久久久勾缠精品夜色|99勾缠成人高清在线观看|一级做a爰片欧美一区|熟妇人素无码中文字幕|久久久勾缠精品欧美激情|欧美日韩一区精品在线|勾缠精品美女自在线观看免费|欧美另类极品videosbest视|日韩v欧美V另类蜜桃|麻豆久久五月综合勾缠

網(wǎng)站公告-NOTICE

新聞資訊

當(dāng)前位置:首頁(yè) / 新聞資訊

山東電纜橋架安裝施工要求及規(guī)范

  電纜橋架在我國(guó)的應(yīng)用只有十多年,在歐美發(fā)達(dá)也不過(guò)是幾十年。在一個(gè)機(jī)房項(xiàng)目中,比起造價(jià)昂貴、高科技的硬件和軟件,橋架顯的很不起眼,也很少為人關(guān)注,但它卻也是整個(gè)布線(xiàn)工程中不可缺少的部分。那么在施工中電纜橋架安裝施工要求及規(guī)范怎么樣?

  The application of cable trays in China has only been more than ten years, and in developed countries in Europe and America, it is only a few decades. In a computer room project, compared to expensive and high-tech hardware and software, cable trays may appear inconspicuous and receive little attention, but they are still an indispensable part of the entire cabling project. So what are the requirements and standards for the installation of cable trays during construction?base64_image

  1 一般規(guī)定  1.1本章適用于電壓為10KV及以下新建擴(kuò)建的一般工業(yè)與民用建筑電纜、橋架安裝和橋架內(nèi)電纜敷設(shè)

  1 General Provisions 1.1 This chapter applies to the installation of cables, cable trays, and cable laying inside cable trays for newly constructed and expanded general industrial and civil buildings with a voltage of 10KV or below

  1.2電纜橋架安裝和橋架內(nèi)電纜敷設(shè),應(yīng)按已批準(zhǔn)的設(shè)計(jì)文件施工。

  1.2 The installation of cable trays and the laying of cables inside the trays shall be carried out in accordance with the approved design documents.

  1.3由支、吊、托架支撐的托盤(pán)(槽)或梯架直線(xiàn)段、彎通非直線(xiàn)段組合而成,敷設(shè)電纜具有連續(xù)性的剛性結(jié)構(gòu)系統(tǒng),為電纜橋架。見(jiàn)圖1.3

  1.3 A rigid structural system consisting of trays (troughs) or ladder straight sections and curved non straight sections supported by supports, hangers, and brackets, with continuous cable laying, is called a cable tray. Refer to Figure 1.3

  1.4 金屬電纜橋架及其支架和引入或引出的金屬電纜導(dǎo)管必須接地(PE)或接零(PEN)可靠,且必須符合下列規(guī)定:

  1.4 Metal cable trays and their supports, as well as metal cable conduits introduced or led out, must be reliably grounded (PE) or grounded (PEN), and must comply with the following regulations:

  1.4.1金屬電纜橋架及支架全長(zhǎng)應(yīng)不少于2處與接地(PE)或接零(PEN)干線(xiàn)相連接;

  1.4.1 The total length of metal cable trays and supports should be connected to the grounding (PE) or neutral (PEN) main line at no less than 2 points;

  1.4.2非鍍鋅電纜橋架間連接板的兩端跨接線(xiàn)銅芯接地線(xiàn),接地線(xiàn)小允許截面積不小于4mm2;

  1.4.2 Copper core grounding wire for the two ends of the connecting plate between non galvanized cable trays, with a minimum allowable cross-sectional area of not less than 4mm2 for the grounding wire;

  1.4.3鍍鋅電纜橋架間連接板的兩端不跨接接地線(xiàn),但連接板兩端不少于2個(gè)有防松螺帽或防松墊圈的連接固定螺栓。

  1.4.3 The two ends of the connecting plate between galvanized cable trays shall not be connected to the grounding wire, but there shall be no less than 2 connection fixing bolts with anti loosening nuts or anti loosening washers at both ends of the connecting plate.

  1.4.5電纜敷設(shè)嚴(yán)禁有絞擰、鎧裝壓扁、護(hù)層斷裂和表面嚴(yán)重劃傷等缺陷。

  1.4.5 Cable laying must strictly prohibit defects such as twisting, flattening of armor, breakage of protective layer, and severe surface scratches.

  1.4.6電纜橋架處如有防火要求的場(chǎng)所,應(yīng)采取防火隔離措施。

  If there are fire prevention requirements at the cable tray location, fire isolation measures should be taken.

  2 施工準(zhǔn)備

  2. Construction preparation

  2.1 技術(shù)準(zhǔn)備:

  2.1 Technical Preparation:

  2.1.1按照已批準(zhǔn)的施工組織設(shè)計(jì)(施工方案)進(jìn)行技術(shù)、交底。

  2.1.1 Conduct technical and safety briefings in accordance with the approved construction organization design (construction plan).

  2.1.2 施工執(zhí)行工藝標(biāo)準(zhǔn)、圖集、規(guī)范齊全。

  2.1.2 The construction execution process standards, drawings, and specifications are complete.

  2.1.3電纜橋架敷設(shè)前,應(yīng)檢查橋架敷設(shè)有無(wú)與其他設(shè)備、管線(xiàn)交叉或重疊無(wú)法施工的地方,施工前應(yīng)與各工種、監(jiān)理或建設(shè)單位及設(shè)計(jì)單位協(xié)商好,并作好記錄,以保證施工順利進(jìn)行。

  Before laying cable trays, it is necessary to check whether there are any areas where the tray crosses or overlaps with other equipment or pipelines that cannot be constructed. Prior to construction, it is necessary to consult with various trades, supervisors, construction units, and design units, and make records to ensure smooth construction.

  2.1.4根據(jù)施工圖或施工所用電纜應(yīng)作好電纜牽引力的計(jì)算。

  2.1.4 According to the construction drawings or the cables used for construction, the calculation of cable traction force should be carried out.

  1.電纜橋架規(guī)格及型號(hào)必須符合設(shè)計(jì)要求,附件齊全;橋架與配件、附件和緊固件各種型鋼均應(yīng)采用鍍鋅標(biāo)準(zhǔn)件。

  1. The specifications and models of cable trays must meet the design requirements, and all accessories must be complete; All types of steel for cable trays, accessories, attachments, and fasteners should use galvanized standard parts.

  2.各種規(guī)格電纜橋架的直線(xiàn)段、彎通、橋架附件及支、吊架立柱及型鋼等有產(chǎn)品合格證,橋架內(nèi)外應(yīng)光滑平整,無(wú)棱刺,不應(yīng)有扭曲翹邊等變形現(xiàn)象。

  2. The straight sections, bends, accessories, supports, hangers, columns, and steel sections of various specifications of cable trays should have product certification. The inside and outside of the tray should be smooth and flat, without edges or burrs, and there should be no distortion or warping.

  3.橋架訂貨或制作應(yīng)按設(shè)計(jì)要求進(jìn)行,不應(yīng)有誤,應(yīng)反復(fù)校核以免造成浪費(fèi)。

  3. The ordering or production of cable trays should be carried out according to the design requirements, without errors, and should be repeatedly checked to avoid waste.

  4.橋架安裝選擇需屏蔽電氣干擾的電纜回路,有腐蝕的場(chǎng)所、易燃粉塵場(chǎng)所,應(yīng)選用無(wú)蓋無(wú)孔封閉型托盤(pán),當(dāng)需要因地制宜的場(chǎng)所,宜選用組裝式托盤(pán)或有孔托盤(pán)及梯架;在容易積灰和其它需遮蓋的環(huán)境或戶(hù)外場(chǎng)所,宜帶有蓋板。低壓電力電纜與控制電纜共用同一托盤(pán)或梯架時(shí),應(yīng)選用中間有隔板的托盤(pán)或梯架;在托盤(pán)、梯架分支、引上、引下處應(yīng)設(shè)適當(dāng)?shù)膹澩ǎ灰蚴芸臻g條件限制不便裝設(shè)彎通或有特殊要求時(shí),可選用軟連接板,鉸接板;伸縮縫應(yīng)設(shè)置伸縮板;連接兩段不同寬度或高度的托盤(pán)、梯架可配置變寬或變高板。但在施工中,支、吊架和橋架的選擇應(yīng)依設(shè)計(jì)或工程布置條件選擇。

  4. When installing cable trays, cable circuits that need to be shielded from electrical interference should be selected. In places with corrosion and flammable dust, uncovered and non perforated enclosed trays should be used. When suitable for local conditions, assembled trays or perforated trays and ladders should be selected; In environments or outdoor places that are prone to dust accumulation and require cover, it is advisable to have a cover plate. When low-voltage power cables and control cables share the same tray or ladder, a tray or ladder with a partition in the middle should be selected; Appropriate bends should be installed at the branching, leading up, and leading down points of pallets and ladders; When it is not convenient to install bends due to space constraints or there are special requirements, soft connecting plates and hinged plates can be used; Expansion joints should be equipped with expansion plates; Connecting two trays or ladders of different widths or heights can be configured with variable width or height boards. However, during construction, the selection of supports, hangers, and cable trays should be based on the design or engineering layout conditions.

  5.托盤(pán)、梯架的寬和高度,應(yīng)按下列要求選擇:

  5. The width and height of pallets and ladders should be selected according to the following requirements:

  (1)電纜在橋架內(nèi)的填充率,電力電纜不應(yīng)大于40%;控制電纜不應(yīng)大于50%。并應(yīng)留有一定的備用空位,以便今后為增添電纜用;

  (1) The filling rate of cables in cable trays should not exceed 40% for power cables; The control cable should not exceed 50%. And there should be some spare space left for future cable additions;

  (2)所選托盤(pán)、橋架規(guī)格的承載能力應(yīng)滿(mǎn)足規(guī)定。其工作均布荷載不應(yīng)大于所選托盤(pán)、梯架荷載等級(jí)的額定均布荷載;

  (2) The bearing capacity of the selected tray and bridge specifications should meet the requirements. The uniformly distributed load of its work should not exceed the rated uniformly distributed load of the selected pallet and ladder load level;

  (3)工作均布荷載下的相對(duì)撓度不宜大于1/200。

  (3) The relative deflection under uniformly distributed load should not exceed 1/200.

  托盤(pán)、梯架直線(xiàn)段,可按單件標(biāo)準(zhǔn)長(zhǎng)度選擇。單件標(biāo)準(zhǔn)長(zhǎng)度一般規(guī)定為2、3、4、6m。托盤(pán)、梯架的寬度與高度常用規(guī)格尺寸系列如表2.4-1

  Tray and ladder straight sections can be selected according to the standard length of a single piece. The standard length of a single piece is generally specified as 2, 3, 4, and 6 meters. The commonly used specifications and dimension series for the width and height of pallets and ladders are shown in Table 2.4-1

  注:符號(hào)△表示常用規(guī)格。

  Note: The symbol △ represents commonly used specifications.

  各類(lèi)彎通及附件規(guī)格,應(yīng)適合工程布置條件,并與托盤(pán)、梯架配套。

  All types of bends and accessory specifications should be suitable for the engineering layout conditions and matched with pallets and ladders.

  支、吊架規(guī)格選擇,應(yīng)按托盤(pán)、梯架規(guī)格層數(shù)、跨距等條件配置,并應(yīng)滿(mǎn)足荷載的要求。

  The selection of support and hanger specifications should be based on the number of layers, span, and other conditions of the pallet and ladder, and should meet the requirements of the load.

  鋼制橋架的表面處理方式,應(yīng)按工程環(huán)境條件、重要性、耐久性和技術(shù)經(jīng)濟(jì)性等因素進(jìn)行選擇。一般情況宜按表2.4-2選擇適用工程環(huán)境條件的防腐處理方式。當(dāng)采用表中“T”類(lèi)防腐方式為鍍鋅鎳合金、高純化等其它防腐處理的橋架,應(yīng)按規(guī)定試驗(yàn)驗(yàn)證,并應(yīng)具有明確的技術(shù)質(zhì)量指標(biāo)及檢測(cè)方式。

  The surface treatment method for steel cable trays should be selected based on factors such as engineering environmental conditions, importance, durability, and technical economy. Generally, it is advisable to choose the anti-corrosion treatment method that is suitable for the engineering environmental conditions according to Table 2.4-2. When using the "T" anti-corrosion method in the table, such as galvanized nickel alloy, high-purity or other anti-corrosion treatments, the bridge should be tested and verified according to regulations, and should have clear technical quality indicators and testing methods.

  注:符號(hào)“○”表示防腐類(lèi)別。

  Note: The symbol "○" indicates the recommended anti-corrosion category.

  6.橋架的外觀(guān)檢查

  6. Appearance inspection of bridge frame

  橋架產(chǎn)品包裝箱內(nèi)應(yīng)有裝箱清單、產(chǎn)品合格證及出廠(chǎng)檢驗(yàn)報(bào)告。托盤(pán)、梯架板材厚度應(yīng)滿(mǎn)足表2.6的規(guī)定。表面防腐層材料應(yīng)符合現(xiàn)行有關(guān)標(biāo)準(zhǔn)的規(guī)定。

  The packaging box for bridge products should include a packing list, product certification, and factory inspection report. The thickness of pallets and ladder boards should meet the requirements of Table 2.6. The surface anti-corrosion coating material should comply with the relevant national standards currently in effect.

