粗又硬又大又爽少妇毛片| 永久免费AV无码网站性色AV| 无限动漫网在线观看免费视频| 欧美黑人巨大xxx极品| 日韩亚洲精品视频| xxx国产精品| 麻豆影视在线直播视频| 大地影视资源官网入口 | 日韩性一级| 中文字幕无码久久99| 久久怡红院| 亚洲男神官网| 破多野结衣| 62久久久成人精品电影| 无码国产精品一区二区免费16| 伊人一区二区三区| 麻豆AV久久无码精品久久| 色天天爱天天狠天天透| 亚洲精品9999| 国产乱子伦一区二区三区| 精品午夜国产福利观看| 亚洲精品久久久久久偷窥| 国产二区精品| 久久男人网| 成全动漫在线观看免费观看国语| 破多野结衣| 在线观看你懂得| 久久人妻中文| 日韩一品二品三品| 一区二区激情视频| 欧美精品网站| 最近高清中文字幕在线国语5| 麻豆免费在线观看视频| 亚洲精品乱码久久久久久蜜桃动漫| 欧美国产一区二区三区激情无套| 國產日韓亞洲精品AV| 亚洲v国产v| 国产精品偷伦一区二区| 人人看人人摸| 精品成人一区| 日韩免费一级黄片| 久久久久久成人毛片免费看| av天堂网bt资源| 无码特级毛片免费视频| 久久久久无码精品| 麻豆影视在线直播视频| 999久久国产精品免费人妻| 亚洲操操操| 亚洲一级av无码毛片| 最近免费高清观看MV| 久久久久香蕉| 国产极品久久久久久久久久| 午夜福利激情| 午夜影院顶级大片| 亚洲综合无码AV| 精品无码久久久久国产| 国产午夜三级一区二区三| 热热色网站| 操逼视频在线观看免费| 国产SUV精品一区二区883| 国产色图在线观看| 91精品国产色综合久久不卡臀| 亚洲一区电影| 大地影视资源官网第二页| 日韩一二三区在线观看| 国产毛片久久久| 天堂网在线观看| 日韩一二三四区| 边添小泬边狠狠躁视频| 久草热8精品视频在线观看| 农村乱码一区二区三区| 久久久久无码精品| 亚洲 日韩 中文 制服| 午夜毛片免费| 美日韩黄色| 暖暖 在线 观看 免费 韩国| 99久久人妻精品免费一区二区| 国产白嫩美女无套久久| 麻豆文化传媒剪映免费网址| 久久AV国产麻豆HD真实乱| 久久精品一二| 人人看人人摸| 国产无码AAA| 久久精品一二三| 99热在线观看| 日韩午夜三级| 欧美男人亚洲天堂| 黄色电影一区二区三区| 国产精品久久久久的角色| 97人妻熟女成人免费视频| 美女自慰一区| 亚洲AV永久无码国产精品久久| 欧美日韩中文国产一区发布| 日韩无码不卡一区二区| 天天草天天干| 国内精品偷拍| 2018高清国产一区二区三区| 亚洲精品久久| 国产精品久久久久久久久久久久冷 | 免费看av的网址| 狠狠狠的在啪线香蕉| www.日本三级| 亚洲图片无码| 欧美亚洲性色影视在线| 91插插视频| 暖暖视频在线观看视频动漫| 中日无码精品久久久久久久久久| 亚洲一级二级| 国产伦老女人| 欧美日韩123| 一本色道久久爱88AV| 熟女少妇一码二码三码| 亚洲精品天堂| 国产精品69久久久熟女| 香蕉久久国产AV一区二区| 国产伦老女人| 色哟哟精品人妻| 大地资源影视中文二页| 欧美日本激情| 亚洲毛片一区二区| 99久久99九九99九九九| 黄色AV三级| 国产男女猛烈无遮挡A片软件| 微拍福利一区二区| 最近免费中文字幕MV在线电影| 激情开心五月天| 亚洲中文字幕在线观看| 尤物精品| 99久久99九九九99九他书对| 99视频69e精品视频| 丰满少妇一区二区三区专区| 国产在线精品福利大全| 综合天堂AV久久久久久久| 亚洲精华国产精华精华液网站| 天堂欧美城网站| 午夜激情小说| 久热久热久热| 97人人在线视频| 午夜视频在线观看| 午夜久| 极品美鲍一线天| 亚洲视频| 欧美亚洲高清国产| 四虎在线播放| 丁香婷婷六月| 欧美精品系列| 精品国产一区二区三区四区阿崩| 国产精品JIZZ在线观看无码| 欧美日韩无套内射另类| 亚洲永久精品视频| 秋霞影院午夜伦A片欧美| 欧美黑粗大| 亚洲一区二区视频| 久久无码| 