  熱浸鍍鋅的托盤(pán)、橋架鍍層表面應(yīng)均勻,無(wú)毛刺、過(guò)燒、掛灰、傷痕、局部未鍍鋅(直徑2mm以上)等缺陷,不得有影響安裝的鋅瘤。螺紋的鍍層應(yīng)光滑,螺栓連接件應(yīng)能擰入。

  The surface of hot-dip galvanized trays and cable trays should be uniform, without defects such as burrs, overburning, hanging dust, scars, and partial non galvanizing (diameter of 2mm or more), and there should be no zinc nodules that affect installation. The coating of the thread should be smooth, and the bolt connection should be able to be screwed in.

  電鍍鋅的鋅層表面應(yīng)光滑均勻,致密。不得有起皮、氣泡、花斑、局部未鍍、劃傷等缺陷。

  The surface of the zinc layer of electroplated zinc should be smooth, uniform, and dense. There shall be no defects such as peeling, bubbles, flower spots, partial uncoated areas, scratches, etc.

  噴涂應(yīng)平整、光滑、均勻、不起皮、無(wú)氣泡水泡。

  The spraying should be smooth, even, without peeling or bubbles.

  橋架焊縫表面均勻,不得有漏焊、裂紋、夾渣、燒穿、弧坑等缺陷。

  The surface of the bridge welding seam should be uniform and free of defects such as missed welding, cracks, slag inclusion, burn through, arc craters, etc.

  橋架螺栓孔徑,在螺桿直徑不大于M16時(shí),可比螺桿直徑大2mm。

  The hole diameter of the bridge bolt can be 2mm larger than the screw diameter when the screw diameter is not greater than M16.

  螺栓連接孔的孔距允許偏差:同一組內(nèi)相鄰兩孔間距±0.7mm,同一組內(nèi)任意兩孔間距±1mm;相鄰兩組的端孔間距±1.2mm。

  The allowable deviation for the distance between bolt connection holes is: the distance between adjacent holes in the same group is ± 0.7mm, the distance between any two holes in the same group is ± 1mm, and the distance between end holes in adjacent groups is ± 1.2mm.

  7.膨脹螺栓:應(yīng)根據(jù)允許拉力和剪力進(jìn)行選擇;可按計(jì)劃驗(yàn)收,絲扣應(yīng)完好無(wú)損。

  7. Expansion bolts: should be selected based on allowable tensile and shear forces; The inspection can be carried out according to the plan, and the thread should be intact and undamaged.

  8.電纜應(yīng)有合格證和“CCC”認(rèn)證標(biāo)志,并應(yīng)有“CCC”認(rèn)證復(fù)印件;每盤(pán)電纜上應(yīng)標(biāo)明規(guī)格、型號(hào)、電壓等級(jí)、長(zhǎng)度及出廠(chǎng)日期電纜相應(yīng)完好無(wú)損。

  8. The cable should have a certificate of conformity and the "CCC" certification mark, and should have a copy of the "CCC" certification; Each cable reel should indicate the specifications, model, voltage level, length, and date of manufacture, and the cable should be intact and undamaged accordingly.

  9.電纜外觀(guān)完好無(wú)損,鎧裝無(wú)銹蝕、無(wú)機(jī)械操作,無(wú)皺折和扭曲現(xiàn)象。油浸電纜應(yīng)密封良好,無(wú)漏油及滲油現(xiàn)象。橡套及塑料電纜外皮及絕緣層無(wú)老化及裂紋。電纜端頭密封良好。

  9. The appearance of the cable is intact and undamaged, the armor is not corroded, there is no mechanical operation, and there is no wrinkling or twisting phenomenon. Oil immersed cables should be well sealed without oil leakage or seepage. The rubber sleeve and plastic cable sheath and insulation layer have no aging or cracks. The cable end is well sealed.

  10.其它附屬材料;電纜標(biāo)示牌、油漆、汽油、封鉛、硬脂酸白布帶、橡皮包布、黑包布、塑料絕緣帶等均應(yīng)符合要求

  10. Other ancillary materials; Cable signs, paint, gasoline, lead sealing, stearic acid white cloth tape, rubber wrap, black wrap, plastic insulation tape, etc. should all meet the requirements

  3 施工工藝

  3 Construction Techniques

  3.1 電纜橋架安裝施工工藝

  3.1 Construction process for cable tray installation

  3.1.1電纜橋架安裝工藝流程:

  3.1.1 Cable tray installation process:

  定位放線(xiàn)→預(yù)埋鐵件或膨脹螺栓→支、吊、托架安裝→橋架安裝→保護(hù)接地安裝

  Positioning and laying out → Pre embedded iron parts or expansion bolts → Installation of supports, hangers, and brackets → Installation of cable trays → Installation of protective grounding

  3.1.2根據(jù)施工圖確定始端到終端位置,沿圖紙標(biāo)定走向,找好水平、垂直、彎通,用粉線(xiàn)袋或畫(huà)線(xiàn)沿橋架走向在墻壁、頂棚、地面、梁、板、柱等處彈線(xiàn)或畫(huà)線(xiàn),并均勻檔距畫(huà)出支、吊、托架位置。

  3.1.2 Determine the starting and ending positions according to the construction drawing, mark the direction along the drawing, find the horizontal, vertical, and curved lines, use a powder line bag or draw lines along the bridge direction to snap or draw lines on walls, ceilings, floors, beams, slabs, columns, etc., and draw the positions of supports, hangers, and brackets evenly spaced.

  3.1.3預(yù)埋鐵件或膨脹螺栓

  3.1.3 Pre embedded iron parts or expansion bolts

  (1) 預(yù)埋鐵件的自制加工不應(yīng)小于120mm×80mm×6mm,做法如本標(biāo)準(zhǔn)6.3.7.2圖6.3.7.2。其錨固圓鋼的直徑不小于10mm。

  (1) The self-made processing of embedded iron parts should not be less than 120mm × 80mm × 6mm, as shown in Figure 6.3.7.2 of this standard. The diameter of the anchored round steel shall not be less than 10mm.

  (2) 緊密配合土建結(jié)構(gòu)的施工,將預(yù)埋鐵件平面緊貼模板,將錨固圓鋼用綁扎或焊接的方法固定在結(jié)構(gòu)內(nèi)的鋼筋上;待混凝土模板拆除后,預(yù)埋鐵件平面外露,將支架、吊架或托架焊接在上面進(jìn)行固定。

  (2) Closely cooperate with the construction of civil engineering structures, tightly adhere the embedded iron parts to the formwork, and fix the anchoring round steel to the steel bars inside the structure by binding or welding; After the concrete formwork is removed, the embedded iron parts should be exposed on the surface, and the brackets, hangers or brackets should be welded on top for fixation.

  (3) 根據(jù)支架承受的荷重,選擇相應(yīng)的膨脹螺栓及鉆頭;埋好螺栓后,可用螺母配上相應(yīng)的墊圈將支架或吊架直接固定在金屬膨脹螺栓上,可參見(jiàn)本標(biāo)準(zhǔn)6.3.7.7圖表。

  (3) Select the corresponding expansion bolts and drill bits based on the load borne by the bracket; After burying the bolts, the bracket or hanger can be directly fixed to the metal expansion bolt with nuts and corresponding washers, as shown in Figure 6.3.7.7 of this standard.

  4.支、吊架安裝

  4. Installation of supports and hangers

  (1) 支架與吊架所用鋼材應(yīng)平直,無(wú)顯著扭曲。下料后長(zhǎng)短偏差應(yīng)在3mm范圍內(nèi),切口處應(yīng)無(wú)卷邊、毛刺;

  (1) The steel used for brackets and hangers should be straight and free from significant distortion. The length deviation after cutting should be within 3mm, and there should be no curled edges or burrs at the incision;

  (2) 鋼支架與吊架應(yīng)焊接牢固,無(wú)顯著變形,焊接前厚度超過(guò)4mm的支架、鐵件應(yīng)打坡口,焊縫均勻平整,焊縫長(zhǎng)度應(yīng)符合要求,不得出現(xiàn)裂紋、咬邊、氣孔、凹陷、漏焊等缺陷;

  (2) Steel brackets and hangers should be welded firmly without significant deformation. Brackets and iron parts with a thickness exceeding 4mm before welding should be chamfered, and the weld seam should be uniform and smooth. The weld seam length should meet the requirements and should not have defects such as cracks, undercutting, porosity, indentation, or missed welding;

  (3)支架與吊架應(yīng)安裝牢固,保證橫平豎直,在有坡度的建筑物上安裝支架與吊架應(yīng)與建筑物的坡度、角度一致;

  (3) The brackets and hangers should be installed firmly, ensuring horizontal and vertical alignment. When installing brackets and hangers on buildings with slopes, they should be consistent with the slope and angle of the building;

  支架與吊架的規(guī)格一般不應(yīng)小于扁鋼30mm×3mm;角鋼25mm×25mm×3mm;

  The specifications of brackets and hangers should generally not be less than 30mm × 3mm for flat steel and 25mm × 25mm × 3mm for angle steel;

 ?。?)嚴(yán)禁用電氣焊切割鋼結(jié)構(gòu)或輕鋼龍骨任何部位;

  (5) It is strictly prohibited to use electrical welding to cut any part of steel structures or light steel joists;

 ?。?)吊具應(yīng)采用定型產(chǎn)品,并應(yīng)有各自獨(dú)立的吊裝卡具或支撐系統(tǒng)。

  (6) Universal lifting devices should use standardized products and have their own independent lifting fixtures or support systems.

 ?。?)固定支點(diǎn)間距一般不應(yīng)大于1.5~2m。在進(jìn)出接線(xiàn)盒、箱、柜、轉(zhuǎn)角、轉(zhuǎn)彎和變形縫兩端及丁字接頭的三端500mm以?xún)?nèi)應(yīng)設(shè)固定支持點(diǎn)。

  (7) The distance between fixed support points should generally not exceed 1.5-2m. Fixed support points should be set within 500mm at both ends of the entrance and exit junction boxes, boxes, cabinets, corners, bends, and deformation joints, as well as at the three ends of the T-shaped joint.

 ?。?)嚴(yán)禁用木磚固定支架與吊架。

  (8) It is strictly prohibited to use wooden bricks to fix brackets and hangers.

  5.橋架安裝

  5. Bridge installation

  (1) 電纜橋架水平敷設(shè)時(shí),支撐跨距一般為1.5~3m,電纜橋架垂直敷設(shè)時(shí)固定點(diǎn)間距不宜大于2m。橋架彎通彎曲半徑不大于300mm時(shí),應(yīng)在距彎曲段與直線(xiàn)段結(jié)合處300~600mm的直線(xiàn)段側(cè)設(shè)置一個(gè)支、吊架。當(dāng)彎曲半徑大于300mm時(shí),還應(yīng)在彎通中部增設(shè)一個(gè)支、吊架。支、吊架和橋架安裝必須考慮電纜敷設(shè)彎曲半徑滿(mǎn)足規(guī)范小彎曲半徑。見(jiàn)表3.1.5。

  (1) When laying cable trays horizontally, the support span is generally 1.5-3m. When laying cable trays vertically, the spacing between fixed points should not exceed 2m. When the bending radius of the tray is not greater than 300mm, a support or hanger should be set on the side of the straight section 300-600mm away from the junction of the curved section and the straight section. When the bending radius is greater than 300mm, a support or hanger should be added in the middle of the bend. The installation of supports, hangers, and cable trays must consider that the bending radius of cable laying meets the minimum bending radius specified in the specifications. See Table 3.1.5.

  注為電纜外徑。

  Note the outer diameter of the cable.

  (2)門(mén)型角鋼支架的安裝:梯型橋架沿墻垂直敷設(shè),可使用門(mén)型角鋼支架,支架的固定應(yīng)盡可能配合土建施工預(yù)埋。如圖3.1.5(2-1),也可在土建施工中預(yù)埋開(kāi)角螺栓,用開(kāi)角螺栓固定支架如圖3.1.5(2-1),也可以采用膨脹螺栓固定。

  (2) Installation of door type angle steel bracket: The ladder type bridge is vertically laid along the wall, and door type angle steel bracket can be used. The fixation of the bracket should be embedded as much as possible in conjunction with civil construction. As shown in Figure 3.1.5 (2-1), angle bolts can also be pre embedded in civil construction to fix the bracket as shown in Figure 3.1.5 (2-1), or expansion bolts can be used for fixation.

  圖3.1.5.(2-1) 角鋼支架預(yù)埋安裝

  Figure 3.1.5. (2-1) Pre embedded installation of angle steel bracket

  圖3.1.5.(2-2) 鋼支架預(yù)埋地腳螺栓安裝

  Figure 3.1.5. (2-2) Installation of pre embedded anchor bolts for steel supports

  (3)梯型角鋼支架的安裝:橋架沿墻、柱水平安裝時(shí),托壁需安裝在異型鋼立柱上,而立柱要安裝在梯型角鋼支架上,使柱和墻上的橋架固定支架(或托臂)在同一條直線(xiàn)上。制作見(jiàn)圖和表3.1.5(3)底架與門(mén)型架焊接時(shí),焊角高度5mm。

  (3) Installation of ladder type angle steel bracket: When the bridge is installed horizontally along the wall or column, the support wall needs to be installed on the special-shaped steel column, and the column needs to be installed on the ladder type angle steel bracket, so that the fixed bracket (or support arm) of the column and the bridge on the wall are in the same straight line. When welding the chassis and door frame as shown in Figure 3.1.5 (3), the welding angle height should be 5mm.

  表 3.1.5(3)梯型角鋼支架制作尺寸表(mm)

  Table 3.1.5 (3) Dimensional Table for Manufacturing Ladder Type Angle Steel Supports (mm)

  (4)電纜橋架立柱側(cè)壁式安裝:立柱是直接支承托臂的部件,分工字鋼槽鋼、角鋼、異型鋼立柱;立柱可以在墻上、柱上安裝、也可懸吊在梁板上安裝。做法在混凝土可預(yù)埋鐵件;砌體可砌筑預(yù)制砌塊;也可以采用膨脹螺栓但必須在混凝土強(qiáng)度C20或磚強(qiáng)度在MU10以上的磚砌體上,作法可參照3.1.5(4a、b、c、d、e、f)。

  (4) Side wall installation of cable tray columns: The columns are components that directly support the support arms, and are divided into steel channel steel, angle steel, and special-shaped steel columns; Columns can be installed on walls, columns, or suspended from beams and slabs. The method involves embedding iron components in concrete; Prefabricated masonry blocks can be used for masonry construction; Expansion bolts can also be used, but they must be used on brick masonry with concrete strength C20 or brick strength above MU10. The method can refer to section 3.1.5 (4a, b, c, d, e, f).

  圖3.1.5(4c)異型鋼立柱在墻上側(cè)壁安裝作法之一

  Figure 3.1.5 (4c) One of the installation methods for special-shaped steel columns on the side walls of the wall

  (5)電纜橋架應(yīng)敷設(shè)在易燃易爆氣體管和熱力管道的下方,當(dāng)設(shè)計(jì)無(wú)要求時(shí),與管道的小凈距,符合3.1.5(5)的規(guī)定。

  (5) Cable trays should be laid below flammable and explosive gas pipelines and thermal pipelines. When there are no design requirements, the minimum clear distance from the pipeline should comply with the provisions of 3.1.5 (5).

  表示3.1.5(5)與管道的小凈距

  Indicate the minimum clear distance between 3.1.5 (5) and the pipeline

  6 托臂安裝:

  Installation of Arm 6:

  托臂是直接支承托盤(pán)、梯架單獨(dú)固定的剛性部件,托臂有螺栓固定可預(yù)埋螺栓,也可采用膨脹螺栓,也可卡接,如圖3.1.6(1)、(2)、(3)、(4)、(5)。

  The support arm is a rigid component that directly supports the tray and ladder frame and is fixed separately. The support arm can be fixed with bolts that can be embedded, expansion bolts, or clamped, as shown in Figure 3.1.6 (1), (2), (3), (4), and (5).

  3.2 橋架安裝

  3.2 Bridge installation

  1.直線(xiàn)段鋼制電纜橋架長(zhǎng)度超過(guò)30m,鋁合金或玻璃鋼制電纜橋架長(zhǎng)度超過(guò)15m應(yīng)設(shè)有伸縮節(jié),跨越伸縮縫處設(shè)置補(bǔ)償裝置,可用帶伸縮節(jié)的橋架。

  1. If the length of a straight steel cable tray exceeds 30m, or if the length of an aluminum alloy or fiberglass cable tray exceeds 15m, expansion joints should be installed. Compensation devices should be installed at the expansion joint crossing points, and cable trays with expansion joints can be used.

  2.橋架與支架間螺栓、橋架連接板螺栓緊固無(wú)遺漏,螺母位于橋架外側(cè),當(dāng)鋁合金橋架與鋼支架固定時(shí),有相互間絕緣防電化措施腐蝕措施,一般可墊石棉墊。

  2. The bolts between the bridge and the bracket, as well as the bolts of the bridge connecting plate, are tightened without omission, and the nuts are located on the outside of the bridge. When the aluminum alloy bridge and the steel bracket are fixed, there are mutual insulation and corrosion prevention measures, and asbestos pads can generally be used.

  3.敷設(shè)在豎井內(nèi)和穿越不同防火區(qū)的橋架,應(yīng)按設(shè)計(jì)要求位置,有防火隔離措施,電纜橋架在電氣豎井內(nèi)敷設(shè)可采用角鋼固定,見(jiàn)圖3.1.8。

  3. Cable trays laid in vertical shafts and crossing different fire zones should be located according to design requirements and have fire isolation measures. Cable trays laid in electrical vertical shafts can be fixed with angle steel, as shown in Figure 3.1.8.

  4.電纜橋架在穿過(guò)防火墻及防火樓板時(shí),應(yīng)采取防火隔離措施,防止火災(zāi)沿線(xiàn)路延燃;防火隔離墻、板,應(yīng)配合土建施工預(yù)留洞口,在洞口處預(yù)埋好護(hù)邊角鋼,施工時(shí)根據(jù)電纜敷設(shè)的層數(shù)和根數(shù)用L50×50×5角鋼作固定框,同時(shí)將固定柜焊在護(hù)邊角鋼上;也可以先作好框在土建施工中砌體或澆灌混凝土?xí)r安裝在墻、板中。

  4. When cable trays pass through firewalls and fire-resistant floor slabs, fire-resistant isolation measures should be taken to prevent fires from spreading along the line; Fire isolation walls and panels should be equipped with reserved openings for civil construction, and edge protection angle steel should be pre embedded at the openings. During construction, L50 × 50 × 5 angle steel should be used as a fixed frame according to the number of layers and cables laid, and the fixed cabinet should be welded to the edge protection angle steel; Alternatively, the frame can be installed in the wall or slab during masonry or concrete pouring in civil construction.

  3.3 橋架的接地,當(dāng)設(shè)計(jì)允許利用橋架系統(tǒng)構(gòu)成接地干線(xiàn)回路時(shí),應(yīng)符合下列要求:

  3.3 When the design allows the use of the bridge system to form a grounding main circuit, the grounding of the bridge should meet the following requirements:

  1. 金屬電纜橋架及其支架引入或引出的金屬電纜導(dǎo)管必須接地(PE)或接零(PEN)可靠,且必須符合下列規(guī)范:

  1. Metal cable trays and their brackets must have reliable grounding (PE) or neutral (PEN) for the metal cable conduits introduced or led out, and must comply with the following specifications:

  (1) 金屬電纜橋架及其支架全長(zhǎng),與接地(PE)或接零(PEN)干線(xiàn)相連接不小于2處,使整個(gè)橋架為一個(gè)電氣通路。

  (1) The entire length of the metal cable tray and its support shall be connected to the grounding (PE) or neutral (PEN) main line at no less than 2 points, making the entire tray an electrical pathway.

  (2) 非鍍鋅電纜橋架間連接的兩端跨接銅芯接地線(xiàn),接地線(xiàn)小允許截面積不小于4mm2。

  (2) The two ends of the non galvanized cable tray are connected with copper core grounding wires, and the minimum allowable cross-sectional area of the grounding wire is not less than 4mm2.

  (3) 鍍鋅電纜橋架間連接板的兩端可不跨接接地線(xiàn),但連接板兩端不少于2個(gè)有防松螺帽或防松墊圈的連接固定螺栓。

  (3) The two ends of the connecting plate between galvanized cable trays may not be connected to the grounding wire, but there shall be no less than 2 fixing bolts with anti loosening nuts or anti loosening washers at both ends of the connecting plate.

  2. 盤(pán)、梯架端部之間連接電阻不應(yīng)大于0.00033Ω并應(yīng)用等電位聯(lián)結(jié)測(cè)試儀(導(dǎo)通儀)或微Ω表測(cè)試,測(cè)試應(yīng)在連接點(diǎn)的兩側(cè)進(jìn)行,對(duì)整個(gè)橋架全長(zhǎng)的兩端連接電阻不應(yīng)大于0.5Ω或由設(shè)計(jì)決定,否則應(yīng)增加接地點(diǎn),以滿(mǎn)足要求。接地孔應(yīng)涂層,與涂層接觸的螺栓有一側(cè)的平墊應(yīng)使用帶爪的專(zhuān)用接地墊圈。

  2. The connection resistance between the ends of the tray and ladder should not exceed 0.00033 Ω and should be tested using an equipotential bonding tester (continuity meter) or a micro Ω meter. The test should be conducted on both sides of the connection point, and the connection resistance at both ends of the entire length of the bridge should not exceed 0.5 Ω or be determined by the design. Otherwise, a grounding point should be added to meet the requirements. The grounding hole should eliminate the coating, and the flat pad on one side of the bolt in contact with the coating should use a special grounding washer with claws.

  3. 伸縮縫或軟連接處需采用編織銅線(xiàn)連接。沿橋架全長(zhǎng)另敷設(shè)接地干線(xiàn)時(shí),每段(包括非直線(xiàn)段)托盤(pán)、梯架應(yīng)小有一點(diǎn)與接地干線(xiàn)可靠連接;在接地部位的連接處應(yīng)裝置彈簧墊圈,以免松動(dòng)。

  3. Expansion joints or soft connections should be connected using braided copper wires. When laying a grounding main line along the entire length of the bridge, each section (including non-linear sections) of the tray and ladder should be reliably connected to the grounding main line at a small point; A spring washer should be installed at the connection point of the grounding part to prevent loosening.

  電纜橋架作為布線(xiàn)工程的一個(gè)配套項(xiàng)目,目前尚無(wú)專(zhuān)門(mén)的規(guī)范指導(dǎo),個(gè)生產(chǎn)廠(chǎng)家的規(guī)格程式缺乏通用性,因此,設(shè)計(jì)選型過(guò)程應(yīng)根據(jù)弱電各個(gè)系統(tǒng)纜顯得類(lèi)型、數(shù)量,合理選定適用的橋架。(1)確定方向: 根據(jù)建筑平面布置圖,結(jié)合空調(diào)管線(xiàn)和電氣管線(xiàn)等設(shè)置情況、方便維修,以及電纜路由的疏密來(lái)確定電纜橋架的路由。在室內(nèi),盡可能沿建筑物的墻、柱、梁及樓板架設(shè),如許利用綜合管廊架設(shè)時(shí),則應(yīng)在管道一側(cè)或上方平行架設(shè),并考慮引下線(xiàn)和分支線(xiàn)盡量避免交叉,如無(wú)其它管架借用,則需自設(shè)立(支)柱。

  As a supporting project of wiring engineering, there is currently no specialized specification guidance for cable trays, and the specifications and programs of individual manufacturers lack universality. Therefore, the design and selection process should be based on the type and quantity of cables in various weak current systems, and the appropriate cable tray should be selected reasonably. (1) Determine direction: Determine the optimal route for cable trays based on the building layout plan, combined with the installation of air conditioning and electrical pipelines, convenient maintenance, and the density of cable routing. Indoors, try to install along the walls, columns, beams, and floor slabs of the building as much as possible. When using a comprehensive pipe gallery for installation, parallel installation should be carried out on one side or above the pipeline, and consideration should be given to avoiding crossing of down conductors and branch lines as much as possible. If there are no other pipe racks to borrow, self installing (supporting) columns is required.

  (2)荷載計(jì)算:計(jì)算電纜橋架主干線(xiàn)縱斷面上單位長(zhǎng)度的電纜重量。

  (2) Load calculation: Calculate the weight of cables per unit length on the longitudinal section of the main cable tray.

  (3)確定橋架的寬度:根據(jù)布放電纜條數(shù)、電纜直徑及電纜的間距來(lái)確定電纜橋架的型號(hào)、規(guī)格, 托臂的長(zhǎng)度,支柱的長(zhǎng)度、間距,橋架的寬度和層數(shù)。

  (3) Determine the width of the cable tray: Determine the model and specifications of the cable tray, the length of the support arm, the length and spacing of the pillars, the width and number of layers of the cable tray based on the number of cables laid, the diameter of the cables, and the spacing between the cables.

  (4)確定安裝方式:根據(jù)場(chǎng)所的設(shè)置條件確定橋架的固定方式,選擇懸吊式、直立式、側(cè)壁式或是混合式,連接件和緊固件一般是配套供應(yīng)的,此外,根據(jù)橋架結(jié)構(gòu)選折相應(yīng)的蓋板。

  (4) Determine installation method: Determine the fixing method of the bridge according to the setting conditions of the site, choose suspended, upright, side wall or hybrid, and the connectors and fasteners are generally supplied together. In addition, select the corresponding cover plate according to the structure of the bridge.

  (5)繪出電纜橋架平、剖面圖,局部部位還應(yīng)繪出空間圖,開(kāi)列材料表。

  (5) Draw a plan and section diagram of the cable tray, and also draw a spatial diagram of some parts, and list the material list.