免费超碰| 少妇又色又紧又黄又刺激免费| 亚洲欧美乱日韩乱国产| 免费看的黄色录像| 久久精品偷拍视频| 久久免费看毛片| 精品一区国产| 伊人精品综合| 国产无码高清视频| 97成人在线视频| 国产成人精品无码一区二区男按摩| 日韩有码一区二区三区| 一区二区三区小说| 久艹在线视频| 人妖一区二区| 精品一区亚洲| 热线有精品视频6| 成人深夜视频| 在线日韩中文字幕| 日韩欧美Aⅴ综合网站发布| 激情五月天av| 亚洲香蕉| 香蕉碰碰| 免费国产自线拍| 欧美黄色a| 久热这里在线精品| 人妻黑人ntr黑人社长的超激| 亚洲区中文字幕在线不卡电影| 嗯啊灬啊灬灬欧美视频| 婷婷四房色播| 久久精品—区二区三区舞蹈| 无码人妻精品一区二区三区蜜| 超碰天天| 国产亚洲精品久久久久久大师| 国模私拍一区二区三区| 五月激情四射网| 蜜桃丰满熟妇av无码区不卡| 中文资源在线观看| 樱花影院| 国产视频91在线| 99热在线观看精品| 日本一区二区三区在线观看视频| 国产精品久久久久久人妻黑料| 日韩一区二区三区四区五区| 91欧美国产| 日韩精品久久久久久免费| 免费国产一区| 公车上疯狂高潮呻吟摸揉| 午夜福利视频欧美| 久久久久久久久久免免费精品| 亚洲AV首页| 日韩久久影院| 国产gv在线| 92国产精品| 色欲天天婬色婬香影院| 久久久蜜桃| 日本人妻影院| 暖暖 视频 高清 日本 在线1| 久久性色| 色开心| 日本在线一区| 亚洲av网在线观看| 美女被抽插舔B到哭内射视频免费| 亚洲精品69| 色色色色AV| 手机午夜福利1000视频| free欧美性xxxxhd天美| 亚洲免费视频在线| 欧美日韩黄色电影| 欧美大屁股流白浆xxxx视频| 日产一线二线三线哺乳| wwwxx日本| 新香蕉视频在线| 色综合99| 久久精品欧美日韩| 成全在线观看免费观看大全| 国产性―交一乱―色| 久久国产视频网站| 麻豆视传媒短视频网站-入口2021| 亚洲欧美日本一区| 日韩A片无码一区二区三区电影| 亚洲精品欧美成人| AV夜夜躁狠狠躁日日躁| 一本大道东京热无码| 国产综合影院| 亚洲AV久久综合无码东京| 超薄丝袜连裤袜一二三区| 欧美国产日产一区二区| 日韩激情在线| 在线观看成人av| 无码欧洲| 欧美干B骚荡货| 成都私人情侣免费看电视剧的软件| 婷婷爱五月| 日韩激情在线| 欧美爱爱网址| 亚洲午夜AV久久久精品影院色戒 | 四平青年完整版| 无码一二三区| 无码人妻精品一区二区三千菊电影 | aaa级久久久精品无码片| 久久久精品人妻av一区二区三区| 在线おっさんとわたし天堂| 久久亚洲国产成人精品性色| 国产亚洲欧美视频| 最好看的中文字幕国语2019| 日韩无码精品久久| 有码精品| 欧美日韩中文国产一区发布| 琪琪电影网午夜理论片717西瓜| 国产精品久久久无码一区二区三区| 麻豆视传媒短视频免费2021| 欧美日韩激情在线观看| 国产精品99久久久久久久久| 国产精品美女一区二区三区| 亚洲一二三| 人妻AV影院| 桃色bt| 国产AV无码AV| 亚洲国产不卡| 精品孕妇一区二区三区| 麻豆视传媒短视频的服务行业 | 99久久99久久| 一本一道人妻久久久久久久中文字幕| 色天天爱天天狠天天透| 一区二区三区视频在线观看| 人妻无码日韩| 大地资源中文第二页日本| 久久激情网| 韩日成人电影| 亚洲综合91| 奇米色在线视频| 久久久无码精品成人A片小说| 日韩午夜在线观看| 日韩欧美人妻少妇| 最近更新中文2018年高清| 婷婷成人在线| 久久av高潮aV| 在线看视频| 桃色AV久久无码线观| 国产成人精品视频| 欧美伊人在线| 精品人妻无码一区二区三区91电影| 日韩亚洲AV无码波多野结衣| 臭小子姨妈腰快断了第12集| 亚洲AV久久爆乳一区二区| 色接久久| 操逼免费看视频| 中文字幕日产av| 人与人和人与物XXX| 欧美日韩中文一区| 日韩调教| 大地影视资源中文第二页| 国产精品亚洲一区二区无码| 