  2、如與電力電纜橋架合用時(shí),應(yīng)將電力電纜和弱電電纜各直一側(cè),中間采用隔板分隔。

  2. When used in conjunction with power cable trays, the power cables and weak current cables should be placed on one side each, and separated by a partition in the middle.

  3、弱電電纜與其它低電壓電纜合用橋架時(shí),應(yīng)嚴(yán)格執(zhí)行選擇具有外屏蔽層的弱電系統(tǒng)的弱電電纜,避免相互間的干擾。

  3. When weak current cables are used in cable trays with other low voltage cables, it is necessary to strictly select weak current cables with external shielding layers to avoid interference between them.

  4、電纜橋架安裝要求

  4. Installation requirements for cable trays

  (1)槽式大跨距電纜橋架由室外進(jìn)入建筑物內(nèi)時(shí),橋架向外的坡度不得小于1/100。(2)電纜橋架與用電設(shè)備交越時(shí),其間的凈距不小于0.5m。

  (1) When the trough type large-span cable tray enters the building from the outside, the outward slope of the tray shall not be less than 1/100. (2) When the cable tray intersects with electrical equipment, the clear distance between them shall not be less than 0.5m.

  (3)兩組電纜橋架在同一高度平行敷設(shè)時(shí),其間凈距不小于0.6m。(4)在平行圖上繪出橋架的路由,要注明橋架起點(diǎn)、終點(diǎn)、拐彎點(diǎn)、分支點(diǎn)及升降點(diǎn)的坐標(biāo)或定位尺寸、標(biāo)高,如能繪制橋架敷設(shè)軸側(cè)圖,則對(duì)材料統(tǒng)計(jì)將更精確。

  (3) When two sets of cable trays are laid in parallel at the same height, the clear distance between them should not be less than 0.6m. (4) When drawing the routing of the tray on a parallel diagram, the coordinates or positioning dimensions and elevations of the starting point, ending point, turning point, branching point, and lifting point of the tray should be indicated. If a cable tray laying axis side diagram can be drawn, the material statistics will be more accurate.

  直線(xiàn)段:注明全長(zhǎng)、橋架層數(shù)、標(biāo)高、型號(hào)及規(guī)格。拐彎點(diǎn)和分支點(diǎn):注明所用轉(zhuǎn)彎接板的型號(hào)及規(guī)格。升降段:注明標(biāo)高變化,也可用局部大樣圖或剖面圖表示。

  Straight line segment: indicate the total length, number of bridge layers, elevation, model, and specifications. Turning and branching points: indicate the model and specifications of the turning joint used. Lifting section: indicate the elevation change, and it can also be represented by local detailed drawings or sectional drawings.

  (5)橋架支撐點(diǎn), 如立柱、托臂或非標(biāo)準(zhǔn)支、構(gòu)架的間距、安裝方式、型號(hào)規(guī)格、標(biāo)高,可同意在平面上列表說(shuō)明,也可分段標(biāo)出用不同的剖面圖、單線(xiàn)圖或大樣圖表示。

  (5) The spacing, installation method, model specifications, and elevation of bridge support points, such as columns, brackets, or non-standard supports and structures, can be listed and explained on the plane, or segmented and marked with different sectional drawings, single line drawings, or detailed drawings.

  (6)電纜引下點(diǎn)位置及引下方式,一般而言,大批電纜引下可用垂直彎接板和垂直引上架,少量電纜引下可用導(dǎo)板或引管,注明引下方式即可。

  (6) Generally speaking, for a large number of cable leads, vertical bending plates and vertical lead frames can be used, while for a small number of cable leads, guide plates or guide pipes can be used, indicating the lead method.

  (7)電纜橋架宜高出地面2.2米以上,橋架頂部距頂棚或其它障礙物不應(yīng)小于0.3米,橋架寬度不宜小于0.1米,橋架內(nèi)橫斷面的填充率不應(yīng)超過(guò)50%。

  (7) The cable tray should be at least 2.2 meters above the ground, and the distance between the top of the tray and the ceiling or other obstacles should not be less than 0.3 meters. The width of the tray should not be less than 0.1 meters, and the filling rate of the cross-section inside the tray should not exceed 50%.

  (8)電纜橋架內(nèi)纜線(xiàn)垂直敷設(shè)時(shí),在纜線(xiàn)的上端和每間隔1.5米處應(yīng)固定在橋架的支架上,水平敷設(shè)時(shí), 在纜線(xiàn)的首、尾、轉(zhuǎn)彎及每間隔3~5米處進(jìn)行固定。

  (8) When the cables are vertically laid in the cable tray, they should be fixed on the brackets of the tray at the upper end and every 1.5 meters. When laid horizontally, they should be fixed at the beginning, end, turn, and every 3-5 meters.

  (9)在吊頂內(nèi)設(shè)置時(shí),槽蓋開(kāi)啟面應(yīng)保持80毫米的垂直凈空,線(xiàn)槽截面利用率不應(yīng)超過(guò)50%。

  (9) When installed in the ceiling, the opening surface of the trough cover should maintain a vertical clearance of 80 millimeters, and the utilization rate of the trough section should not exceed 50%.

  (10)布放在線(xiàn)槽的纜線(xiàn)可以不綁扎,槽內(nèi)纜線(xiàn)應(yīng)順直,槽內(nèi)纜線(xiàn)應(yīng)順直,盡量不交叉,纜線(xiàn)不應(yīng)溢出線(xiàn)槽,在纜線(xiàn)進(jìn)出線(xiàn)槽部位, 轉(zhuǎn)彎處應(yīng)綁扎固定。垂直線(xiàn)槽布放纜線(xiàn)應(yīng)每間隔1.5米固定在纜線(xiàn)支架上。

  (10) The cables laid in the cable trough can be left unbound. The cables inside the trough should be straight and straight, avoiding crossing as much as possible. The cables should not overflow from the trough. They should be tied and fixed at the entrance and exit of the trough, as well as at turns. The cables laid in the vertical cable tray should be fixed on the cable support every 1.5 meters.

  (11)在水平、垂直橋架和垂直線(xiàn)槽中敷設(shè)線(xiàn)時(shí),應(yīng)對(duì)纜線(xiàn)進(jìn)行綁扎。4對(duì)線(xiàn)電纜以24根為束,25對(duì)或以上主干線(xiàn)電纜、光纜及其它信號(hào)電纜應(yīng)根據(jù)纜線(xiàn)的類(lèi)型、纜徑、纜線(xiàn)芯數(shù)分束綁扎。綁扎間距不宜大于1.5米,扣間距應(yīng)均勻,松緊適度。

  (11) When laying wires in horizontal and vertical cable trays and vertical trunking, the cables should be tied. 4-pair cables should be bundled with 24 cables, and 25 or more pairs of backbone cables, optical cables, and other signal cables should be bundled and tied according to the type, diameter, and number of cable cores. The binding spacing should not exceed 1.5 meters, the buckle spacing should be uniform, and the tightness should be moderate.

  (12)橋架水平敷設(shè)時(shí),支撐間距一般為1.5-3m,垂直敷設(shè)時(shí)固定在建筑物構(gòu)體上的間距宜小于2m。

  (12) When laying the bridge horizontally, the support spacing is generally 1.5-3m, and when laying vertically, the spacing fixed on the building structure should be less than 2m.

  電纜橋架型式及品種的選擇及鋪設(shè)規(guī)范

  Selection and laying specifications for cable tray types and varieties

  一、電纜橋架型式及品種的選擇

  1、 Selection of cable tray types and varieties

  1、需屏蔽電氣干擾的電纜網(wǎng)路或有防護(hù)外部(如:有腐蝕液休,易燃粉塵等環(huán)境)影響的要求時(shí),應(yīng)選用(FB)類(lèi)槽式復(fù)合型防腐屏蔽電纜橋架(帶蓋)

  1. When it is required to shield cable networks from electrical interference or to protect against external influences (such as corrosive liquids, flammable dust, etc.), (FB) type slot type composite anti-corrosion shielding cable trays (with covers) should be selected

  2、強(qiáng)腐蝕性環(huán)境應(yīng)采用(F)類(lèi)復(fù)合環(huán)氧樹(shù)脂防腐阻燃型電纜橋架。托臂、支架也要選用同樣材料,提高橋架及附件的使用壽命,電纜橋架。在容易積灰和其它需遮蓋的環(huán)境或戶(hù)外場(chǎng)所宜加蓋板。

  2. For highly corrosive environments, (F) type composite epoxy resin anti-corrosion and flame-retardant cable trays should be used. The same materials should be used for the support arm and bracket to improve the service life of the cable tray and accessories. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover.

  3、除上述情況外,可根據(jù)現(xiàn)場(chǎng)還環(huán)境及技術(shù)要求選用托盤(pán)式、槽式、梯級(jí)式、玻璃防腐阻燃電纜橋架或鋼質(zhì)普通型橋架。在容易積灰和其它需遮蓋的環(huán)境或戶(hù)外場(chǎng)所宜加蓋板。

  3. In addition to the above situations, tray type, trough type, step type, glass anti-corrosion and flame-retardant cable trays or steel ordinary cable trays can be selected according to the on-site environment and technical requirements. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover.

  4、在公共通道或戶(hù)外跨越道路段,底層梯級(jí)的底部宜加墊板或在該段使用托盤(pán) 。大跨距跨越公共通道時(shí),可根據(jù)用戶(hù)要求提高橋架的載荷能力或選用行架。

  4. When crossing public passages or outdoor road sections, it is advisable to add padding or use pallets at the bottom of the lower steps. When crossing public passages with large spans, the load capacity of the bridge frame can be increased or a scaffolding can be selected according to user requirements.

  5、大跨距(>3m)要選用復(fù)合型橋架(FB)。

  5. Composite cable trays (FB) should be selected for large spans (>3m).

  6、戶(hù)外要選用復(fù)合環(huán)氧樹(shù)指橋架(F)。

  6. Choose composite epoxy tree finger bridge (F) for outdoor use.

  二、電纜橋架規(guī)格選擇

  2、 Selection of cable tray specifications

  1、復(fù)合環(huán)氧樹(shù)脂電纜橋架的寬度和高度就按下表選擇,并應(yīng)符合電纜真充率不超過(guò)有關(guān)標(biāo)準(zhǔn)規(guī)范的規(guī)定值,動(dòng)力電纜可取40-50%,控制電纜可取50-70%,另外需予留10-25%的式程發(fā)展余量。

  1. The width and height of the composite epoxy resin cable tray should be selected according to the table below, and should comply with the specified values of the cable true filling rate not exceeding the relevant standard specifications. The power cable can be taken as 40-50%, the control cable can be taken as 50-70%, and an additional 10-25% formula development margin should be reserved.

  2、各種彎通及附件規(guī)格應(yīng)符合工程布置條件并與橋架相配套。

  2. The specifications of various bends and accessories should comply with the engineering layout conditions and be compatible with the bridge frame.

  3、支、吊架規(guī)格的選擇,應(yīng)按橋架規(guī)格、層數(shù)、跨距等條件配置。并應(yīng)滿(mǎn)足荷載的要求。

  3. The selection of support and hanger specifications should be configured according to the specifications, number of layers, span, and other conditions of the bridge frame. And it should meet the requirements of the load.

  4、橋架橫截面積的選擇見(jiàn)表橋架上電纜網(wǎng)絡(luò)中任一線(xiàn)路的自動(dòng)過(guò)電流保護(hù)的額定電流值或整定值(A) 橋架橫截面充許小值(mm2)0-60 12961-100 258101-200 452201-400 645401-600 968

  4. The selection of the cross-sectional area of the cable tray is shown in the table. The rated current value or setting value of the maximum automatic overcurrent protection for any line in the cable network on the cable tray (A). The minimum allowable cross-sectional area of the cable tray (mm2) is 0-60 12961-100 258101-200 452201-400 645401-600 968

  三、對(duì)于電纜橋架的支、吊架的配置

  3、 Configuration of supports and hangers for cable trays

  1、戶(hù)內(nèi)支、吊短跨距一般采取1.5-3m。戶(hù)外立柱中跨距一般采取6m。

  1. The short span of indoor supports and hangers is generally 1.5-3m. The mid span of outdoor columns is generally 6m.

  2、非直線(xiàn)段的支、吊架配置就遵循以下原則。當(dāng)橋架寬度<300mm時(shí),應(yīng)在距非直線(xiàn)段與直線(xiàn)結(jié)合處300-600m的直線(xiàn)段側(cè)設(shè)置一個(gè)支、吊架。當(dāng)橋架寬度>300mm時(shí),除符合下述條件外,在非直線(xiàn)段中部還應(yīng)增設(shè)一個(gè)支、吊架。

  2. The configuration of supports and hangers for non-linear sections follows the following principles. When the width of the bridge is less than 300mm, a support and hanger should be installed on the side of the straight section 300-600m away from the junction of the non-linear section and the straight section. When the width of the bridge is greater than 300mm, in addition to meeting the following conditions, a support or hanger should be added in the middle of the non-linear section.