人妻aⅴ无码一区二区三区| 亚洲色情偷拍自拍| 强壮的公么征服免费看| 久久精品人妻| 欧美一区二区三区久久久| 日本欧美一区二区三区不卡视频 | 色综合中文字幕| 99re6在线视频| 亚洲bt成人| 麻豆MD传媒MD0049入口| 久久久精品人妻| 伊朗一港口发生高强度爆炸| 美女特级毛片| 欧美亚洲熟妇一区二区三区| 欧美日本国产| 日韩精品一区二区亚洲AV| 国产亚洲精品久久久久久打不开| 99re国产在线| 暖暖 高清 日本 视频| 日韩综合网| 亚洲天堂无码在线| 免费国产一区二区| 黄色aV视屏| 丁香成年社区| 亚洲精品午夜一区二区电影院| 色小姐综合网| 日韩一区二区三区在线| 男子失踪13天其电动车被发现| 国产AV一区二区三区人妻| 丰满岳乱妇一区二区三区| 人妻中文无码| 欧美a网站| 国产成人激情| 日本在线视频一区二区| 麻豆传煤官网入口免费进入| 少妇喷水视频| 欧美日韩激情一区| 五月开心激情网| 欧美第四页| 91性爱小视频| 久久久精品欧美一区二区免费 | 熟女一区二区三区| www国产亚洲精品久久网站| 麻豆人妻换人妻好紧| 中文字幕精品AV一区二区五区| 暖暖视频免费最新在线观看 | 视频在线一区二区三区| 最近中文字幕在线MV免费| 日韩一区二区三区无码A片| 性无码专区| 日本三级少妇三级99A-百度| 国产精品蜜臀Av| 在线一卡二卡三卡不卡| 色情五月天色婷婷| 精品久久久久久无码| 天堂无码在线| 二区三区av| 婷婷午夜福利| 九色国产精品| 日韩一卡2卡3卡无卡新区乱码| 国产福利小视频尤物98| 2018高清国产一区二区三区| 欧美亚洲日本一区| 狼友视频首页| 懂色a国产精品免费| 成人97| 日韩女同一区二区三区| 国产色综合视频| WWW.丁香色情.COM| 玖玖精品| 国产欧美日| 日韩AV一二区| 日韩在线你懂的| 国产精品精品久久久| 带色网站| 色欲久久综合亚洲精品蜜桃| 日日噜噜大屁股熟妇| MD传媒永久入口| 91天堂最新在线观看| 天堂久久精品| 欧美日韩毛| 久久久久久久久久一区二区三区| 欧美操人| 麻豆一级黄片| 五月色丁香婷婷网蜜臀AV| 亚洲精品久久久久无码AV片软件| 国产精品日韩精品| 久久久亚洲精品一区二区三区浴池| 亚洲中文字幕网| 波多野结衣无码专区| 国产69精品久久久| 一级黄片A| 国产色图视频| 亚洲熟女少妇| 国产男女猛烈无遮挡A片软件| 麻豆传煤app官网网页入口下载| 欧美乱视频| 人妻无码在线视频| 久久久视| 日本一道aⅴ不卡免费播放| 久久久久久高清| 久久综合精品国产二无码| 国产亚洲二区| 亚洲区久久| 婷婷开心色四房播播| 亚洲A片一区日韩精品无码 | 国产精品污视频| xxxx69国产| 亚洲av成人无码一二三在线观看| 国产精品免费精品一区| 美日韩无码| 亚洲国产成人无码17c| 色哟哟在线免费观看| 欧美一级片在线看| www.蜜臀| 亚洲免费av| 欧美色老熟妇与性老熟妇| 昭和五十路和六十路| 亚洲AV图| 久久视频这只精品99re6| AV无码网| 精品亚洲国产熟妇乱码| 88午夜理论不卡| 五月综合视频| 四房播播色五月| 伊人一本到香蕉视频观看| 97在线精品视频免费| 国内成人自拍| 欧美最猛黑人AAAAA片| 97天堂| 国产精品探花熟女AV| 国产一区二区精品欧美| 色欲人妻无码AV专区| 日本天堂视频| 久久久久亚洲AV成人网人人网站| 亚洲综合色域| www.