  3、拉擠玻璃鋼電纜橋架多層設(shè)置時(shí)層間中心距為200,250,300,350mm。

  3. When setting up multiple layers of extruded fiberglass cable trays, the center distance between layers is 200250300350mm.

  4、橋架直線(xiàn)段每隔50m應(yīng)予留伸縮縫20-30mm(金屬橋架)。

  4. Expansion joints of 20-30mm (metal bridge) should be left every 50m in the straight section of the bridge.

  四、防火:要求橋架防火的區(qū)段,必須采用鋼制或不燃、阻燃材料。

  4、 Fire prevention: Steel or non combustible and flame-retardant materials must be used in the sections where bridge frames are required to be fire-resistant.

  五、拉擠玻璃鋼電纜橋架的接地

  5、 Grounding of extruded fiberglass cable tray

  1、橋架系統(tǒng)應(yīng)具有可靠的電氣連接并接地(只對(duì)金屬橋架)。

  1. The cable tray system should have reliable electrical connections and grounding (only for metal cable trays).

  2、當(dāng)允許利用橋架系統(tǒng)構(gòu)成接地干線(xiàn)回路時(shí)應(yīng)符合下列要求。橋架端部之間連接電阻應(yīng)不大于0.00033歐姆,接地孔應(yīng)絕緣涂層。在1KV及以下中性點(diǎn)直接接地系統(tǒng)中,受電設(shè)備的接地與系統(tǒng)中性線(xiàn)接地相連。裝有處動(dòng)切斷供電裝軒時(shí),橋架的級(jí)長(zhǎng)方向金屬橫截面積應(yīng)不小于規(guī)定值。

  2. When it is allowed to use a bridge system to form a grounding main circuit, the following requirements should be met. The connection resistance between the ends of the bridge should not exceed 0.00033 ohms, and the insulation coating should be removed from the grounding hole. In a neutral point direct grounding system of 1KV and below, the grounding of the receiving equipment is connected to the neutral line grounding of the system. When installing a power cut-off device, the cross-sectional area of the metal in the longitudinal direction of the bridge should not be less than the specified value.

  3、沿橋架全長(zhǎng)另敷設(shè)接地干線(xiàn)時(shí),每段(包括非直線(xiàn)段)橋架應(yīng)少有一點(diǎn)與接地干線(xiàn)可靠連接。

  3. When laying a grounding main line along the entire length of the bridge, each section (including non-linear sections) of the bridge should have at least one point reliably connected to the grounding main line.

  4、對(duì)于振動(dòng)場(chǎng)所,在接地部位的連接處應(yīng)裝置彈簧圈。

  4. For vibration sites, spring coils should be installed at the connection of the grounding point.

  六、橋架系統(tǒng)設(shè)計(jì)內(nèi)容:橋架系統(tǒng)工程設(shè)計(jì)應(yīng)與土建、工藝以及有關(guān)密切相配合以確定布置,其設(shè)計(jì)內(nèi)容可含有:

  6、 Bridge system design content: The bridge system engineering design should be closely coordinated with civil engineering, technology, and related disciplines to determine the optimal layout. Its design content may include:

  1、橋架系統(tǒng)的有關(guān)剖面圖。2、橋架系統(tǒng)的平面布置圖。3、橋架系統(tǒng)所需直線(xiàn)段、彎通、支、吊架規(guī)格和數(shù)量的明細(xì)表以及必要的說(shuō)明。4、有特殊要求的非標(biāo)件技術(shù)說(shuō)明或示意圖。

  1. Relevant sectional drawings of the bridge system. 2. Layout plan of the bridge system. 3. A detailed list of specifications and quantities of straight sections, bends, supports, and hangers required for the bridge system, along with necessary explanations. 4. Technical specifications or diagrams for non-standard parts with special requirements.

  七、安裝:電纜橋架的安半夜請(qǐng)參照建筑標(biāo)準(zhǔn)設(shè)計(jì)研究院所發(fā)行的JSJT-121全國(guó)通用建筑標(biāo)準(zhǔn)設(shè)計(jì)-電氣裝置標(biāo)準(zhǔn)圖集《電纜橋架安裝》。

  7、 Installation: For the installation of cable trays, please refer to the JSJT-121 National General Building Standard Design Electrical Equipment Standard Atlas "Cable Tray Installation" issued by the China Building Standards Design and Research Institute.

  八、設(shè)計(jì)要求

  8、 Design requirements

  1、橋架系統(tǒng)的路徑平面布置圖;

  1. Layout plan of the cable tray system path;

  2、橋架系統(tǒng)的有關(guān)斷面圖。

  2. The relevant cross-sectional diagram of the bridge system.

  3、橋架系統(tǒng)所用防腐材質(zhì)及所需直通、彎通、支(吊)架等的規(guī)格和數(shù)量明細(xì)表以及必要的說(shuō)明,連接板及螺絲、防護(hù)帽按以上要求由生產(chǎn)廠(chǎng)家配齊。4、有特殊要求的非標(biāo)準(zhǔn)技術(shù)說(shuō)明或示圖。

  3. The anti-corrosion materials used in the bridge system, as well as the specifications and quantities of the required straight through, bent through, support (suspension) frames, and necessary explanations, shall be detailed. The connecting plates, screws, and protective caps shall be provided by the manufacturer in accordance with the above requirements. 4. Non standard technical specifications or diagrams with special requirements.

  一、電纜橋架型式及品種的選擇

  1、 Selection of cable tray types and varieties

  1、需屏蔽電氣干擾的電纜網(wǎng)路或有防護(hù)外部(如:有腐蝕液休,易燃粉塵等環(huán)境)影響的要求時(shí),應(yīng)選用(FB)類(lèi)槽式復(fù)合型防腐屏蔽電纜橋架(帶蓋)   2、強(qiáng)腐蝕性環(huán)境應(yīng)采用(F)類(lèi)復(fù)合環(huán)氧樹(shù)脂防腐阻燃型電纜橋架。托臂、支架也要選用同樣材料,提高橋架及附件的使用壽命,電纜橋架。在容易積灰和其它需遮蓋的環(huán)境或戶(hù)外場(chǎng)所宜加蓋板?! ?、除上述情況外,可根據(jù)現(xiàn)場(chǎng)還環(huán)境及技術(shù)要求選用托盤(pán)式、槽式、梯級(jí)式、玻璃防腐阻燃電纜橋架或鋼質(zhì)普通型橋架。在容易積灰和其它需遮蓋的環(huán)境或戶(hù)外場(chǎng)所宜加蓋板。  4、在公共通道或戶(hù)外跨越道路段,底層梯級(jí)的底部宜加墊板或在該段使用托盤(pán) 。大跨距跨越公共通道時(shí),可根據(jù)用戶(hù)要求提高橋架的載荷能力或選用行架?! ?、大跨距(>3m)要選用復(fù)合型橋架(FB)。

  1. When it is required to shield cable networks from electrical interference or to protect against external influences (such as corrosive liquids, flammable dust, etc.), (FB) type slot type composite anti-corrosion shielding cable trays (with covers) should be selected. 2. For highly corrosive environments, (F) type composite epoxy resin anti-corrosion and flame-retardant cable trays should be used. The same materials should be used for the support arm and bracket to improve the service life of the cable tray and accessories. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover. 3. In addition to the above situations, tray type, trough type, step type, glass anti-corrosion and flame-retardant cable trays or steel ordinary cable trays can be selected according to the on-site environment and technical requirements. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover. 4. When crossing public passages or outdoor road sections, it is advisable to add padding or use pallets at the bottom of the lower steps. When crossing public passages with large spans, the load capacity of the bridge frame can be increased or a scaffolding can be selected according to user requirements. 5. Composite cable trays (FB) should be selected for large spans (>3m).

  6、戶(hù)外要選用復(fù)合環(huán)氧樹(shù)指橋架(F)。

  6. Choose composite epoxy tree finger bridge (F) for outdoor use.

  二、規(guī)格選擇

  2、 Specification selection

  1、橋架的寬度和高度就按下表選擇,并應(yīng)符合電纜真充率不超過(guò)有關(guān)標(biāo)準(zhǔn)規(guī)范的規(guī)定值,動(dòng)力電纜可取40-50%,控制電纜可取50-70%,另外需予留10-25%的式程發(fā)展余量?! ?、各種彎通及附件規(guī)格應(yīng)符合工程布置條件并與橋架相配套。  3、支、吊架規(guī)格的選擇,應(yīng)按橋架規(guī)格、層數(shù)、跨距等條件配置。并應(yīng)滿(mǎn)足荷載的要求?! ?、橋架橫截面積的選擇見(jiàn)表   橋架上電纜網(wǎng)絡(luò)中任一線(xiàn)路的自動(dòng)過(guò)電流保護(hù)的額定電流值或整定值(A) 橋架橫截面充許小值(mm2)   0-60 129   61-100 258   101-200 452   201-400 645   401-600 968

  1. The width and height of the cable tray should be selected according to the table below, and should comply with the specified values of the cable true filling rate not exceeding the relevant standard specifications. The power cable can be taken as 40-50%, the control cable can be taken as 50-70%, and an additional 10-25% of the formula development margin should be reserved. 2. The specifications of various bends and accessories should comply with the engineering layout conditions and be compatible with the bridge frame. 3. The selection of support and hanger specifications should be configured according to the specifications, number of layers, span, and other conditions of the bridge frame. And it should meet the requirements of the load. 4. The selection of the cross-sectional area of the cable tray is shown in the table. The rated current value or setting value of the maximum automatic overcurrent protection for any line in the cable network on the tray (A). The minimum allowable cross-sectional area of the tray (mm2) is 0-60 129 61-100 258 101-200 452 201-400 645 401-600 968

  三、支、吊架的配置

  3、 Configuration of supports and hangers

  1、戶(hù)內(nèi)支、吊短跨距一般采取1.5-3m。戶(hù)外立柱中跨距一般采取6m。

  1. The short span of indoor supports and hangers is generally 1.5-3m. The mid span of outdoor columns is generally 6m.

  2、非直線(xiàn)段的支、吊架配置就遵循以下原則。當(dāng)橋架寬度<300mm時(shí),應(yīng)在距非直線(xiàn)段與直線(xiàn)結(jié)合處300-600m的直線(xiàn)段側(cè)設(shè)置一個(gè)支、吊架。當(dāng)橋架寬度>300mm時(shí),除符合下述條件外,在非直線(xiàn)段中部還應(yīng)增設(shè)一個(gè)支、吊架。

  2. The configuration of supports and hangers for non-linear sections follows the following principles. When the width of the bridge is less than 300mm, a support and hanger should be installed on the side of the straight section 300-600m away from the junction of the non-linear section and the straight section. When the width of the bridge is greater than 300mm, in addition to meeting the following conditions, a support or hanger should be added in the middle of the non-linear section.

  3、橋架多層設(shè)置時(shí)層間中心距為200,250,300,350mm。

  3. When setting up multiple layers of cable trays, the center distance between layers is 200250300350mm.

  4、橋架直線(xiàn)段每隔50m應(yīng)予留伸縮縫20-30mm(金屬橋架)。

  4. Expansion joints of 20-30mm (metal bridge) should be left every 50m in the straight section of the bridge.

  四、防火

  4、 Fire prevention

  要求橋架防火的區(qū)段,必須采用鋼制或不燃、阻燃材料。我公司生產(chǎn)的BJⅢ系列電纜橋架均為防火橋架。

  The section requiring bridge fire prevention must be made of steel or non combustible and flame-retardant materials. The BJ III series cable trays produced by our company are all fire-resistant trays.

  五、接地

  5、 Grounding

  1、橋架系統(tǒng)應(yīng)具有可靠的電氣連接并接地(只對(duì)金屬橋架)。

  1. The cable tray system should have reliable electrical connections and grounding (only for metal cable trays).

  2、當(dāng)允許利用橋架系統(tǒng)構(gòu)成接地干線(xiàn)回路時(shí)應(yīng)符合下列要求。橋架端部之間連接電阻應(yīng)不大于0.00033歐姆,接地孔應(yīng)絕緣涂層。在1KV及以下中性點(diǎn)直接接地系統(tǒng)中,受電設(shè)備的接地與系統(tǒng)中性線(xiàn)接地相連。裝有處動(dòng)切斷供電裝軒時(shí),橋架的級(jí)長(zhǎng)方向金屬橫截面積應(yīng)不小于規(guī)定值。

  2. When it is allowed to use a bridge system to form a grounding main circuit, the following requirements should be met. The connection resistance between the ends of the bridge should not exceed 0.00033 ohms, and the insulation coating should be removed from the grounding hole. In a neutral point direct grounding system of 1KV and below, the grounding of the receiving equipment is connected to the neutral line grounding of the system. When installing a power cut-off device, the cross-sectional area of the metal in the longitudinal direction of the bridge should not be less than the specified value.

  3、沿橋架全長(zhǎng)另敷設(shè)接地干線(xiàn)時(shí),每段(包括非直線(xiàn)段)橋架應(yīng)少有一點(diǎn)與接地干線(xiàn)可靠連接。

  3. When laying a grounding main line along the entire length of the bridge, each section (including non-linear sections) of the bridge should have at least one point reliably connected to the grounding main line.

  4、對(duì)于振動(dòng)場(chǎng)所,在接地部位的連接處應(yīng)裝置彈簧圈。

  4. For vibration sites, spring coils should be installed at the connection of the grounding point.

  六、橋架系統(tǒng)設(shè)計(jì)內(nèi)容

  6、 Design content of bridge system

  橋架系統(tǒng)工程設(shè)計(jì)應(yīng)與土建、工藝以及有關(guān)密切相配合以確定布置,其設(shè)計(jì)內(nèi)容可含有:

  The design of bridge system engineering should be closely coordinated with civil engineering, technology, and relevant disciplines to determine the optimal layout, and its design content may include:

  1、橋架系統(tǒng)的有關(guān)剖面圖。

  1. Relevant sectional drawings of the bridge system.

  2、橋架系統(tǒng)的平面布置圖。

  2. Layout plan of the bridge system.

  3、橋架系統(tǒng)所需直線(xiàn)段、彎通、支、吊架規(guī)格和數(shù)量的明細(xì)表以及必要的說(shuō)明。

  3. A detailed list of specifications and quantities of straight sections, bends, supports, and hangers required for the bridge system, along with necessary explanations.

  4、有特殊要求的非標(biāo)件技術(shù)說(shuō)明或示意圖。

  4. Technical specifications or diagrams for non-standard parts with special requirements.

  七、安裝

  7、 Installation

  電纜橋架的安半夜請(qǐng)參照建筑標(biāo)準(zhǔn)設(shè)計(jì)研究院所發(fā)行的JSJT-121全國(guó)通用建筑標(biāo)準(zhǔn)設(shè)計(jì)-電氣裝置標(biāo)準(zhǔn)圖集《電纜橋架安裝》04D701-3。

  For the installation of cable trays, please refer to the JSJT-121 National General Building Standard Design Electrical Equipment Standard Atlas "Cable Tray Installation" 04D701-3 issued by the China Building Standards Design and Research Institute.

  八、設(shè)計(jì)要求

  8、 Design requirements

  1、橋架系統(tǒng)的路徑平面布置圖;

  1. Layout plan of the cable tray system path;

  2、橋架系統(tǒng)的有關(guān)斷面圖。

  2. The relevant cross-sectional diagram of the bridge system.

  3、橋架系統(tǒng)所用防腐材質(zhì)及所需直通、彎通、支(吊)架等的規(guī)格和數(shù)量明細(xì)表以及必要的說(shuō)明,連接板及螺絲、防護(hù)帽按以上要求由生產(chǎn)廠(chǎng)家配齊。

  3. The anti-corrosion materials used in the bridge system, as well as the specifications and quantities of the required straight through, bent through, support (suspension) frames, and necessary explanations, shall be detailed. The connecting plates, screws, and protective caps shall be provided by the manufacturer in accordance with the above requirements.

  4、有特殊要求的非標(biāo)準(zhǔn)技術(shù)說(shuō)明或示圖。

  4. Non standard technical specifications or diagrams with special requirements.

  本文由 濟(jì)南電纜橋架  友情奉獻(xiàn).更多有關(guān)的知識(shí)請(qǐng)點(diǎn)擊  http://www.chenchen1688.com/  真誠(chéng)的態(tài)度.為您提供為的服務(wù).更多有關(guān)的知識(shí)我們將會(huì)陸續(xù)向大家奉獻(xiàn).敬請(qǐng)期待

  This article is a friendly contribution from Jinan Cable Bridge For more related knowledge, please click http://www.chenchen1688.com/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Stay tuned