插插插.com| 欧美影院久久| 95无码人妻精品一区二区三区| 国产高清二区| 日韩精品一区二区三区在线播放 | 被抽插视频| 亚洲一区国产一区| 日韩资源| 国产精品天天av精麻传媒| 无码电影网址| 欧美性爱五月天| 婷婷综合久久| 97最新网址| 男人的天堂在线播放| 久久精品亚洲作者| 淫荡人妻在线视频| 天天躁日日躁狠狠躁av无码| 麻豆视传媒短视频网站-入口2021仙踪林免费 | 精品日韩人妻| 午夜爽爽爽| 久久青草在线视频精品| 国产夫妻在线视频| 免费+国产+无码| 最近2018中文字幕免费高清大全| 久久久视频2019午夜福利| 国产麻豆MD传媒视频| 久久久99精品免费观看| 大地资源中文在线观看免费| 少妇饥渴偷公乱第一章全文| 亚洲国产精品久久又爽黄A片| 亚洲色偷偷偷网站色偷一区 | 猫咪aV大香蕉| 尤物视频最新网址| 亚洲一区二区三区四区aV| 又大又粗又爽的视频| 在线不卡视频| 美女被操| 日本一区二区免费电影| 日产久久视频| www.嫩草影院| 艳妇乳肉豪妇荡乳AV| 91中文字幕| 麻豆传煤app官网网页入口下载| 国产国拍精品AV在线观看| 国产福利萌白酱在线观看网站| 四房播播开心| 亚洲AV无码一区二区三区乱子伦| DVD人人人澡人人人爽| 久久久人体艺术| 黄色三级片网站| 青青草福利| 久久久久久久毛片| 日韩无码 国产精品| 麻豆传煤官网app黄入口| 伊人影院香蕉久在线26| 人妻无码AV久久一二三区| 泷泽萝拉种子内涵图| avttb2014天堂网最新| 亚洲 图 欧洲 自拍 图片| 丁香五月天的最新地址| 最近免费中文字幕大全免费| 伊人一本到香蕉视频观看| 色情五月| 亚洲免费天堂| 日本又黄又爽视频| 懂色av懂色av粉嫩av分享吧| av一级久久| 又大又粗又硬又大又爽少妇毛片| 欧洲亚洲精品| 欧美日本一区| 最近中文字幕在线中文视频 | 国产精品激情偷乱一区二区∴| 亚洲一区国产精品| 老湿机视频| 加勒比精品| 91啦丨九色丨刺激中文| 国产伦精品一区二区妓女| 日韩 欧美 亚洲| 午夜精品久久久久久久| 中文人妻无码| 暖暖 在线 观看 免费 韩国| 亚洲午夜精品A片久久W| 99re8在线精品视频免费播放| 久久精品99久久| 日本人妻精品| 日韩视频一区二区| 亚洲免费视频网站 | 开心五月色婷婷综合开心网| 欧美成人AAA片一区国产精品| xxxx内射中国老妇| 欧洲AV无码| 国产污网站| 色情五月天色婷婷| 蜜臀AV久久国产午夜福利软件| 91久久香蕉囯产熟女线看内容| 99精品福利| 激情av免费| 色婷婷中文字幕| 超大号黑吊magnet| 丁香五月天的最新地址| 国产精品99久久久久久人四| 国产精品天天av精麻传媒 | 欧美熟妇另类久久久久久不卡| 久久人人超碰| 国产又黄又爽又刺激的免费网址 | 无码h片| 欧美日韩后| 99这里有精品视频视频| 日韩不卡一卡二卡3卡四卡2021免费 | 日韩AV自拍偷拍| 后入内射无码人妻一区| 亚洲AV无码精品日韩韩难H| 91亚洲一线产区二线产区| 黄频暖暖网站| 羞羞午夜福利免费视频| 久久播电影| 最新毛片网址| 日本爽妇网| 伊人激情AV一区二区三区| 99热最新网址获取| 日韩午夜视频在线观看| 亚洲第一在线视频| 亚洲无码AV一区二区| JK成人福利视频网站在线观看| 天堂草原网在线观看| 国产真人毛片| 欧美成人国产精品高潮| 久久精品国产AV| 星空影院| 本道综合精品| 婷婷开心情五月色在线| 欧美一区在线看| 男人扒女人添高潮视频| 无码天堂网| 四虎综合| 亚洲AV无码一区二区三区乱子伦| 美国毛片基地99久久| 国产精品V| 99热国产这里只有精品9九| 欧美性爱 五月| 黑人少妇嫩草AV无码专区| 成人毛片18| 噜噜噜在线| 亚洲色无码A片一区二区情欲 | 欧美精品中文字幕久久二区| 国产精品一区二区AV交换 | 悠悠资源站uuzyz.com| 久就热视频精品免费99| 国精品午夜福利视频不卡麻豆| 日韩一区二区精品区| 成人三级片在线观看| 在线观看黄色片| 五月婷婷一区| 国产激情网址| 亚洲激情视频在线观看| 青青青国产在线观看手机免费| 亚洲一区二区高清| 任你躁任你躁| 激情五月天影院| 亚洲第9页| 精品无码国产污污污在线观看 | 密臂av性久久久久蜜臂av| 高清无码一二三区| 99久久国产露脸精品国产麻豆| AV在线麻豆| 国产精品毛片VA一区二区三区| 超碰超碰超碰超碰| 亚洲JIZZJIZZ女人|