上一篇:濟(jì)南電纜橋架安裝施工要求及規(guī)范
下一篇:濟(jì)南電纜橋架到底需不需要跨接
 
qq
售前咨詢(xún)熱線(xiàn)
15168870138
售后咨詢(xún)熱線(xiàn)
13465410318
国产精品无码综合| 中文字幕人妻一区二区在线视频| 亚洲精品伊人| 欧美天堂久久| caopornx在线超碰免费| 国产一区二区精品在线| 午夜天堂精品久久久久91| 免费久久久| 亚洲综合无码一区二区毛片| 人人干人人爽| 边吃奶边被躁欧美三级| 麻豆AV一区二区三区| 一区二区三区高清| 国精品| 国产精品白浆一区二小说| 日本色婷婷| 少妇高潮潮喷到猛进猛出小说| 三ji片区电影| 91精品国产综合久久久不卡电影| 中文字幕日本理论片19| 国产在线麻豆| 五月激情丁香| 久久日本精品在线热| 国精产品明星ai换脸免费| 欧美三级一区二区三区| 婷婷四色| 丁香五月香婷婷五月| 六月丁香 五月婷婷小说| 亚洲一区久久久| 簧片在线| 久久久www| 暖暖 视频 高清 日本 在线1| 66亚洲一卡2卡3卡四卡新区| 国产精品99久久久久久噜噜| 亚洲午夜精品成人A片在线观看| 日韩精品综合| 亚洲精品嫩草AV在线观看| 国精产品99永久中国有限公司| 亚洲色婷成人综合电影在线| av超碰在线| 超碰100| 美足下的激 18p| 日本黄网| 色伊人网| 麻豆传煤官网APP免费网站在线| 蜜臀AV久久国产午夜福利软件 | 久艹在线视频| 欧美性老妇| 久久怡红院| 最近中文2019字幕第二页| 激情五月开心婷婷深爱| 亚洲黄色小说图片| 国产午夜无码视频在线观看| 唐朝资源网| 男女亲热| 无码视频一二三| 国产国语亲子伦亲子| 久久66热人妻偷产国产| 久久久久97高清毛片视频| 精品色999| 国产美女被遭强高潮免费网站 | 中文字幕乱码在线播放| 日本一本视频| 中国熟妇色| 亚洲一区欧美二区| 九九热国产视频| 桃花直播在线观看免费播放 | 最近中文2019字幕第二页 | 欧美性xxxxx极品少妇| 久久99视频| 中国老女人操逼视频| 韩国AV在线播放| 国产精品国内自产拍视频| 色成人免费网站| eeuss国产一区二区三区| 少妇饥渴偷公乱第32章| 日韩视频在线观看| 色的综合| 欧美精品A| www.日韩无码| 欧美激情视频在线免费观看| 中文字幕亚洲激情| 麻豆影视视频高清在线观看| 人妻夜夜爽爽88888视频| 韩日免费视频| 日老熟妇| 欧美劲爆婷婷五月久久| 人人妻人人澡人人妻人人爱| 国产精品女A片爽爽免费按摩| 精品人妻伦一二三区久久春菊| 久操人妻| 少妇高潮无遮挡毛片免费播放| 免费看b网站| 亚洲成人一区| 尤物视频最新网址| 日韩系列| 亚洲乱码一卡2卡3卡四卡| 亚洲 美腿 欧美 偷拍| 91丨国产丨熟女| 欧美日韩激情视频| 老熟妇仑乱视频一区二区| 国产黄色高清| 最近免费中文字幕MV在线电影| 免费在线观看黄片| 2023国产精品| 九九综合九九| 日韩影院一区二区| 中国少妇AV| 18款禁用黄台网站入口葫芦娃| 少妇特黄A片一区二区三区免费看| 久久久久久久一线毛片| 色在线播放| 欧美偷拍| 美国AV免费看| 久久久亚洲一区二区三区| 蜜桃视频成人A片免费观看| 爆操老熟女| 免费一区二区| 少妇91| 亚洲 欧美 日韩 在线| 丁香成人社| 精品乱码一区内射人妻无码| 久久久久免费视频| 中文字幕亚洲激情| 平民影院| 香港三日本三级少妇99| 国产在线不卡AV| 中文在线中文资源| 99久久精品久久亚洲精品| 影音先锋2018最新资源| 成人特级毛片| 精品欧美一区二区久久久| 国产精品人人爽人人做我的可爱| 最新黄色AV| 泷泽萝拉种子内涵图| 久久青青草原| 91久久久久无码精品国产| 熟女av网站| 色久视频| 天堂亚洲欧美日韩一区二区| 国产免费高清| 国产福利在 线观看视频| 国产精品99久久久久久大便| 中文字幕免费视频| 欧美精品一区二区三区日韩免费| 亚洲成人黄色在线| 国产微拍精品一区| 国产精品久久久久久免费| 影音先锋av色咪影院| 国产av一二三| 狠狠狠地啪香蕉| 美女久久久久久久| 久久66热人妻偷产国产| 欧美国产大片| 一本到无线中字| 色色婷婷五月天| 亚洲色欲国产免费视频| 超级碰碰碰| 日本AAAA特级毛片| 国产一级黄色网| 日产AAAAA| 精品国产视频| 媒豆传媒免费视频入口网站| 香蕉av网站| 中文精品无码中文字幕无码专区| 亚洲日韩精品AV中文字幕| 国产黑丝在线观看| avtt天堂网| 亚洲福利在线播放| 蜜臀AV国产精品久久久久| 日韩色情AV综合自拍一区 | 午夜成人无码精品福利| 777影院秋霞成人午夜电影免费| 少妇无套内谢太紧了视频| 尤物视频网| 无码乱人伦一区二区亚洲| 国产欧美视频在线播放| 国产AV人人妻人人爽| 公侵犯人妻一区二区三区| 精品免费看一区二区三区A片| 电影91久久久| 国产无遮挡| 92国产精品| 女人与牲囗牲恔视频免费| 国产精品ww| 亚洲AV久久久精品麻豆| 久久伊人综合网| 秋葵加油站APP下载地址入口| 国产无码影片| 最近中文字幕在线MV免费| 中文字幕一区二区三三| 久久日产一线二线SU| 国产精品午夜影院| 欧美综合自拍亚洲综合图| 久久久精品中文无码| 久久66热人妻偷产国产| 无码天堂网| 色人阁26uuu| 国产成人精品久久| 日本免费精品视频| 性夜夜春夜夜爽A片欧美| 牛夜精品久久久久久久99黑人| 亚洲精品综合在线影院| 精选久久久| 神马电影院午夜神福利不卡| 欧美高清二区| 色综合久久88色综合天天免费| 女女女女bbbbbb毛片在线| 少妇疯狂做爰白浆| 欧美高清一区| 国产高清不卡一区| 麻豆精产国品一二三产| 黄色在线无码| 久久大胆人体艺术| 丁香五月情| 国产欧美一区二区三区另类精品| 国产AV国片精品一区二区| 久久久男人的天堂| 无码人妻精品一二三区免费百度| 人妻超级精品碰碰在线97视频| 粉嫩在线| 欧美亚洲高清国产| 久久久久亚洲AV片无码下载蜜桃| 国产97在线观看| 暖暖视频在线观看免费国语 | 国产亚洲精品久久精品6| 国产91色| 91精品少妇高潮一区二区| 国精产自导拍| 亚洲开心网| 97超级碰| 亚洲地址一地址二地址三| 日韩精品美女| 青青久在线视观看视| 轻轻色在线观看| 天堂AV资源网| 艳妇乳肉豪妇荡乳A片色戒| 国产大片一区二区三区| 丁香五月综合缴情电影| 久久精品一区二区国产| 波多野结衣99| 拔擦拔擦8X高清在线永久域名| 一二三四高清无码| 亚洲男人的天堂在线| 老女人grαnnychinese| 亚洲精品热| 久久无码不卡| 亚洲精品久久久激情综合| 国产少妇Av| 亚洲AV又黄又爽超级A片软件| 日韩电影二区| 91popny丨九色丨国产| 人妻无码AV久久一二三区| 亚洲综合在线第一页| 亚洲色婷成人综合电影在线| 国产麻豆精品| 视频一区二区三区激情| 久久骚| 久久久久久久国产精品| 国产av一二三| 香港三日本三级少妇99| 麻豆京东传媒精品2021| 日本激情视频网站| 午夜超碰| 麻豆成人AV久久无码精品| 免费人妻视频| 婷婷综合一区| 999久久欧美人妻一区二区| 无码午夜福利| 制服.丝袜.亚洲.中文.综合| AV天堂午夜精品一区二区三区| 日本超碰| 欧美日韩一区二区三区不卡视频| 人妻熟女少妇一区二区三区 | 五月婷婷激情第四季| 久久成人精品| 91香蕉网| 色偷偷91| 久草香蕉依人在线| 玖玖精品| 欧洲无码在线| 久久色精品| 精品一区二区三区AV天堂| www.欧美| 精品蜜桃一区二区| 日韩免费三级| 色天天爱天天狠天天透| 日韩无码精品久久| 精品人妻一区二区三区蜜桃视频| 懂色a v| 大地二资源网高清免费播放小说 | 成全电影在线| 色接久久| 一区二区三区熟女| 日本成人黄色电影网站| 久久青草在线视频精品| 91精品久久久久久久| 91亚洲国产成人精品一区二三| 2018Av天堂在线视频精品观看| 免费在线观看无码| 欧美成人精品三级网站| 精品国产黄| 国产精品日本不卡一区二区| 人妻第一页| 国产高清无码网站| 女人又爽又黄| 中文字幕AV久久一区二区| 欧美日韩中文字幕在线视频| 亚洲一二三四五| 99精品福利视频| 在线观看成人AV三级| 成人精品国产亚洲AV久久| 少妇x88AV| 女厕一区二区三区视频| 天天干天天色综合| 亚洲免费网| 丁香五月欧美| 亚洲一区二区乱码| 久久视频成人黄色| 亚洲AV久久无码精品影视| 久久视频这里只精品99re8久| 91在线视频国产| 国产免费福利| 大桥未久qvod| 婷婷五月花| 伊人黄色电影| 在线观看黄色av| 国产97在线视频| 国产精品久久在线| 99热这里有精品| 青青青国产精品免费观看| 国产日韩精品一区二区三区| jizz无码| 欧美激情熟女| 久久日精品| 99精产国品一二三产品香蕉| 中文字幕亚洲欧美日韩| 欧美一区二区三区精品| www.秋霞| 久久乐国产精品| 女同在线观看| 国产精品成熟老女人视频| 中文字幕久久久| 无码人妻一区二区三区免费N鬼沢| 日本性欧美| 久久久国产精| 日本美女被操视频| 日韩人妻精品久久日| 浪货撅高贱屁股求主人调教视频 | 日韩无码综合| 伦理av在线观看| 黄色小说在线免费| 日本一二三不卡视频| 超在线观看免费视频| 国产精品女A片爽爽波多洁衣 | 亚洲AV无码一区二区三区DV| 久久这里只有精品6| 一区二区免费在线观看| 欧美亚洲高清国产| 国产第1页| 最近更新中文字幕在线2018二| 国产精品96久久久久久| 懂色AV一二三三区免费| 91亚洲综合| 91麻豆精品国产91久久久熟女| 一本色道久久爱88AV| www.亚洲555久久久| 超碰人妻97| 国产精品无码88aⅴ| 亚洲午夜成人电影| 韩国无码在线播放| 亚洲操逼大片| 中文字日产幕乱五区| 肉大捧一进一出免费视频| 一本色道久久HEZYO无码| 日韩欧美熟妇| 亚洲精品欧美日韩| 国产黄色电影一区| 嗯啊灬啊灬灬欧美视频| 亚洲三级精品| 国产一级二级视频| 99久久久无码国产精品6| 丁香四房播播| porn在线视频一区二区| 在线おっさんとわたし天堂| 成人污污污www免费网站| 欧美日韩人妻中文字幕综合 | 丝瓜草莓向日葵秋葵加油站| 国产第四页| а√天堂中文在线资源8| 一本一道人妻久久一区二区三区| 午夜福利高清| 欧洲精品久久一区二区| 色婷婷aⅴ| а√天堂8资源中文在线| 67194成人手机在线| 色五月第一门户| 久久丝袜| 国产福利91精品一区二区三区| 久久久午夜精品| 国产熟女一区| 国产农村妇女精品一二区| 亚洲精品国产成人AV在线| av不卡在线免费观看| 欧美成人极品| 日本高清无码一区二区| 午夜亚洲精品| 日韩一级片免费看| 日本黄色录象| 久久精品视频7| 插逼逼网站| 成人片一区| 亚洲在线不卡| 亚洲av官网| 欧美日韩国产性爱| 亚洲小说欧美激情另类| av小说天堂网| 伊人五月丁香| 91人人| 久久AV一区黑人AV一区| 91AV久久| 亚洲一区二区三区久久久| 无码专区中文字幕| 亚洲黄色成人网站| 日韩一区红码| 国产精品999久久久| 亚洲国产毛片| 国产在线久| 香蕉一区二区| 欧美激情一区二区三级高清视频 | 国产精品宅男擼66M3U8| 丁香五月情| 99精产国品一二三产品香蕉| 中韩高清无专码区2021曰 | 久久日韩精品| 国产亚洲天堂| 欧美a黄片| 亚洲AV无码成人WWW| 高清欧美性猛交| 国产伦精品一区二区三区免费观看| 亚洲少妇一区二区三区| 国产精品久久久久久白浆色欲| 乱码一区二区三区四区| 免费69国产精品成人无码视频| 欧美性受XXX黑人性爽XYX| 国产欧美小视频| 99riAv1国产精品视频| 日日射视频| 久久精品日韩无码| 美女免费av| 一起草在线看| 国产免费性爱视频| 蜜桃久久精品| 久久激情网| 国产三级网站| 野花香视频在线观看最新| 麻豆精品传媒2021网站下载| 麻豆传煤网站APP入口免费 | 一个人看的在线观看视频最新| 97国产精品视频在线观看| 影音先锋2018最新资源| 最近更新中文字幕在线2018二| 亚洲成AV人片一区二区三区| 国产AV一区二区三区最新精品| 日本综合久久| 麻豆WWW传媒入口| 掀开奶罩边躁狠狠躁转学生H| 亚洲成片1卡2卡三卡4卡乱码| 边吃奶边被躁欧美三级| 免费观看正能量视频在线观看| japanesefree 日本| 亚洲欧美中文字幕高清在线| 免费无毒a网站在线观看| 拔擦拔擦X8X8华人免费 | 日本一区二区精品视频| 91人妻网| 日本天堂在线视频| 蜜臀av夜夜澡人人爽人人| 四虎影院最新地址| 伊人精品影院一本到综合| 色情五月天色婷婷| 国产精品专区第1页| 久操综合在线| 成人精品三级AV在线看| 午夜成人精品一区二三区免费看| 99re在线视频观看| 午夜精品99| 黄色av免费在线| 欧美日韩精| 久热爱精品视频线路一| 亚洲成成品网站源码有限公司51| 精品 在线 视频 亚洲小说| 无套内内射视频网站| 丁香婷婷综合激情五月色| 最近免费字幕中文大全| 麻豆999| 亚洲美女精品| 国产无码AV一区| 综合网久久| MD传媒视频在线入口| JK成人福利视频网站在线观看| 大地资源二中文在线观看官网最新| 丁香五月综合缴情电影| 天天干天天色| 99久久精品无码一区二区麻豆| 中文有码在线观看| 国产91综合一区在线观看| 国产精品欧美性爱| 五月开心播播网| 性欧美videos高清hd4k| 国产青草视频| 国产69熟妇视频天美| 激情中文字幕| 久久久久| 拔擦拔擦8X高清在线永久域名| 国产亚洲一区二区在线观看| 日韩精品一线二线三线| 亚洲自拍偷拍欧美| 超碰人妻97| 人人爽人人爽| 大地资源影视中文二页| 久久久a| 国产精品人人妻人人爽| 亚洲熟妇AV在线观看| www.四虎在线观看| 国产精品久久久久久影视| 色情五月天色婷婷| 日韩AV午夜| 亚洲一区国产一区| 久久99精品久久久久久园产越南| 亚洲成人AV片| 久草丁香| 亚洲一区二区三区成人| 国产精品久久久久久久免费| 国产精品无码人妻无码色情多人| 亚洲AV无码国产精品二区| 天天夜碰日日摸日日澡性色AV| 99RE6这里有精品热视频| 电视剧吕梁英雄传| 99久久久无码国产精品性出奶| 91国偷自产一区二区三区观看| 精品无码高清视频| 国产AV国片精品| 蜜桃AV亚洲第一区二区| 国产精品久久久久久人妻黑料| 99久久久国产精品无码网爆 | 国产AV一区二区三区日韩| 亚洲中文字幕久久无码一区| 亚州综合视频| 丁香五月开心婷婷| 成全电影大全在线观看高清版| 天堂AV亚洲AV一二三区| 国产精品露脸视频| 人妻av无码一区二区三区| 91麻豆精品| 国产精品人妻久久久999| 中文Av一区| 天天操天天操天天操天天| 熟妇人妻中文字幕无码老熟妇| 韩国精品AV一区二区三区| 人妻被粗大猛进猛出69国产| 日韩精品H| 不卡中文| 日本少妇内射| 国产麻豆精品传媒AV在线观看| 国产3P在线播放| 97人妻少妇偷人精品无码| 97人人爽| 亚洲AV无码一区二区三区乱子伦| 亚洲综合无码在线| 无码久久精品| 麻豆视传媒官方短视频网站| 久热国产精品视频一区二区三区 | 国产在线无码精品| 懂色AV一区二区三区| 国产成人在线视频| 99热只有这里有精品| 中文字幕人妻精品| 国产一区二区三区欧美| vidaa性欧美| 色欲av中文字幕| 日本高清WWW免费视频| 少妇伊人| 97色伦久久视频在观看| 日韩AV三区| 蜜臀av性久久久久蜜臀aⅴ| 麻豆传煤网站入口直接进入不用| 一本大道高清香蕉中文大在线| www.国产二区| 国产精品久久av| 日本一卡2卡3卡4卡无卡免费网站| 欧美性爱zoo| 久久久夜夜| 亚洲国产成人A片乱码| 国产欧美一区二区在线观看| 高清无码不卡在线观看| 欧美亚洲小说| 国产二级一片内射视频播放午夜福利免费体检区 | 亚洲天堂美女| 麻豆国产MV视频| 麻豆传媒影院| 国产成人免费视频| 久久久久久久一线毛片| 亚洲精品一区二区巨| 成人在线综合| 一本到无线中字| 国产逼逼| 999久久久成人A片精品免费看 | 中文字幕h| 欧美日韩综合| 葵千惠无码人妻一区二区| 少妇无码无套av一区| 国产亚洲AV片天天在线观看| 大地资源中文在线观看免费| 日本夫妻性生活视频| 精品无码一二三区| 热久久视久久精品2019| 午夜伦理视频| 你懂的视频| 麻豆视传媒黄短视频| 人人鲁人人操| 暖暖视频在线观看高清播放| 91欧美大片| 久久久久亚洲AV无码尤物黑人| 最近2018中文字幕大全免费| 国产乱一区二区三区夜爽 | 香蕉秋葵视频免费看小猪| 日欧内射| 国产乱码精品一区二区三| 久久久九色综合亚洲成色777| 成人av手机在线| 日本人妻少妇| 亚洲区久久| 欧美日韩3p| 激情综合五月亚洲婷婷| 成人乱人乱一区二区三区| 日本久久久久| 黄片.com| 亚洲精品乱码久久久久久蜜桃图片 | 日本免费不卡视频| 免费日韩av| 亚洲熟妇综合久久久久久| 久久久精品中文无码| 欧美三级在线播放线观看| 亚洲视频偷拍| 久久久久亚洲AV成人片| 久久99AV无色码人妻蜜| 91日韩视频| xfyy222每日稳定资源站姿| 成人无码免费福利视频| 人妻无码久久久| 久久视频这里有精品63| 激情天堂| 亚洲成成品网站源码中国有限| 手机AV免费看| 欧美乱伦熟女| 午夜毛片免费| 亚洲欧美日韩精品在线| 久久播电影| 中字幕人妻一区二区三区| 丁香五月天的最新地址| 美女张开双腿让男人捅| 午夜人妻| 午夜免费网站| 久久精品国产77777蜜臀| 国产精品第八页| 亚洲欧美综合精品久久成人| 大地影院大全在线观看| 国产黄片免费| 中国文字幕在线播放2018| 97午夜福利视频| 丰满岳乱妇一区二区三区| AV在线手机| 久久久久久黄片| 亚洲人精品| 人人精品| 思思久久99| 国产精品久久久久久久一区二区| 久久免费黄色| 在线无码免费视频| JLZZJLZZ亚洲女人18| 人人操人人操人人| 亚洲激情图片区| 人人操av| 亚洲+小说+欧美+激情+另类| 国产午夜精品久久久| 99久久无码| 久久激情五月| 国产伦精品一区二区三区三免费| 69精品人人人人人人人人人| 日本免费一区二区三区最新vr| 中文字幕精品久久| 久久视频在线视频观看天天看| 星空无限mv国产剧入选精彩电影| 亚洲AV永久无码麻豆A片| 牛夜精品久久久久久久99黑人| 99热这里只有精品免费| 天天日天天摸天天操| 国产熟女一区二区三区五月婷| 爆操人妻| 欧美黄片一区二区| 又大又粗又爽视频| 中文区中文字幕免费看| 精品日韩一区二区| 最好看的中文字幕MV电影| 成人手机视频| 强摸秘书人妻大乳BD| 呦呦国产| 国产欧美一区二区三区免费视频 | 午夜在线小电影| 日韩一品二品三品| 亚洲AV无码乱码精品护士岛国| 精选国产AV精选一区二区三区| 懂色aⅴ精品一区二区三区| 久久九九免费看少妇高潮A片 | 久久99精品久久久久婷婷| 给我免费播放片在线中国| 亚洲天堂一区在线| 欧美日韩在99线| 久久亚洲私人国产精品| 另类视频在线| AV亚洲产国偷V产偷V自拍AV| 麻豆传媒免费观看| 2020亚洲日产| 国产成人无码精品久久二区三| 国产婷婷色综合AV蜜臀AV| 黑人巨大精品欧美一区二区一视频| 麻豆安全免费网址入口| 国产欧美成人一区二区A片| 大地资源二中文在线影视观看| 精产国品一二三区| 丝袜毛片| 日韩AV综合网| 欧美大屁股流白浆xxxx视频| YY在线观看视频| 久久精品国产亚洲AV无码四区| 最近2018中文字幕视频免费看| 亚洲国产综合一区| 麻豆视传媒短视频网站-入口2021仙踪林免费 | 日日噜噜噜噜久久久精品毛片| www.日本av| 91精选国产| 久久网亚洲| 丁香六月激情| 水蜜桃蜜桃在线观看| 500部大龄熟女| 你懂的网址在线观看| 日韩中文无码AV| 最近最好看的2018中文字幕国语| 伊人久久大香色综合| 亚洲无码第三页| 免费撕开奶罩揉吮奶头A片视频| 日本三级伦色情在线播放| 免费AV黄片| 久草草在线视视频| 成人AV在线播放| 色婷婷色| 欧美熟妇激情| 四平青年全集完整版| 亚洲精品久久YY5099| 午夜dv内射一区二区| 亚洲精品久久| 好看AV中文字幕在线观看| 国产91熟女高潮一区二区| 麻豆七夕视频国产| 无人区乱码一二三四| 亚洲天堂午夜| www.蜜桃视频| 国产无码视屏| 2020国自产拍精品天天更新| 浮力最新院址wy97| 动漫涩涩免费网站在线看| 性欧美潮喷水口乱喷| 粗大的内捧猛烈进出A片黄| 中文字幕日本在线观看| 毛片av网址| 日本一区二区三区视频在线| 亚洲国产日韩一区二区A片| 巨爆乳少妇无码一区二区毛片| 久久国产AVJUST麻豆| 麻豆短视频传媒网站| 天天综合网天天综合色| 国产69精品久久久久久久| 久久日韩在线| 日韩精品一区二区在线| 久久AV无码精品人妻系列试探| 亚州精品久久久久久久久| 大香蕉av电影| 久久9999| 精品久久福利| 国产精品羞羞无码久久久| 大地影院高清官网在线观看| 国产精品国产三级国产AV麻豆| 色爱天堂| 欧美成人久久一区二区| 91亚洲精品乱码久久久久久蜜桃 | 亚洲精品无码高潮喷水A片小说| 91在线一区| 国产无套内射普通话对白| 麻豆传煤官网APP入口在线网站| caoporn成人免费视频| 蜜桃AV亚洲第一区二区| 暖暖直播免费观看韩国大全| 亚洲人成无码网站| 精品国产AV色一区二区深夜久久| 久久激情视频| 国产成人精品aⅴ无码毛片老师| 暖暖 免费 高清 日本中文在线视频免费观看 | 99热在这里只有免费精品| 一本色道久久综合无码欧美| 激情婷婷丁香五月色综合| 中文字幕日韩精品人妻| 天天综合av| 99视频这里只有精品国产| 久久久久噜噜噜亚洲熟女综合| 久久乐播| 欧美日韩性爱在线| 国产97人妻人人做人碰人人爽| avtt香蕉久久| 国产无码小电影| 国产AV亚洲一区精午夜麻豆| bxbxbxbx性老熟妇xxx| 日韩美女一区二区三区| 国产丰满人妻AV| 丝瓜草莓向日葵秋葵加油站| 久久九色| 日产精品一区| 黑人一区| 色欲AV在线观看国产精品| 少妇又色又紧又爽又刺激视频| 无码视频大全| 西西美女裸体艺术337p| 亚洲精品国产a久久久久久| 亚洲少妇精品| 制服丝袜天堂网| 午夜福利不卡在线视频| 国产人成视频| 亚洲国产精品免费| 全黄AV| 欧美日本中文字幕| 一日本道伊人久久综合影| 欧美日韩一区二区电影| 精品一区二区不卡| 亚洲A片无码一区二区三区公司| 一区二区三区亚洲| 超碰在线| 日韩www视频| 日本偷偷操| 久在草视频| 色欲人妻AV久久无码精品| 伊人久久久久久久久久| 一区二区免费视频| 91国自产精品| 强摸秘书人妻大乳BD| 久久精品国产精品成人片 | 无码后入| 精品美女久久| 色婷婷aV一区二区三区麻豆综合| 香焦视频在线观看黄| 欧美日韩精品一区二区| 一区三区视频| 国产人妻一区| 国产91精品人妻麻豆水多多| 少妇免费直播| 熟妇~x88av| 亚洲日本久久| 黄片黄瓜视频| 亚洲激情三级片| 三级片久久久久| 国产又黄又爽又刺激的免费网址| 成人女同av在线观看| 看黄片链接| 国产精品免费视频色无码| 亚洲AV久久久精品麻豆| 车里扒开奶罩揉吮奶头免费A片| 日本免费在线视频| 国产美女被高潮免费网站| 人人操操人人| 轻轻色| 欲求不満な人妻は毎晩隣人に| 免费+国产+无码| 国产AV久| 午夜伦理福利| 日韩tv| 午夜超碰| 国产一区2区| 国产精品久久久久久久久齐齐 | 777影院秋霞成人午夜电影免费| 琪琪视频在线观看| 狠狠人妻久久久久久综合| 精品人妻人人| 国产精品热| 婷婷国产天堂久久综合| 播五月开心婷婷欧美综合| 亚洲欧美中文字幕高清在线| 久久久久久亚洲| 女同一区二区| 熟女国产精品| 天天久久久| 精品一区二区无码| 17c人妻无码一区二区三区| 在线中文在线| 色YEYE在线视频观看网站| 欧美日韩黄色电影| 欧美日韩视频一区二区| 国产精品视频| 欧美啪啪啪视频| 国产一级二级视频| 国产成人免费在线视频| 国语激情对白 VIDEOS| 亚洲精品久久久激情综合| 国产精品9999| 久久久精品毛片| 啪啪国产| 亚洲综合一区在线| 无码一区视频| 人妻精品久久久久麻豆| 午夜成人小说| 久热国产精品视频一区二区三区| 欧洲一卡2卡3卡4卡免费观看| 91精品区| 亚洲国产精品一区二区成人片国内| 黄色免费无码视频| 亚洲无码电影网| 亚洲av线| 在线内射| 蜜臀在线观看| 欧美一区二区人妻A片五月色| 欧美美女自慰网站| 国产又粗又猛| 91精品视频网站| 色欲久久综合亚洲精品蜜桃| 麻豆文化传媒网站官网免费| 国产精品视频免费观看| 欧美二级黄片| av日韩精品| 亚洲小黄片| 久久精品aⅴ无码中文字字幕重口| 国产精品久久AV无码| 丰满少妇高潮久久三区| 盗墓笔记第二季| 人妻黄色片| 大香蕉com| 喷水网站| 91热在线| 欧美视频不卡| 破多野结衣| 99精品电影一区二区免费看| 香蕉www.5.app网页在线| 麻豆文化传媒免费网站| 人妻一区二区三区| 青青草国产精品| 亚洲一级无码| 国产永久AV| 人妻中文字幕视频| 97人妻天天摸天天爽天天| 亚洲我射| 亚洲激情视频在线观看| 丁香五月激情婷婷| 老熟妇色| 国产午夜无码视频在线观看| 国产二级一片内射视频播放午夜福利免费体检区| 久久久91精品国产一区二区| 久久无码人妻精品一区二区三区| 四虎影视在线观看| 国产黄片在线播放| 国产人久久人人人人爽| 精品免费在线观看| aV在线亚洲天堂| 国产精品扒开腿做爽爽| 色xxx| 天天射日日射| 亚洲天堂高清无码| 亚洲无码在线不卡| 中文字幕亚洲国产| 色婷婷色| 草久影院| 无码黄色网址| 亚洲一区二区无码在线观看| 久久亚洲国产精品| 超碰碰97| 国模大尺度精品无码视频| 天堂va欧美ⅴa亚洲va一国产| 久久久久亚洲AV成人人电影| 久久久精品免费观看| 亚洲一区二区三区无码久久| 无码一区无码二区| 五月婷婷亚洲| 丁香五月婷婷在线视频| 丁香五月区| 不卡中文一二三区| 97AV超碰| 亚洲AV无码精品| 最近2019年手机中文在线| 精品一级毛片A久久久久| www久久久| 久久99这里只有精品国产| 亚洲午夜精品A片久久WWW解说| av中文在线| 人妻无码AV中文系列免费| 久热这里在线精品| 午夜神器ios版| xxx双性人人妖精品视频| 色琪影院八戒无码| 欧美午夜精品一区区电影| 久久久精品欧美一区二区免费| 丁香婷婷综合激情五月色| 青青草a免费线观a| 麻豆久久久午夜一区二区| 国产精品国产三级国产专区51区 | 人妻天天| 中国久久| 国产日本在线| 69精品人人人| 人人澡人人澡人人澡| 97人妻无码| 粉色app福引导| 久久99AV无色码人妻蜜| 999亚洲国产精华液| 日本久久久久久久中文字幕| 大地资源二中文在线播放| 精品欧美无人区乱码毛片| 香蕉www.5.app网页在线| 久久久九色综合亚洲成色777| 无码免费人妻A片AAA毛片西瓜| 大地资源在线观看中文第二页| 最好看的中文字幕国语2019| 日本网站大全黄页| 日本三级片一区| 国产精品乱码久久久久| 蜜臀AV网站| 久久人人草| 日日干天天操| 日韩国产欧美| 仙踪林在线入口欢迎您| 一本本月无码-| 无码免费人妻A片AAA毛片西瓜| 国产熟妇BBWBBWBBW歼尸| avi电影网站| 亚洲日本少妇| 日本激情一区二区| 91在线人妻| 国产69精品麻豆| 免费三级网| 麻豆精品偷拍人妻在线网址| 久久久无码A片观看免费| 在线一卡二卡三卡不卡| 乱精品一区字幕二区| x8x8国人精品免费视频| 高清国产一区| 黑人巨大vs小早川怜子| 亚洲AV无码精品日韩韩难H| 一本大道在线无码视频| 亚洲第一色站| 中文字幕二区| 四房播播qvod| 亚洲无AV在线中文字幕| 大又大又粗又硬又爽少妇毛片| 婷婷国产亚洲精品网站| 丁香婷婷视频| 国产精品成人久久久久无码| 人人妻人人藻人人爽欧美一区 | 国产91精品人妻互换在线| 欧美大屁股流白浆xxxx视频| 国产在线视频福利| 人妻少妇久久中文字幕一区二区| 色吊丝av中文字幕| 麻豆文化传媒官方网站入口| 国产AV一区二区三区日韩| 成年女人免费视频播放7777| 91精品国产色综合亚洲四虎| 8x8ⅹ国产精品一区二区| 久久久美女| 国产乱来╳╳AV| 91中文字幕| 国产亚洲精品久久久久秋霞不卡| AV天堂午夜精品一区 | 狠狠狠地啪香蕉| 国产乱伦电影| 日韩夫妻性生活| 夜夜嗨aⅴ国产精品| 91丝袜精品久久久久久无码人妻| 国产99久久久久| 在线偷拍视频精品视频| 日本二区三区欧美亚洲国| 国产视频xxx| 草草影院第一页| 欧洲熟妇精品视频| 性生交大片免费看淑女出招| 久久久九色综合亚洲成色777| 免费无码一区二区三区A片视频| 国产精品69久久久熟女| 无吗一区二区三区| 欧美日在线| 久久最新网址| 丁香五月综合缴情电影| 日韩XXXX高潮少妇| 欧州毛片| 日韩黄片无码| 狠狠狠的在啪线香蕉| 国产超碰AV人人做人人爽| 97香蕉| 欧美一区二区无码视频| 97国产精品无码| 粉色app福引导| 内射中出| JULIA无码流出中文字幕| 无码精品一区二区三区在线a| 亚洲三级片在线观看| 亚洲无AV在线中文字幕| 亚洲欧美中文无码蝴蝶| 一区二区三区四区五区在线观看| 亚洲少妇网站| 人妻无码一区二区三区在线| 无码人妻一区| 人妻交奸日记| 乱子伦91精品亚| 精品无码久久久久久国产| 久久久久国产精品嫩草影院| 芭乐视频在线观看免费完整| 色五丁香| 国产精品久久久久久久免费| 国产亚洲av片在线观看18女人| 日韩一区三区| 蜜桃臀AV高潮无码| !精品国产99久久久久久| 久热无码视频| 日日夜夜爽| 青青免费视频观看在线视频| 免费高清av| 欲色av| 国产精品久久久久久一级毛片| 麻豆MD传媒MD0049入口| 五月色婷婷丁香无码三级| 国产gay片| 综合色综合| 豆奶app下载汅api免费下载ios| 精品深夜AV无码一区二区老年| 综合久久亚洲| 日韩一区二区三| 麻豆传煤传媒网址在线观看 | Av在线不卡免费观看| 亚洲啪啪啪| 成全视频在线观看在线| 无码中文字幕视频| 人妻精品免费| 暖暖日本手机免费观看TV| 欧美性猛交XXXX乱大交极品|